EN 12845 Articles

The European automatic sprinkler standard translated into field practice — hazard classes, design density, hydraulics, pumps and water supplies, storage, ESFR and CMSA, installation and maintenance.

Hazard ClassesHydraulicsPumpsStorageESFR & CMSAMaintenance
EN 12845

CMDA vs CMSA vs ESFR — Three-Mode Comparison

CMDA classical control, CMSA large droplet, ESFR suppression: a decision matrix comparing K-factor, pressure and water demand across the three modes.

Fatih Selvi9 min
EN 12845

CMSA Design Criteria in Detail

CMSA design criteria: K-factor, pressure, number of design sprinklers, commodity-to-listing matching and in-rack coordination in detail.

Fatih Selvi9 min
EN 12845

EN 12845 Alternate (Seasonal) Installations

EN 12845 alternate installations: the summer wet and winter dry cycle, the changeover procedure, the 25% enlarged design area and the field errors...

Fatih Selvi8 min
EN 12845

EN 12845 Annex D — Installation Zoning Rules

EN 12845 Annex D zoning: maximum zone area, zone valve location, flow alarms, multi-storey zone distribution and correct zone planning on site.

Fatih Selvi8 min
EN 12845

EN 12845 Annex E — High-Rise Requirements

EN 12845 Annex E high-rise sprinklers: the 45 m threshold, OH3 design, subdivision into installations of not more than 45 m, valve standing pressures, the 12 bar exception and one superior single water supply.

Fatih Selvi9 min
EN 12845

EN 12845 Annex F — Additional Reliability Measures

EN 12845 Annex F system reliability: 2 400 m² zones for LH/OH, wet pipe installations, quick response sprinklers, full operation during alarm valve servicing, one superior single water supply and theatre measures.

Fatih Selvi8 min
EN 12845

EN 12845 Annex G — Aerosol Product Storage

EN 12845 Annex G aerosol storage: the cage requirement, the alcohol and hydrocarbon based rows of Table G.1 (12.5 mm/min over 260 m² and 25.0 mm/min over 300 m²) and quick response in-rack sprinklers.

Fatih Selvi9 min
EN 12845

EN 12845 Annex G — Flammable Liquid Storage

EN 12845 Annex G flammable liquid storage: four classes by flash and boiling point, metal drums by orientation and tier, and the Tables G.2-G.4 design rules (7.5-25 mm/min over 450 m²).

Fatih Selvi9 min
EN 12845

EN 12845 Annex G — Idle Pallet Storage

EN 12845 Annex G idle timber and plastic pallet storage: stack heights, indoor and outdoor separation, sprinkler design density and distance rules.

Fatih Selvi8 min
EN 12845

EN 12845 Annex G — Nonwoven Synthetic Fabric Storage

EN 12845 Annex G storage of nonwoven synthetic fabric: the Table G.7 height ladder (10.0-30.0 mm/min over 260/300 m²), Category IV in-rack protection with 12.5 mm/min over 260 m² at the ceiling, and the Annex L note above 4.1 m.

Fatih Selvi8 min
EN 12845

EN 12845 Annex G — PP/PE Storage Bins

EN 12845 Annex G PP/PE storage bins: HHS Category IV, 1.5 m / 2 m in-rack spacing on ST4, the 3 m storage limit with non-inflammable (e.g. steel) pallets, and the mandatory film forming foam additive.

Fatih Selvi8 min
EN 12845

EN 12845 Annex G — Wooden Cask Spirit Storage

EN 12845 Annex G storage of spirit based liquors (over 20% alcohol) in wooden barrels: the 4.6 m ceiling-only limit, 15 mm/min over 360 m², in-rack sprinklers above 4.6 m and recommended drainage or bunding.

Fatih Selvi9 min
EN 12845

EN 12845 Annex H — System Monitoring

EN 12845 Annex H system monitoring: supervised valves, pressure, water level, pump controller signals, alarm panels and continuous supervision prin...

Fatih Selvi8 min
EN 12845

EN 12845 Annex I — Alarm Transmission Levels

EN 12845 Annex I alarm transmission levels: only two alarm levels (A fire, B fault), the Table I.1 assignments and transmission to a permanently attended location.

Fatih Selvi8 min
EN 12845

EN 12845 Annex J — Impairment Procedures

EN 12845 Annex J impairment management: planned and unplanned outages, tagging, fire watches, insurer notification and the restoration procedure.

Fatih Selvi8 min
EN 12845

EN 12845 Annex Q — Periodic System Inspection

EN 12845 periodic inspection and Annex Q: the qualified person, the at least yearly inspection, the recommended independent body, the report scope and the list of deviations.

Fatih Selvi8 min
EN 12845

EN 12845 Area of Operation: Shape and Location

EN 12845 area of operation shape: the 1.2 x root A rectangle rule, selecting the hydraulically most remote sprinkler group, and solving the narrow...

Fatih Selvi8 min
EN 12845

EN 12845 Beams, Ceilings and Sprinkler Layout

EN 12845 structural obstruction rules: deflector geometry under beams, the every-third-bay rule for narrow bays, roof truss flange clearances and s...

Fatih Selvi10 min
EN 12845

EN 12845 Block Plan, Signage and Marking Rules

EN 12845 block plan sign content, sprinkler valve marking, zone maps, fire service signs, spare sprinkler cabinets and correct signage on site.

Fatih Selvi7 min
EN 12845

EN 12845 Concealed Space Pipework and Sprinklers

EN 12845 sprinkler requirements in concealed spaces above ceilings, below raised floors and in roof voids: material class, airflow risk and testing...

Fatih Selvi8 min
EN 12845

EN 12845 Design Density and Area of Operation

EN 12845 design density (mm/min) and area of operation: reading the density-area tables, the 25% dry system increase and the basis of the hydraulic...

Fatih Selvi8 min
EN 12845

EN 12845 Diesel Engine Pump Sets

EN 12845 diesel pump sets: A2:2026 Clause 10.9 refers the pump set to EN 17451 and keeps only fresh air, the four starter alarm indications and the site commissioning test; the 15 s rule now applies only to electric pump sets.

Fatih Selvi8 min
EN 12845

EN 12845 Diesel Pump Batteries, Chargers and Starters

EN 12845 diesel fire pump starting: A2:2026 Clause 10.9 leaves batteries, chargers and start attempts to EN 17451; what remains are the four alarm indications, Annex I transmission and the monthly battery check.

Fatih Selvi8 min
EN 12845

EN 12845 Diesel Pump Weekly Exercise Test

The EN 12845 weekly diesel pump routine: 20 minute run, automatic start and manual restart, fuel, oil and coolant checks, log book content and c...

Fatih Selvi9 min
EN 12845

EN 12845 Drain, Test and Flushing Valves

EN 12845 drain valves, alarm and remote test valves, flushing connections with the Table 39 drain sizes and the weekly, quarterly and annual routines that use these valves.

Fatih Selvi8 min
EN 12845

EN 12845 Dry Pipe Installations

EN 12845 dry pipe sprinkler installations: air charging, water transit time (60/90 s), use in freezing areas, the 25% design area increase and comp...

Fatih Selvi8 min
EN 12845

EN 12845 Electric Sprinkler Pump Sets

EN 12845 electric pump sets: the dedicated supply, the 15 second rule, cabling and labelling rules, pump monitoring, and the protection provisions deleted in A2:2026.

Fatih Selvi10 min
EN 12845

EN 12845 Electrical Flow and Pressure Switches

EN 12845 electrical monitoring: flow and pressure switches, tamper switches, low level and temperature supervision, type A and B alarms and fire pa...

Fatih Selvi10 min
EN 12845

EN 12845 Fitting and Valve Pressure Losses

The EN 12845 equivalent length method: fitting and valve values, alarm valve and backflow additions, a worked example and the tee-counting error.

Fatih Selvi8 min
EN 12845

EN 12845 Frost Protection Strategies

EN 12845 freeze protection: dry systems, alternate wet and dry, glycol antifreeze, heat tracing and sprinkler design in freeze-prone areas.

Fatih Selvi8 min
EN 12845

EN 12845 HHP High Hazard Process Design

EN 12845 HHP classes: paint, plastic injection, rubber and timber processing. 7.5/10.0/12.5 mm/min over 260 m2, K115 selection, the HHP4 deluge exc...

Fatih Selvi8 min
EN 12845

EN 12845 HHS High Hazard Storage Design

EN 12845 high hazard storage: ST1-ST6 configurations, Category I-IV commodities, design density by height band and the 260-300 m2 area of operation.

Fatih Selvi9 min
EN 12845

EN 12845 In-Rack Sprinkler Layout by ST1-ST6

EN 12845 in-rack sprinkler layout across ST1-ST6 rack configurations: flue spacing, vertical intervals, K-factor, water shields and hydraulic desig...

Fatih Selvi9 min
EN 12845

EN 12845 Light Hazard (LH) Design

EN 12845 light hazard: 2.25 mm/min density over 84 m2, K57 sprinklers and no dry or alternate installation (OH1 is used instead). Pre-calculated design and a worked pipe friction example.

Fatih Selvi8 min
EN 12845

EN 12845 Maximum Sprinkler Coverage Area

EN 12845 coverage limits: LH 21 m2, OH 12 m2, HHP/HHS 9 m2, the separate sidewall table, reductions under obstructions and a worked example.

Fatih Selvi8 min
EN 12845

EN 12845 Minimum Distance Between Sprinklers

Why sprinklers closer than 2 m fail to operate: cold soldering, deflector-to-ceiling distance, and the rules for approaching walls, beams and canop...

Fatih Selvi8 min
EN 12845

EN 12845 Minimum Pipe Diameters

EN 12845 minimum DN values for fully calculated systems, the pre-calculated range and distribution sizes, and how steel grade and galvanising chang...

Fatih Selvi8 min
EN 12845

EN 12845 Minimum Sprinkler Discharge Pressure

EN 12845 minimum sprinkler discharge pressure: LH 0.7 bar, OH 0.35 bar, HHP/HHS 0.5 bar, absolute versus average minimum, in-rack 1.0 bar (K115) and 2.0 bar (K80).

Fatih Selvi8 min
EN 12845

EN 12845 Monthly Routine — Battery Checks

The EN 12845 monthly routine: diesel pump starter batteries, control panel cells, electrolyte specific gravity, replacement decisions and charger c...

Fatih Selvi7 min
EN 12845

EN 12845 Ordinary Hazard (OH1-OH4) Design

EN 12845 OH1 to OH4: the 5.0 mm/min density, 72-360 m2 areas of operation, the 25% dry system increase and the 0.35 bar OH minimum and the 0.56 bar a K80 sprinkler needs for 5.0 mm/min over 12 m².

Fatih Selvi8 min
EN 12845

EN 12845 Pipe Friction Loss: Hazen-Williams

The EN 12845 Hazen-Williams formula, C coefficients by material (mild steel 120, stainless 140, copper 140) and a DN50 worked example.

Fatih Selvi8 min
EN 12845

EN 12845 Pipe Supports and Hanger Spacing

EN 12845 pipe support rules: 4 m for steel and 2 m for copper, the 50 percent exception, grooved joint rules, hanger load tables and the seismic gap.

Fatih Selvi9 min
EN 12845

EN 12845 Pre-Action Installations: Type A and Type B

EN 12845 pre-action installations: Type A (opened by detection only), Type B (opened by detection or by sprinkler operation), EN 54 detection and installation size limits.

Fatih Selvi8 min
EN 12845

EN 12845 Pre-Calculated Design for HHP and HHS

EN 12845 pre-calculated sizing for high hazard: K-factor limits, sprinkler count restrictions, the range and distribution tables, and the move to f...

Fatih Selvi8 min
EN 12845

EN 12845 Pre-Calculated LH Design

EN 12845 pre-calculated light hazard design: K57 sprinklers, the four-sprinkler rule, range pipe sizes, the 225 L/min pump duty and the most common...

Fatih Selvi8 min
EN 12845

EN 12845 Pre-Calculated OH Design

EN 12845 pre-calculated design for OH1-OH4: range and distribution pipe sizes, K80 sprinklers, the 0.35 bar minimum, wet versus dry, and pump flow.

