Source: BS EN 12845+A2:2026, Clause G.3 "Clothes in multiple garment hanging storage", G.3.1-G.3.5 (EN p.145-146), G.3.6 (EN p.146), G.3.7 with Figure G.1 (EN p.147).
This is one of the most detailed clauses in Annex G. Two frequent mistakes should be corrected at the outset: hanging garment storage is G.3 (G.5 is idle pallets), and the ceiling density is given in G.3.5 as a single value, but conditionally.
G.3.1 Scope
Clause G.3.1 (EN p.145) sets out special requirements for intensive hanging garment stores in which multiple rows of garment racks are arranged on two or more levels. Garment delivery, picking or transport in these stores might be automatic or semi-automatic, and the raised storage levels are normally reached by walkways and ramps. Typically the decks are not fire-separated from one another, and the walkways, aisles, ramps and garment racks substantially obstruct sprinkler protection from ceiling level.
Clause G.3.1 continues (EN p.146): Protection of hanging garments stored in carousels or vertical blocks without aisles, and of configurations other than those described in G.3, is beyond the scope of this annex.
G.3.2 Categorization
Clause G.3.2 (EN p.146) is a single sentence: the annex requirements must be applied to every type of garment, whatever its storage category.
In other words, whatever the garment type, G.3 applies.
G.3.3 Sprinkler protection other than at ceiling
Clause G.3.3 (EN p.146) requires the sprinkler protection to be in accordance with the requirements for in-rack sprinklers, and gives the following geometric limits:
| Topic | Value | Source |
|---|---|---|
| Rows of hanging garments side by side in each garment rack | Maximum 2 rows | G.3.3, EN p.146 |
| Storage height between intermediate levels of sprinklers | 3.5 m | G.3.3, EN p.146 |
| Aisle width between racks | At least 0.8 m | G.3.3, EN p.146 |
| Sprinkler row protecting each rack | Single row | G.3.3, EN p.146 |
| Spacing between sprinkler rows | Does not exceed 3.0 m | G.3.3, EN p.146 |
| Horizontal sprinkler interval along the rack | Does not exceed 2.8 m | G.3.3, EN p.146 |
| Distance from the rack end to the nearest sprinkler | Maximum 1.4 m | G.3.3, EN p.146 |
| Clearance between the top of the garments and the sprinkler deflector | At least 0.15 m | G.3.3, EN p.146 |
The sprinklers installed directly above the garment racks are stagger-spaced in the vertical plane (Figure G.1, EN p.147).
Baffle (capping)
Clause G.3.3 (EN p.146): unless modified by the exception below, every sprinkler row over the garment racks must be capped with a continuous, solid, horizontal baffle no smaller than the garment row in length and width. The baffle must be made of Euroclass A1 or A2 material, or of an equivalent material under an existing national classification system.
Exception: the upper level of rack protection and the baffle might be left out if the gap from the top of the garments up to the ceiling sprinkler deflectors is no more than 3 m.
Below ramps and walkways
Clause G.3.3 (EN p.146): sprinklers must be fitted underneath every access ramp, main aisle, walkway and transport route; the only exception is an aisle no wider than 1.2 m running between sprinkler protected garment storage rows.
G.3.4 Sprinklers in operation
Clause G.3.4 (EN p.146) gives the hydraulic calculation assumption:
- Rows: 3
- Levels: ≤ 3
- Sprinklers per row: 3
Where there are more than 3 levels of sprinkler protection, 3 rows of 3 sprinklers on 3 protected levels are assumed to operate. Where there are three levels or less, 3 rows of 3 sprinklers on all protected levels are assumed to operate.
G.3.5 Ceiling sprinklers
Clause G.3.5 (EN p.146): the ceiling sprinklers must be designed for 7.5 mm/min over an area of operation of 260 m², on condition that the top rack level is capped and protected by rack sprinklers.
If that top level or the capping is not provided, the ceiling sprinkler design must be based on Category III goods or higher, with the stack height measured from just above the highest intermediate level sprinklers up to the top of the hanging garments.
In other words, 7.5 mm/min over 260 m² is not an unconditional design value; it is valid where the capping and the upper level rack protection are present. If the condition is not met, the design falls back to Table 4 (EN p.38) via Category III.
