<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Fatih Selvi — Fire Engineering Blog</title>
    <link>https://selvi.org/en/blog/</link>
    <description>Fire protection engineering guides on NFPA, BS EN 12845 and FM Global standards.</description>
    <language>en</language>
    <atom:link href="https://selvi.org/en/blog/feed.xml" rel="self" type="application/rss+xml"/>
    <lastBuildDate>Wed, 25 Nov 2026 09:46:57 +0000</lastBuildDate>
    <copyright>© 2026 Fatih Selvi</copyright>
    <generator>selvi.org static (scripts/build-feeds.py)</generator>
    <image><url>https://selvi.org/images/og-selvi-en.png</url><title>Fatih Selvi — Fire Engineering Blog</title><link>https://selvi.org/en/blog/</link></image>
    <item>
      <title>NFPA 25 Water Storage Tank Checklist: A to Z</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-water-storage-tank-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-water-storage-tank-checklist</guid>
      <description>NFPA 25-2026 Chapter 9: checklist for water level, heating, exterior and interior inspection, level indicators, alarm tests and fill valves by clause number.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Water Spray System Checklist: A to Z</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-water-spray-system-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-water-spray-system-checklist</guid>
      <description>NFPA 25-2026 Chapter 10: checklist for water spray fixed system piping, nozzles, strainers, drainage, operational tests and UHSWSS, by clause number.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Water Mist Checklist: Inspection to Maintenance</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-water-mist-system-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-water-mist-system-checklist</guid>
      <description>NFPA 25-2026 Chapter 12: inspection, testing and maintenance checklist for water mist nozzles, strainers, cylinders, water quality, hoses and pumps.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Valves and Common Components Checklist: A to Z</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-valves-and-common-components-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-valves-and-common-components-checklist</guid>
      <description>NFPA 25-2026 Chapter 13: checklist for control, alarm, dry pipe, preaction and deluge valves, backflow preventers, FDCs and main drain tests, by clause.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Standpipe and Hose Checklist: Inspection to Testing</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-standpipe-and-hose-system-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-standpipe-and-hose-system-checklist</guid>
      <description>NFPA 25-2026 Chapter 6: hose, nozzle, cabinet, piping and sign inspection; 5-year flow and hydrostatic tests; Tables 6.1.1.2 and 6.5.1 with clause numbers.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Sprinkler Checklist: Inspection to Maintenance</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-sprinkler-system-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-sprinkler-system-checklist</guid>
      <description>NFPA 25-2026 Chapter 5: annual inspection, testing and maintenance checklist for sprinklers, pipe, hangers, signs, spares, sample tests and antifreeze.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Private Fire Service Mains and Hydrants Checklist</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-private-fire-service-mains-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-private-fire-service-mains-checklist</guid>
      <description>NFPA 25-2026 Chapter 7: inspection, testing, maintenance of private fire mains, hydrants, dry hydrants, monitor nozzles and hose houses; Tables 7.1.1.2, 7.5.1.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Pipe Obstruction Checklist: Assessment to Flushing</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-internal-pipe-condition-and-obstruction-investigation</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-internal-pipe-condition-and-obstruction-investigation</guid>
      <description>NFPA 25-2026 Chapter 14: 5-year internal pipe assessment, MIC testing, the 16 triggers for an obstruction investigation, five examination points, ice checks.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Impairment Management: Step-by-Step Checklist</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-impairment-management</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-impairment-management</guid>
      <description>NFPA 25-2026 Chapter 15: impairment coordinator, tags, preplanned and emergency impairments, the 10-hour rule, fire watch, notifications and restoration.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 General Requirements Checklist: Owner Duties</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-general-requirements-and-owner-responsibilities</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-general-requirements-and-owner-responsibilities</guid>
      <description>NFPA 25-2026 Chapter 4: owner responsibility, freeze protection, notification, records, automated testing and safety, plus Chapter 16, by clause.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Foam System Checklist: Inspection to Maintenance</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-foam-system-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-foam-system-checklist</guid>
      <description>NFPA 25-2026 Chapter 11: inspection, testing and maintenance checklist for foam-water sprinkler and foam systems: concentrate, proportioners, discharge, tanks.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Wed, 25 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>NFPA 25 Fire Pump Checklist: Inspection to Maintenance</title>
      <link>https://selvi.org/en/blog/nfpa25/nfpa-25-fire-pump-checklist</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/nfpa25/nfpa-25-fire-pump-checklist</guid>
      <description>NFPA 25-2026 Chapter 8: weekly, monthly and annual inspection, testing and maintenance checklist for fire pump rooms and pumps, every item with its clause.</description>
      <category>NFPA 25 Inspection, Testing &amp; Maintenance</category>
      <pubDate>Tue, 24 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Water Mist System Pumps: NFPA 20 8.3 and 8.5.4</title>
      <link>https://selvi.org/en/blog/fire-pumps/water-mist-system-pumps</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/water-mist-system-pumps</guid>
      <description>NFPA 20-2025 8.3 and 8.5.4: water mist pump capacity, NPSH plus 5 ft, inlet pressure, unloader valve or orifice and where the safety relief valve discharges.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Water Mist PD Pumping Units: NFPA 20 Section 8.4</title>
      <link>https://selvi.org/en/blog/fire-pumps/water-mist-positive-displacement-pumping-units</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/water-mist-positive-displacement-pumping-units</guid>
      <description>NFPA 20-2025 8.4: water mist PD pumping unit with a single controller, listed as a unit, ±10% in 20 s, 60 s max, sign, redundancy, variable speed and tests.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Very Tall Building Fire Pumps: NFPA 20 5.6 Rules</title>
      <link>https://selvi.org/en/blog/fire-pumps/very-tall-building-fire-pumps</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/very-tall-building-fire-pumps</guid>
      <description>NFPA 20-2025 5.6: very tall building definition, two tanks per zone, the 50 percent rule, automatic and manual refill, separate risers, overflow, backup pump.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Vertical Turbine Pump: Water Supply and Submergence</title>
      <link>https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-water-supply-submergence</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-water-supply-submergence</guid>
      <description>NFPA 20-2025 7.1–7.2.2: when a vertical turbine pump is required, water supply and well acceptance, 10 ft (3.2 m) second-impeller submergence, wet pit rules.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Vertical Turbine Pump: Driver, Gear Drive and Startup</title>
      <link>https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-driver-operation</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-driver-operation</guid>
      <description>NFPA 20-2025 7.5–7.6: vertical turbine pump drivers, 15,000-hour thrust bearing, right-angle gear, torsional coupling and 3-mass analysis, 25% margin, startup.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Vertical Turbine Pump: Column, Bowls, Strainer, Setting</title>
      <link>https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-components-installation</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-components-installation</guid>
      <description>NFPA 20-2025 7.3–7.4: turbine pump head, column weights, oil lubrication beyond 50 ft, critical speed, strainer, air release, water level, foundation.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Vertical Turbine Pump Well: Construction and Test</title>
      <link>https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-well-construction-test</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/vertical-turbine-pump-well-construction-test</guid>
      <description>NFPA 20-2025 7.2.3–7.2.7: fire pump well casings, screen, cement and gravel, tubular wells, rock formations, sand removal and the 8-hour test at 150 percent.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Variable Speed Fire Pump Controllers: NFPA 20 10.10</title>
      <link>https://selvi.org/en/blog/fire-pumps/variable-speed-fire-pump-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/variable-speed-fire-pump-controllers</guid>
      <description>NFPA 20-2025 10.10: variable speed pressure limiting controller; 20 s and 7 s bypass, 5% line reactor, 480 V–100 ft cable, 115% overpressure indicator.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Steam Turbine-Driven Fire Pumps (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/steam-turbine-driven-fire-pump</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/steam-turbine-driven-fire-pump</guid>
      <description>NFPA 20-2025 4.23 and Chapter 13: steam supply dependability, 80 psi and 70 percent rule, speed governor, 20 percent emergency trip, 240 psi gauge, acceptance.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Positive Displacement Fire Pumps (NFPA 20 8.1)</title>
      <link>https://selvi.org/en/blog/fire-pumps/positive-displacement-fire-pumps</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/positive-displacement-fire-pumps</guid>
      <description>NFPA 20-2025 8.1: positive displacement pump definition and types, listing and curves, viscosity, mechanical or lip seals, no packing and the dump valve.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>PD Pump Fittings, Drivers, Controllers, Tests: NFPA 20</title>
      <link>https://selvi.org/en/blog/fire-pumps/positive-displacement-pump-fittings-drivers-tests</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/positive-displacement-pump-fittings-drivers-tests</guid>
      <description>NFPA 20-2025 8.5–8.10: PD pump gauges, 100%/125% safety relief, strainer 10 pipe diameters away, pressure maintenance, gears, base plate, coupling, test loop.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>On-Site Standby Generator for Fire Pumps (NFPA 20 9.6)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-on-site-standby-generator</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-on-site-standby-generator</guid>
      <description>NFPA 20-2025 9.6: generator capacity, NFPA 110 Level 1 Type 10 Class X, 8 hours of fuel, transfer in the pump room and protection that picks up full load.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Medium-Voltage Fire Pump Controllers: NFPA 20 10.6</title>
      <link>https://selvi.org/en/blog/fire-pumps/medium-voltage-fire-pump-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/medium-voltage-fire-pump-controllers</guid>
      <description>NFPA 20-2025 10.6: 2.2–7.2 kV controllers; per-phase meters, no opening under load, pressure switch location, control transformer, 600%/100 s fuses, spares.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Limited Service Fire Pump Controllers: NFPA 20</title>
      <link>https://selvi.org/en/blog/fire-pumps/limited-service-fire-pump-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/limited-service-fire-pump-controllers</guid>
      <description>NFPA 20-2025 10.7: limited service controllers up to 30 hp and 600 V; AHJ acceptance, marking, short-circuit rating of at least 10,000 A, no isolating switch.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>High-Rise Building Fire Pumps: NFPA 20 Chapter 5</title>
      <link>https://selvi.org/en/blog/fire-pumps/high-rise-building-fire-pumps</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/high-rise-building-fire-pumps</guid>
      <description>NFPA 20-2025 Chapter 5: 75 ft (23 m) high-rise, access preplanned with the fire department, domestic connection on tanks, tank test header, alternate power.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Foam Concentrate and Additive Pumps (NFPA 20 8.2)</title>
      <link>https://selvi.org/en/blog/fire-pumps/foam-concentrate-additive-pumps</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/foam-concentrate-additive-pumps</guid>
      <description>NFPA 20-2025 8.2 and 8.5.3: NPSH plus 5 ft, seal compatibility, 10-minute dry run, 10% over demand, plus 25 psi discharge and safety relief return paths.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Voltage Drop: NFPA 20 9.4 15% and 5% Limits</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-voltage-drop</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-voltage-drop</guid>
      <description>NFPA 20-2025 9.4: max 15 percent drop at controller line terminals when starting, 5 percent at the contactor at 115 percent load; exemptions, wiring rules.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Troubles and Possible Causes (NFPA 20 Annex B)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-possible-causes-of-trouble</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-possible-causes-of-trouble</guid>
      <description>NFPA 20-2025 Annex B: 10 pump troubles, 32 possible causes and suggested remedies; the Figure B.1 chart and returning a controller to service after a fault.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Room Connectivity: NFPA 20 Annex C Explained</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-room-connectivity</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-room-connectivity</guid>
      <description>NFPA 20-2025 Annex C: controller data access, the ban on remote starting, security risks, access levels, one-way data recording and recommended records.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Records, Spare Parts and Maintenance (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-records-spare-parts-maintenance</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-records-spare-parts-maintenance</guid>
      <description>NFPA 20-2025 14.3–14.5: record drawings, test report and manuals for the owner, spare parts, the NFPA 25 reference and retesting after component replacement.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Power Transfer Switch: NFPA 20 10.8 Rules</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-power-transfer-switch</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-power-transfer-switch</guid>
      <description>NFPA 20-2025 10.8: Arrangements I, II-A, II-B; listing, 115% ampere rating, transfer at 85% voltage, max 3 s delayed transition, no protection in the mechanism.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Normal Power Supply: NFPA 20 9.1–9.2</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-normal-power-supply</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-normal-power-supply</guid>
      <description>NFPA 20-2025 9.1–9.2: continuous capacity, no phase converters, five normal power arrangements, single disconnect, 1 in. marking, supervision, LRC rating.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Motors and Locked Rotor Current: NFPA 20 9.5</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-motors-locked-rotor-current</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-motors-locked-rotor-current</guid>
      <description>NFPA 20-2025 9.5: NEMA Design B listed motors, Table 9.5.1.1(a)–(c) locked rotor currents, voltage ratio, 1.15 service factor, altitude and marking rules.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Junction Boxes, Wiring and Raceways (9.7–9.9)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-wiring-junction-boxes-raceways</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-wiring-junction-boxes-raceways</guid>
