Foam Extinguishing in BYKHY: Articles 98 and 122
The Turkish Fire Protection Regulation gives no foam numbers: what Articles 98 and 122 require, the Guide's notes, new 98(7) and choosing NFPA 11 or EN 13565-2.
Ignitable liquid classes, storage, tank protection and foam systems: NFPA 11, NFPA 30, EN 13565 and Turkish regulation clauses in plain language.
The Turkish Fire Protection Regulation gives no foam numbers: what Articles 98 and 122 require, the Guide's notes, new 98(7) and choosing NFPA 11 or EN 13565-2.
BYKHY Article 121: underground tanks only, 45,000 litres per tank and 250,000 per station, dispenser rules, extinguishers and Annex 13 distances in the Guide.
BYKHY Article 120: underground tank cover (60 cm soil, 10 cm concrete), traffic slab, Annex 12/Ç distances, 4 m vent, tank fittings and filling points.
BYKHY Article 119: aboveground tank safety distances (Annex 12/C), bund volume and wall rules, protection zone and Annex 12/D for portable containers in Turkey.
BYKHY Article 118: 120-minute liquid warehouses, basement ban, 5 stacks 3 m apart, 12,500 litres IA equivalent, Annex 12/A and Annex 12/B for factory stores.
BYKHY Articles 116 and 117: Zone 0, 1 and 2 definitions, equipment limits and zone sizes at stores, tanks, filling points and fuel stations in Turkey.
Turkish Fire Protection Regulation: Annex 11 notification and permit thresholds, Article 114 filling rule, Article 115 maximum quantities in rooms and shops.
Classes IA to IIIB under Article 113 of the Turkish Fire Protection Regulation: flash and boiling point limits, the heated-liquid rule and exemptions.
NFPA 11-2024 Chapters 12 and 13: flushing, hydrostatic and discharge tests, the −0/+30 % proportioning tolerance, signs, and ITM handed to NFPA 25.
NFPA 11-2024 7.12: high-expansion foam depth and submergence volume, Table 7.12.7.1 times, the leakage and sprinkler discharge formula, worked example.
NFPA 11-2024 Chapter 4: foam concentrate quantity, 24-hour reserve, storage tanks, compatibility, proportioner types and concentrate pump rules.
NFPA 11-2024 5.9 and 5.2.4: number and duration of supplementary foam hose streams, monitors and handlines as primary tank protection, the 1.5 factor.
NFPA 11-2024 foam for diked areas, nondiked spills and loading racks: 4.1 and 6.5 mm/min, 15/20/30 min times, low-level outlet spacing and examples.
NFPA 11-2024 floating roof seal protection: top-of-seal 12.2 mm/min for 20 min, below-seal 20.4 mm/min for 10 min, foam dam, spacing and internal roofs.
NFPA 11-2024 subsurface and semi-subsurface foam injection: where it is allowed, outlet table, 3/6 m/s velocity limits, 4.1 mm/min and discharge times.
NFPA 11-2024 fixed foam outlets on cone-roof tanks: 4.1 mm/min rate, 30/55 min times, outlet count by diameter, the 70 % rule and a worked example.
Earlier posts on foam and ignitable liquids that stay in their own categories: