Turkey has 12,000 MW installed wind energy; Balikesir Bares, Manisa Soma and Izmir Cesme WPPs lead. A modern 4-6 MW turbine has a 100 m nacelle holding 400 L hydraulic + 3 t gearbox oil. NFPA 850 requires nacelle FM-200 or water mist, tower egress, dry-type transformer and lightning protection.

Nacelle Hazard

Suppression

Tower Egress

Lightning Protection

Turkey WPPs

Wind with SprinkCalc

SprinkCalc sizes wind-turbine nacelle FM-200, water mist 70 bar, dry transformer, lightning LPS Class I and NFPA 850 layout.

Download SprinkCalc on the App Store
Sources & Further Reading

NFPA 850, IEC 61400-24, DNV-GL, GWO BST, FM Global DS 5-14. NFPA 850 Fire Protection for Electric Generating Plants.

FS

Fatih Selvi

Mechanical engineer and software developer. 16+ years of MEP and fire protection experience.