      <description>NFPA 20-2025 9.7–9.9: junction box rules, no controller as a junction box, the 12 in. (305 mm) rule for single conductors, sealing and listed hubs.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Foundation and Coupling Alignment: NFPA 20</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-foundation-coupling-alignment</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-foundation-coupling-alignment</guid>
      <description>NFPA 20-2025 6.4 and 6.5: common grouted base plate, rigid foundation, listed flexible coupling, ANSI/HI 1.4 and Annex A.6.5 angular and parallel alignment.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Flushing and Hydrostatic Test (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-flushing-hydrostatic-test</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-flushing-hydrostatic-test</guid>
      <description>NFPA 20-2025 14.1 and Table 14.1.1.1: suction pipe flushing rates, the 150 and 100 percent rules, 200 psi or +50 psi hydrostatic test, 2 hours, certificate.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Field Acceptance Test (NFPA 20 14.2)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-field-acceptance-test</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-field-acceptance-test</guid>
      <description>NFPA 20-2025 14.2: who attends, calibrated equipment, minimum, rated and peak load, 6 automatic + 6 manual starts, 5 minutes each and 1 hour in total.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Controller Location and Construction (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-controller-location-construction</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-controller-location-construction</guid>
      <description>NFPA 20-2025 10.1–10.3: listing, short-circuit marking, 10 s readiness, arc flash, within sight, 12 in. (305 mm) above floor, Type 2/IP31 enclosure.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Controller Components (NFPA 20 10.4)</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-controller-components</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-controller-components</guid>
      <description>NFPA 20-2025 10.4: surge arrester, 115% isolating switch and breaker, 20x instantaneous trip, 8–12 s locked rotor protection, signals and remote alarms.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fire Pump Alternate Power: When NFPA 20 9.3 Requires It</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-alternate-power</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-alternate-power</guid>
      <description>NFPA 20-2025 9.3: alternate power for unreliable sources and high-rise buildings, backup pump exception, generator or independent source, overhead lines.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Electric Fire Pump Starting and Stopping: NFPA 20</title>
      <link>https://selvi.org/en/blog/fire-pumps/electric-fire-pump-starting-stopping</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/electric-fire-pump-starting-stopping</guid>
      <description>NFPA 20-2025 10.5: pressure and remote contact starting, 5 to 10 s sequencing, automatic testing, emergency-run handle, manual stop and the 10-minute run timer.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fuel Piping, Solenoid Valve and Fuel Type (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-fuel-piping-level-fuel-type</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-fuel-piping-level-fuel-type</guid>
      <description>NFPA 20-2025 11.4: diesel fire pump fuel piping fittings, line protection, solenoid valve bypass, fuel grade marking, 10% derating for DF #1, and bonding.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Room Ventilation (NFPA 20 11.3)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-pump-room-ventilation</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-pump-room-ventilation</guid>
      <description>NFPA 20-2025 11.3: four ventilation functions in a diesel pump room, 120 °F (49 °C) air cleaner inlet, 0.2 and 0.3 in. water column limits, dampers, wind wall.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine: Weekly Run and Upkeep (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-weekly-run-maintenance</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-weekly-run-maintenance</guid>
      <description>NFPA 20-2025 11.6: diesel fire pump engine run weekly for at least 30 minutes, kept clean and lubricated, battery upkeep and posted emergency steps.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine Starting and Stopping (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-starting-and-control</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-starting-and-control</guid>
      <description>NFPA 20-2025 12.7: diesel fire pump controller pressure starting, sequencing, automatic testing, 6 × 15 s cranking cycle, two batteries and stopping rules.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine Listing and Derating (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-listing-and-rating</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-listing-and-rating</guid>
      <description>NFPA 20-2025 11.1–11.2: diesel fire pump engine type, listing, nameplate rating, 4-hour rating, altitude 3% per 1000 ft and temperature 1% per 10 °F derating.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine Governor, Overspeed and Alarms</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-governor-overspeed-instruments</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-governor-overspeed-instruments</guid>
      <description>NFPA 20-2025 11.2.4–11.2.6: diesel fire pump engine 10% speed regulation, 20 s acceleration, alternate ECM, 10–20% overspeed shutdown, signals and instruments.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine Cooling and Lubrication (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-cooling-and-lubrication</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-cooling-and-lubrication</guid>
      <description>NFPA 20-2025 11.2.8–11.2.9: diesel pump engine heat exchanger and radiator cooling, water line order, bypass, 120% regulator, waste outlet, oil heater.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Fire Pump Engine Batteries and Charging (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-batteries-and-charging</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-batteries-and-charging</guid>
      <description>NFPA 20-2025 11.2.7 and 12.6: diesel fire pump battery units A and B, 6 cranking cycles at 40 °F, 72-hour standby, 1.5 A load, battery location and chargers.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Diesel Engine Drive Controller: Location, Alarms (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/diesel-engine-drive-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/diesel-engine-drive-controllers</guid>
      <description>NFPA 20-2025 12.1–12.4: diesel fire pump controller listing, location, enclosure, wiring, alarms and trouble signals, silencing times and pressure recorder.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Centrifugal Fire Pump Types and Fittings: NFPA 20</title>
      <link>https://selvi.org/en/blog/fire-pumps/centrifugal-fire-pump-types-fittings</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/centrifugal-fire-pump-types-fittings</guid>
      <description>NFPA 20-2025 6.1 and 6.3: overhung and between-bearings centrifugal pumps, no suction lift, packing, pump fittings and the 0.50 in. automatic air release.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Air-Starting Diesel Engines and Controllers (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/air-starting-engine-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/air-starting-engine-controllers</guid>
      <description>NFPA 20-2025 11.2.7.4 and 12.8: 180- and 90-second air containers, containers A and B, compressors, pressure supervision and a single ~90 s crank.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Additive Pump Motor Controllers: NFPA 20 10.9</title>
      <link>https://selvi.org/en/blog/fire-pumps/additive-pump-motor-controllers</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/additive-pump-motor-controllers</guid>
      <description>NFPA 20-2025 10.9: additive (foam) pump motor controller; start on opening of a closed loop, manual stop, no automatic shutdown, lockout and marking.</description>
      <category>Fire Pumps</category>
      <pubDate>Sat, 14 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Where Does the Fire Pump Main Relief Valve Go?</title>
      <link>https://selvi.org/en/blog/fire-pumps/fire-pump-main-relief-valve-location</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/fire-pump-main-relief-valve-location</guid>
      <description>NFPA 20-2025 4.20: when a main relief valve is required, why it sits between the pump and check valve, the 121% check, type, discharge, no shutoff valve.</description>
      <category>Fire Pumps</category>
      <pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Standard Fire Pump Capacities: Table 4.10.2 (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/standard-fire-pump-capacities</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/standard-fire-pump-capacities</guid>
      <description>NFPA 20-2025 4.10 and Table 4.10.2: 21 rated capacities from 25 to 5000 gpm, at least 40 psi net, demand ≤ 150%, the 90–140% advice and review above 5000 gpm.</description>
      <category>Fire Pumps</category>
      <pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Self-Regulating Variable Speed Fire Pump Unit (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/self-regulating-variable-speed-fire-pump</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/self-regulating-variable-speed-fire-pump</guid>
      <description>NFPA 20-2025 4.8: a variable speed pump listed as a unit; IP66 enclosure, 5% reactance, ten VFD alarms, ±10% in 20 s, 25% pressure at no flow, 2-year records.</description>
      <category>Fire Pumps</category>
      <pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Packaged Fire Pump Assembly Requirements (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/packaged-fire-pump-assembly</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/packaged-fire-pump-assembly</guid>
      <description>NFPA 20-2025 4.31: packaged fire pump assemblies and pump houses; listing, welders, transit, lifting points, anchoring, floor drainage and the shop hydrotest.</description>
      <category>Fire Pumps</category>
      <pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Multistage Multiport Fire Pump (NFPA 20)</title>
      <link>https://selvi.org/en/blog/fire-pumps/multistage-multiport-fire-pump</link>
      <guid isPermaLink="true">https://selvi.org/en/blog/fire-pumps/multistage-multiport-fire-pump</guid>
      <description>NFPA 20-2025 4.9: a single-driver pump with impellers in series and several ports; how it differs from series pumps, no valve between impellers, per-port rules.</description>
      <category>Fire Pumps</category>
      <pubDate>Thu, 12 Nov 2026 00:00:00 +0000</pubDate>
    </item>
  </channel>
</rss>
