A logistics building is never just racking. There are offices, packing lines, shipping docks, break rooms and workshops — and each needs its own sprinkler design. Transition zones, zone separation and hydraulic balance are the most critical part of designing fire protection for a mixed-occupancy building.
One e-commerce warehouse was initially designed as a single zone: 8000 m² of ESFR and 1500 m² of offices on the same control valve set and the same flow switch. The pump pressure needed for ESFR was 8 bar; running office sprinklers above 8 bar produces a spray so aggressive that it damages furnishings. The insurer required separate zones and every control valve set had to be replaced. A mixed-occupancy building should always be zoned from the start — a single zone is not a saving, it is deferred expense.
Typical areas in a mixed building
- Main storage: HHS3–HHS12 depending on storage height
- Shipping dock: HHP3 or HHS1
- Packing: OH3
- Forklift charging: OH3 plus specific lithium-ion measures
- Open-plan office: OH1
- Meeting rooms, lobby, corridors: OH1
- Kitchen and canteen: OH3
- Server room: clean agent or OH3
- Workshop and maintenance: HHP1–2
- Changing rooms and showers: OH1
Zoning principles
- Each main function gets its own zone
- Each zone gets its own control valve set
- Each zone gets its own flow switch and alarm
- Hydraulic balance: the zone with the highest pressure demand sets the pump pressure
- A fire wall (REI 90–120 min) between zones is preferred
Designing the transition zone
Where there is no fire wall, use a 3–6 m buffer at the change of occupancy:
- The last ESFR row provides full protection
- Both systems overlap across the 3–6 m transition
- The OH system starts 6 m beyond
- Fire damper (FD-90) in the ceiling
- The zone transition is supervised by a line of smoke detectors
Pump pressure conditions
| Zone | Sprinkler pressure | Pump duty |
|---|---|---|
| ESFR HHS6 | 4 bar | 8 bar (friction plus static) |
| CMSA ceiling | 3 bar | 6 bar |
| OH3 | 1.5 bar | 3–4 bar |
| OH1 | 0.7 bar | 2–3 bar |
The zone with the highest pressure demand — usually ESFR — sets the pump duty, and pressure-reducing valves are fitted to the ordinary hazard zones.
Field error — the forklift charging area was overlooked
In one logistics warehouse the forklift charging area, with twelve lithium-ion trucks, had been rolled into the OH1 office classification. A thermal runaway event overwhelmed OH1 and flame and smoke spread rapidly. After the incident the charging area was rebuilt as a separate zone with OH3 density, early lithium-ion detection (CO and H₂ sensors) and a clean-agent backup system. A lithium-ion charging area always warrants its own design.
Shipping dock area
- Temporary pallet staging: HHS1 is sufficient (≤ 4 m)
- Heavy forklift traffic: OH3
- Cardboard waste accumulation: specific housekeeping rules apply
- External dock doors: dry-type sprinklers with freeze protection
- With the doors open, air movement disrupts ESFR operation
Office area
- Open plan: OH1 concealed pendent
- Server room: clean agent (HFC-227ea or inert gas) or pre-action
- Meeting rooms: OH1, deflector under a 3 m ceiling
- Break and rest areas: OH1
- Kitchen: OH3 plus a UL 300 listed cooking-hood suppression system
Turkish regulation and local practice
BYKHY classifies buildings by occupancy (storage, office, commercial and so on). In mixed-occupancy projects each area is referred to EN 12845 or NFPA 13 according to its own classification. Newer Turkish distribution centres model every zone in BIM at design stage; in older buildings, zoning is retrofitted after the fact and is far harder to achieve.
Quick check list
- Occupancy classification documented for every area.
- Each main function has its own zone and valve set.
- Fire wall or transition zone designed.
- Pump pressure set by the most demanding zone.
- Pressure-reducing valves on the ordinary hazard zones.
- Lithium-ion forklift charging is a separate zone with dedicated detection.
- Server room on clean agent or pre-action.
- Kitchen protected by a UL 300 system.
Frequently Asked Questions
Why must storage and office areas be on separate zones?
Because their pressure demands are incompatible. ESFR may need 8 bar at the pump while office sprinklers operate at under 1 bar; running office heads at ESFR pressure produces a spray aggressive enough to damage the space it is protecting.
How wide should a transition zone be where there is no fire wall?
Typically 3–6 m, with both systems overlapping across the buffer, a fire damper in the ceiling, and a line of smoke detectors supervising the change of occupancy.
How should a forklift charging area be protected?
As its own zone at OH3 density, with early lithium-ion detection (CO and hydrogen sensors) and, where the risk justifies it, a clean-agent backup. Rolling it into an office classification is a well-documented failure mode.
What protects a server room inside a logistics building?
Either a clean agent system (HFC-227ea or inert gas) or a pre-action sprinkler system — usually double interlock, so that a single false signal cannot fill the pipework.

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 86+ Engineering Calculators
MEP Calc bundles 86+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreBS EN 12845:2015+A1:2019 Fixed firefighting systems — Automatic sprinkler systems. EN 12845-2:2024 (CMSA & ESFR sprinkler systems). NFPA 13 Standard for the Installation of Sprinkler Systems. Turkish Regulation on Fire Protection of Buildings (BYKHY). FM Global Property Loss Prevention Data Sheet 2-0.