Fatih Selvi8 min
EN 12845

EN 12845 Pressure Tanks

EN 12845 pressure tanks: limited to LH and OH1, the air-to-water ratio, the tank pressure formula, pressure equipment maintenance and why modern pr...

Fatih Selvi8 min
EN 12845

EN 12845 Pump Controllers and Monitoring

EN 12845 pump controllers: automatic start from two pressure switches, the manual-only stop rule, the mandatory alarm signals and BMS integration.

Fatih Selvi8 min
EN 12845

EN 12845 Pump Performance Characteristics

The EN 12845 pump pressure-flow curve: Table 16 nominal and characteristic points, the Table 14 nominal flow, Figure 7 for calculated systems, closed valve pressure and the 12 bar limit, with field practice.

Fatih Selvi8 min
EN 12845

EN 12845 Pump Room Requirements: Ventilation, Drainage, Lighting

EN 12845 pump room requirements: the 60 min fire-resistant compartment and its order of preference, 4 C / 10 C minimum temperatures, sprinkler protection of the room, the single ventilation sentence, and why drainage, lighting and clearances lie outside the standard.

Fatih Selvi8 min
EN 12845

EN 12845 Pump Suction Conditions and Pump Room Layout

EN 12845 suction and pump room rules: positive suction head, the NPSHa-NPSHr margin, the 60 min fire-resistant compartment, 4 C (electric) / 10 C (diesel) minimum room temperatures and fi...

Fatih Selvi8 min
EN 12845

EN 12845 Quarterly and Half-Yearly Routines

EN 12845 quarterly (13 week) and half-yearly maintenance: hazard review, sprinkler cleaning, coatings, water supply testing, dry valve exercising a...

Fatih Selvi8 min
EN 12845

EN 12845 Reduced Capacity Tanks

EN 12845 reduced capacity sprinkler tanks: guaranteed town main infill, automatic filling, minimum effective volumes and the field errors that follow.

Fatih Selvi8 min
EN 12845

EN 12845 Sidewall Sprinklers

EN 12845 sidewall sprinkler layout: maximum coverage area, room width, number of rows, deflector position, K-factor selection and field errors.

Fatih Selvi8 min
EN 12845

EN 12845 Sprinkler Flow and K-Factor

EN 12845 K-factors: the formula Q = K root P with P in bar, K57-K160 by hazard class from Table 37a, the minimum pressures, NFPA equivalents and the K160-K480 range of EN 12845-2.

Fatih Selvi8 min
EN 12845

EN 12845 Sprinkler Thermal Sensitivity and RTI Classes

EN 12845 thermal sensitivity: quick, special and standard A response classes, why the standard gives no RTI numbers, Table 38 (quick response in racks, not in dry or pre-action Type A), the ceiling-rack ranking rule and Annex F.

Fatih Selvi8 min
EN 12845

EN 12845 Storage Configurations: ST1 to ST6

The EN 12845 ST1-ST6 storage configurations: block stacking, post pallets, beam pallet racking and shelves, with the Table 2 limits, ceiling and in-rack protection, and the configurations the standard does not cover.

Fatih Selvi8 min
EN 12845

EN 12845 Subsidiary Dry and Alternate Extensions

EN 12845 subsidiary extensions: design limits for small dry or alternate branches fed from a wet system, sprinkler counts, water delivery time and...

Fatih Selvi8 min
EN 12845

EN 12845 Town Main as a Water Supply

EN 12845 conditions for using the town main as a sprinkler water supply: the three-point pressure-flow test at maximum demand, water authority approval, boosted mains, other services taken from the main and the connection arrangement.

Fatih Selvi8 min
EN 12845

EN 12845 Underground and Above-Ground Pipework

EN 12845 pipework: underground and above-ground materials, corrosion resistance, welding and flexible joints, supports and hangers, and the 15 bar / 2 h hydrostatic commissioning test.

Fatih Selvi8 min
EN 12845

EN 12845 Water Flow Alarm and Water Motor Gong

EN 12845 water motor alarms: the Pelton gong, pressure switches, retard chambers and the site installation errors, with an NFPA 13 comparison.