G.3.6 Automatic shutdown
Clause G.3.6 (EN p.146): "Operation of the sprinkler system shall automatically stop all automated distribution systems within the warehouse."
G.3.7 Control valve set
Clause G.3.7 (EN p.147) is a single sentence: "All installations shall be of the wet pipe type."
What the standard does not say here
- A stepped density table by height (for example one value up to 3 m and another between 3 m and 6 m). Clause G.3.5 gives a single density and one condition.
- ESFR design, K-factor, operating pressure or number of sprinklers.
- A response time index (RTI) value or a "quick response" requirement. G.3 gives no figure for sprinkler sensitivity.
- Raising the category according to the proportion of plastic hangers. G.3 gives no provision on this; G.3.2 only says that the requirements apply to all types of garments irrespective of their storage category.
- A cover intended to prevent dripping. The purpose of the baffle is defined in the standard as capping.
Field note
Field note (not from the standard, this is engineering interpretation): in these stores the single decision that determines the fate of the design is whether the uppermost level is capped or not. If the capping is given up, the ceiling design rests on a completely different basis; for that reason this decision has to be settled with the architecture and the warehouse automation at the start of the project.
Frequently Asked Questions
What is the ceiling sprinkler design in a hanging garment store?
BS EN 12845+A2:2026 Clause G.3.5 (EN p.146): the ceiling sprinklers must deliver 7.5 mm/min over a 260 m² area of operation, but only on condition that the top rack level is capped and has its own rack sprinklers. Where that top level or its capping is left out, the ceiling sprinklers must instead be designed for no less than Category III goods.
How are garment racks arranged?
Clause G.3.3 (EN p.146): each garment rack is limited to two rows of hanging garments side by side and to a storage height of 3.5 m between intermediate levels of sprinklers. Each rack is separated by an aisle of at least 0.8 m width and is protected by a single row of sprinklers. The spacing between sprinkler rows does not exceed 3.0 m.
What are the sprinkler spacing and clearance rules?
Clause G.3.3 (EN p.146): the sprinklers directly above the garment racks must be staggered in the vertical plane and spaced no more than 2.8 m apart horizontally along the rack, with a sprinkler within 1.4 m of the rack end. The top of the garments must be at least 0.15 m below the sprinkler deflector.
Why and how is a baffle (capping) provided?
Clause G.3.3 (EN p.146): every sprinkler row over the garment racks must be capped with a continuous, solid, horizontal baffle no smaller than the garment row in length and width, made of Euroclass A1 or A2 material or an equivalent under an existing national classification system. The upper level of rack protection and the baffle might be left out if the gap from the top of the garments up to the ceiling sprinkler deflectors is no more than 3 m.
How many rack sprinklers are assumed to operate in the hydraulic calculation?
Clause G.3.4 (EN p.146): 3 rows, 3 sprinklers per row, a maximum of 3 levels. Where there are more than 3 levels of protection, 3 rows of 3 sprinklers on 3 levels are assumed to operate; where there are 3 levels or less, 3 rows of 3 sprinklers are assumed on all protected levels.
What is required for the installation type and the automation in these stores?
Clause G.3.6 (EN p.146): operation of the sprinkler system automatically stops all automated distribution systems within the warehouse. Clause G.3.7 (EN p.147): all installations have to be of the wet pipe type.
References
- BS EN 12845+A2:2026 Clause G.3.1 (EN p.145-146)
- BS EN 12845+A2:2026 Clauses G.3.2, G.3.3, G.3.4, G.3.5, G.3.6 (EN p.146)
- BS EN 12845+A2:2026 Clause G.3.7 and Figure G.1 (EN p.147)
- BS EN 12845+A2:2026 Table 4 (EN p.38)

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreBS EN 12845+A2:2026 (EN 12845:2015+A2:2026) Fixed firefighting systems — Automatic sprinkler systems — Design, installation and maintenance; BS EN 12845-2:2025 (EN 12845-2:2024) ESFR and CMSA sprinkler systems. Every figure in this article is taken from the published standard text; clause, table and page references are listed under References. General information only, not a substitute for the standard or for a design review.