English guides to EN 12845 automatic sprinkler systems: hazard classification, design density and area of operation, sprinkler spacing, pipework, pump sets, water supplies and EN 12845-2 storage protection, with clause references to BS EN 12845+A2.

Hazard ClassesHydraulicsPumpsStorageESFR & CMSAMaintenance

All articles

EN 12845

EN 12845 Annex D: Installation Zoning Rules

EN 12845 Annex D zoning: maximum zone area, zone valve location, flow alarms, multi-storey zone distribution and correct zone planning on site.

8 min
EN 12845

EN 12845 Annex E: High-Rise Building Requirements

EN 12845 Annex E high-rise sprinklers: the 45 m threshold, OH3 design, subdivision into installations of not more than 45 m, valve standing pressures, the 12 bar exception and one superior single water supply.

9 min
EN 12845

EN 12845 Annex F: Additional Measures for Reliability

EN 12845 Annex F system reliability: 2 400 m² zones for LH/OH, wet pipe installations, quick response sprinklers, full operation during alarm valve servicing, one superior single water supply and theatre measures.

8 min
EN 12845

EN 12845 Annex G.7: Non-woven Synthetic Fabric Storage

EN 12845 Annex G storage of nonwoven synthetic fabric: the Table G.7 height ladder (10.0-30.0 mm/min over 260/300 m²), Category IV in-rack protection with 12.5 mm/min over 260 m² at the ceiling, and the Annex L note above 4.1 m.

8 min
EN 12845

EN 12845 Annex K: Twenty-Five Year Inspection

EN 12845 Annex K 25-year sprinkler sampling test: sample numbers, laboratory testing, K-factor verification, RTI measurement and service life asses...

8 min
EN 12845

EN 12845 Design Density and Area of Operation

EN 12845 design density (mm/min) and area of operation: reading the density-area tables, the 25% dry system increase and the basis of the hydraulic...

8 min
EN 12845

EN 12845 Diesel Pump Batteries, Chargers and Starters

EN 12845 diesel fire pump starting: A2:2026 Clause 10.9 leaves batteries, chargers and start attempts to EN 17451; what remains are the four alarm indications, Annex I transmission and the monthly battery check.

8 min
EN 12845

EN 12845 Weekly Diesel Pump Exercise Test

The EN 12845 weekly diesel pump routine: 20 minute run, automatic start and manual restart, fuel, oil and coolant checks, log book content and c...

9 min
EN 12845

EN 12845 Dry Pipe Installations

EN 12845 dry pipe sprinkler installations: air charging, water transit time (60/90 s), use in freezing areas, the 25% design area increase and comp...

8 min
EN 12845

EN 12845 Electric Sprinkler Pump Sets

EN 12845 electric pump sets: the dedicated supply, the 15 second rule, cabling and labelling rules, pump monitoring, and the protection provisions deleted in A2:2026.

10 min
EN 12845

EN 12845 HHP Design: HHP1, HHP2, HHP3, HHP4

EN 12845 HHP classes: paint, plastic injection, rubber and timber processing. 7.5/10.0/12.5 mm/min over 260 m2, K115 (K8.0) selection, the HHP4 deluge exc...

8 min
EN 12845

EN 12845 HHS (High Hazard Storage) Design

EN 12845 high hazard storage: ST1-ST6 configurations, Category I-IV commodities, design density by height band and the 260-300 m2 area of operation.

9 min
EN 12845

EN 12845 Minimum Pipe Diameters

BS EN 12845+A2:2026 Table 36 minimum pipe diameters (20 mm or 25 mm by risk class and pipe type); Tables 27-35 pre-calculated pipe sizes and the 65/80 mm sprinkler connection limits.

8 min
EN 12845

EN 12845 Minimum Sprinkler Discharge Pressure

EN 12845 minimum sprinkler discharge pressure: LH 0.7 bar, OH 0.35 bar, HHP/HHS 0.5 bar, absolute versus average minimum, in-rack 1.0 bar (K115) and 2.0 bar (K80).

8 min
EN 12845

EN 12845 Ordinary Hazard (OH1-OH4) Design

EN 12845 OH1 to OH4: the 5.0 mm/min density, 72-360 m2 areas of operation, the 25% dry system increase and the 0.35 bar OH minimum and the 0.56 bar a K80 (K5.6) sprinkler needs for 5.0 mm/min over 12 m².

8 min
EN 12845

EN 12845 Pipe Supports and Hanger Spacing

EN 12845 pipe support rules: 4 m for steel and 2 m for copper, the 50 percent exception, grooved joint rules, hanger load tables and the seismic gap.

9 min
EN 12845

EN 12845 Pump Suction Conditions and Pump Room Layout

EN 12845 suction and pump room rules: positive suction head, the NPSHa-NPSHr margin, the 60 min fire-resistant compartment, 4 C (electric) / 10 C (diesel) minimum room temperatures and fi...

8 min
EN 12845

EN 12845 Quarterly and Half-Yearly Routines

EN 12845 quarterly (13 week) and half-yearly maintenance: hazard review, sprinkler cleaning, coatings, water supply testing, dry valve exercising a...

8 min
EN 12845

EN 12845 Reduced Capacity Tanks

EN 12845 reduced capacity sprinkler tanks: guaranteed town main infill, automatic filling, minimum effective volumes and the field errors that follow.

8 min
EN 12845

EN 12845 Suction Pipe Design and Details

EN 12845 suction pipework: diameter and velocity limits, suction lift, foot valves, priming, gradient and the NPSH margin at the pump inlet.

8 min
EN 12845

EN 12845 Town Main as a Water Supply: Clauses 9.2 and 4.4.4.3

EN 12845 conditions for using the town main as a sprinkler water supply: the three-point pressure-flow test at maximum demand, water authority approval, boosted mains, other services taken from the main and the connection arrangement.

8 min
EN 12845

EN 12845 Water Spray Subsidiary Extensions

EN 12845 subsidiary water spray extensions on a sprinkler system: deluge valves, the 80 mm connection limit, the additional water demand, why the standard gives no density, and the Annex F.7 theatre drencher.

8 min
EN 12845

EN 12845 Water Supply Test Arrangements and Test Sequence

EN 12845 water supply testing: the three-point pressure-flow curve plus static pressure, flow meter accuracy and capacity (±5 %, 140 %), the ±1.6 % test gauge and the annual test routine from field practice.

8 min
EN 12845

EN 12845 Weekly User Routine

The EN 12845 weekly routine: pressure and level checks, water motor alarm test, automatic pump start test, diesel restart, trace heating and logboo...

8 min
EN 12845

EN 12845-1 Annex O: P&ID Example

EN 12845-1 Annex O: the informative single-figure P&ID example, where the standard requires a P&ID, instrument details on layout drawings and the topics the annex does not cover.

8 min