Fatih Selvi7 min
EN 12845

EN 12845 Water Spray Subsidiary Extensions

EN 12845 subsidiary water spray extensions on a sprinkler system: deluge valves, the 80 mm connection limit, the additional water demand, why the standard gives no density, and the Annex F.7 theatre drencher.

Fatih Selvi8 min
EN 12845

EN 12845 Water Supply Test Arrangements and Test Procedure

EN 12845 water supply testing: the three-point pressure-flow curve plus static pressure, flow meter accuracy and capacity (±5 %, 140 %), the ±1.6 % test gauge and the annual test routine from field practice.

Fatih Selvi8 min
EN 12845

EN 12845 Weekly User Routine

The EN 12845 weekly routine: pressure and level checks, water motor alarm test, automatic pump start test, diesel restart, trace heating and logboo...

Fatih Selvi8 min
EN 12845

EN 12845 Wet Pipe Installations

EN 12845 wet pipe sprinkler installations: permanently water-filled pipework, no freezing risk and the 95 C upper limit (no 4 C rule in 11.1.1), the default installation type, alarm valve area limits an...

Fatih Selvi8 min
EN 12845

EN 12845 Zone Test and Drainage Facilities

EN 12845 zone test connection, alarm test valve, drainage arrangements, low-point drains, inspector test connection and correct drainage design on...

Fatih Selvi8 min
EN 12845

EN 12845-1 Annex N — The CMSA Informative Annex

EN 12845-1 Annex N: the normative referral annex for CMSA, its two subclauses, the EN 12845-2 Annex A class conversion and where the CMSA design criteria now sit.

Fatih Selvi8 min
EN 12845

EN 12845-1 Annex P — The ESFR Informative Annex

EN 12845-1 Annex P: the normative annex that makes EN 12845-2 binding for ESFR, the recommended three 50% pump sets, the Annex A class conversion and where the ESFR numbers actually are.

Fatih Selvi8 min
EN 12845

EN 12845-2 Annex O — P&ID Flow Diagram Example

EN 12845-1 Annex O: the informative single-figure P&ID example, where the standard requires a P&ID, instrument details on layout drawings and the topics the annex does not cover.

Fatih Selvi8 min
EN 12845

ESFR Design Criteria in Detail

ESFR design in detail: K-factor, pressure, design sprinklers, water demand, hydraulic calculation, ceiling conditions and commodity compatibility.

Fatih Selvi9 min
EN 12845

ESFR and CMSA Placement & Clearance Rules

ESFR and CMSA sprinkler placement: distance below ceiling, deflector position, sprinkler spacing and clear space above the top of storage.

Fatih Selvi7 min
EN 12845

HHS5–HHS12 High-Bay Sprinkler Design

HHS5 and the 12-sprinkler ESFR design of EN 12845-2 Clause 5.4: why there is no HHS6 or beyond, the additional requirements, water demand from the standard's values and the pump arrangement.

Fatih Selvi9 min
EN 12845

NFPA 13 vs EN 12845: A Detailed Comparison

A clause-by-clause comparison of NFPA 13 and EN 12845: units, density and area, K-factor notation, design method, water supply duration, hazard cla...

Fatih Selvi11 min
EN 12845

Obstructions to ESFR and CMSA Discharge

Obstruction rules for ESFR and CMSA: how beams, HVAC ducts, light fittings and rack supports affect the sprinkler discharge pattern.

Fatih Selvi8 min
EN 12845

Protecting Unheated Areas with ESFR and CMSA

ESFR and CMSA protection in unheated, freeze-prone warehouses: dry pipe valves, pre-action, antifreeze and cold-store sprinkler strategy.

Fatih Selvi8 min
EN 12845

Roof Slope, Skylight and Ventilation Limits

Roof slope, skylight and smoke-vent limits for ESFR and CMSA sprinkler systems, with standard values and alternative design strategies.

Fatih Selvi8 min
EN 12845

The ESFR Concept — K-Factor and Suppression

The ESFR (Early Suppression Fast Response) concept: K-factor selection (K200, K240, K360), RTI, suppression versus control, pressure and droplet ve...

Fatih Selvi9 min