This article has been rewritten from the text of FM Global DS 8-9 "Storage of Class 1, 2, 3, 4 and Plastic Commodities" (March 2010, Interim Revision April 2026, 103 pages). The previous version's "storage height versus design selection" table, "Section 2.4 ESFR design", "K115-K240 CMSA" and "2 % slope" statements are not in the data sheet and have been removed. Every value below carries its section, table or figure number.
1. Scope and design flow (Sections 1.0, 1.3)
DS 8-9 covers Class 1, 2, 3, 4 and plastic commodities in rack, solid-piled, palletized, shelf and bin-box arrangements. Thresholds: 10 ft (3.0 m) for Class 1-3, 6 ft (1.8 m) for Class 4 and plastics; below these the storage is "low-piled" and goes to DS 3-26. Rubber tires, baled fiber, hanging garments, roll paper, baled waste paper, rolled nonwoven fabrics and carpets (8-series), flammable gases, liquids and solids (7-series), carousels (DS 8-33) and ASRS (DS 8-34) go to their own data sheets. Installation rules are in DS 2-0. The data sheet is intended for new systems and for modifying existing ones; evaluation of existing systems is handled through the FM Global service office.
The most practical advice in Section 1.0: consider future changes in storage arrangement, water supply and commodity before choosing an option, and where ceiling-only options exist, protect to the highest commodity hazard the ceiling height and water supply will allow. Section 1.3 provides two flowcharts: Figure 1 for solid-piled/palletized/shelf/bin-box and Figure 2 for rack storage. Both walk through Section 2.2.2 (commodity), 2.2.3 (flue spaces), 2.3.1-2.3.3 (system and ceiling sprinklers), Table 1 (sprinklers per branch line), Table 14 (hose and duration) and 2.3.6 (special options).
2. Eight commodity classes (Section 2.2.2)
The commodity class is determined per DS 8-1 (2.2.2.1). Protection is based on the most severe hazard present anywhere in the storage area (2.2.2.2). The ranking: Class 1 → Class 2 → Class 3 → Class 4 → cartoned unexpanded plastic → cartoned expanded plastic → uncartoned unexpanded plastic → uncartoned expanded plastic. Where the most severe hazard exists in relatively small amounts and protecting it creates a challenge, Fire Protection Scheme 8-9A in Section 2.3.4.9 (dedicated rack, horizontal barriers and quick-response in-rack sprinklers) can be used (2.2.2.3). The combustibility of pallets is included in the commodity class; noncombustible or metal pallets are preferred; idle pallet storage is protected per DS 8-24 (2.2.5). See the plastic storage article for the plastic classes.
3. Storage arrangements and flue spaces (Section 2.2.3)
- Solid-piled and palletized: vertically aligned flue spaces are maintained through the full height of storage; there are no minimum flue guidelines (2.2.3.1.1).
- Shelf storage: shelf depth not exceeding 750 mm; or depth up to 1.5 m with tier height up to 0.6 m; or depth up to 1.5 m with a 0.7 mm sheet-metal or 10 mm plywood vertical barrier down the centre parallel to the aisle ("back-to-back shelving") (2.2.3.1.2).
- Bin-box: solid shelf depth up to 3.0 m, tier height up to 1.5 m and vertical barriers perpendicular to the aisle not more than 1.2 m apart (2.2.3.1.3).
- Rack types: single-row when the depth is ≤ 1.8 m and aisles ≥ 1.2 m; double-row when the depth is 1.8-3.7 m with aisles ≥ 1.2 m; otherwise multiple-row (2.2.3.2.1.1-3).
- Open-frame: grated or slatted shelves at least 70 % open with adequate flues; solid shelves ≤ 20 ft² (1.9 m²) still count as open-frame (2.2.3.2.1.4-6). Racks not meeting the guidelines are treated as having solid shelves, whose size is defined by the surrounding flues (net 150 mm transverse, 75 mm at uprights; net 75 mm longitudinal in double-row; net 150 mm longitudinal in multiple-row racks) (2.2.3.2.1.9).
- Flue spaces: single-row racks, net 75 mm transverse flues every 1.4 m or 150 mm every 2.7 m; double-row racks, 75 mm longitudinal + 75 mm transverse every 1.4 m, or 75 mm longitudinal + 150 mm transverse every 2.7 m, and 150 mm transverse every 1.5 m where the longitudinal flue is under 75 mm; multiple-row racks, 150 mm longitudinal and 150 mm transverse flues every 1.5 m, or depth ≤ 6.1 m with aisles ≥ 2.4 m and 150 mm transverse flues every 1.5 m (2.2.3.2.2-2.2.3.2.4).
- Portable racks: treated as open-frame when the bottom is at least 70 % open; otherwise as solid-bottomed with area and height limits (2.2.3.3).
- Open-top containers: noncombustible containers are treated as closed-top when everything below them is noncombustible or they are on the bottom tier; combustible ones only when all are on the bottom tier; otherwise in-rack sprinklers per 2.2.4.3 (2.2.4).
4. Clearance, structure and venting (Sections 2.1, 2.2.6)
Maintain at least 3 ft (0.9 m) between the top of storage and the deflectors of standard-coverage ceiling sprinklers and at least 5 ft (1.5 m) for extended-coverage sprinklers (2.2.6). Adhering to the design guidelines eliminates the need for column and overhead steel protection (2.1.2). Racks are anchored against toppling, considering rack loads, absorbed fire water, water-filled in-rack piping and earthquakes (DS 1-2) (2.1.1.3). Heat and smoke venting and draft curtains are referred to DS 2-0; DS 8-9 gives no figures (2.1.3).
5. Storage sprinkler attributes (Section 2.3.3.2)
Only FM Approved sprinklers listed under "Storage Sprinklers (Ceiling-Level)" are used at ceiling level; the K-factor range is 11.2 (160) to 33.6 (480). K8.0 (K115) and smaller, on-off, ECLH and ECOH sprinklers are not approved as ceiling-level Storage sprinklers (2.3.3.2.1). Systems treated as wet use 70 °C, or 100 °C above a 38 °C ambient; dry and refrigerated-area systems use 140 °C (2.3.3.2.2-3). Quick-response elements and pendent orientation only in wet/antifreeze systems; standard-response and upright in any system type (2.3.3.2.4-7). The same K, orientation, RTI and temperature are used throughout an area (2.3.3.6). Designs are read by five attributes: K-factor, orientation, response, temperature, spacing (2.3.3.7.1).
6. Table map and reading rules (Section 2.3.3.7)
| Commodity | Solid-piled, palletized, shelf, bin-box | Open-frame racks, aisles ≥ 1.2 m |
|---|---|---|
| Class 1, 2, 3 | Table 2 | Table 7 |
| Class 4 and cartoned unexpanded plastics | Table 3 | Table 8 |
| Cartoned expanded plastics | Table 4 | Table 9 |
| Uncartoned unexpanded plastics | Table 5 | Table 10 |
| Uncartoned expanded plastics | Table 6 | Table 11 |
| Class 1-2 / Class 3, dry-pipe, ceilings over 9.0 m | Table 14a / 14b (Section 2.3.6.1) | |
| Class 1-4 and cartoned unexpanded plastics, ceilings over 12.2 m | Table 17b (Section 2.3.6.9) | |
Rules: every cell gives "number of sprinklers @ minimum pressure" and no interpolation is allowed (2.3.3.7.2); the design may be based on any row equal to or higher than the maximum ceiling height, and a higher row may be used when hydraulically better (2.3.3.7.2.2); green-highlighted options require 950 L/min hose and 60 min duration and are preferred; the minimum design area is 71 m² for 12 standard-coverage or 6 EC sprinklers, 60 m² for 10 and 54 m² for 9 sprinklers (2.3.3.7.2.3); pendent sprinklers may use the upright values with the same attributes (2.3.3.7.2.5); the hydraulic design is extended one branch line or sprinkler beyond the storage edge (2.3.3.5). Example: Table 7, 9.0 m ceiling, quick-response pendent K25.2 (K360) → 9 @ 20 psi (1.4 bar); K14.0 (K200) → 12 @ 50 psi (3.5 bar). The tables are detailed in the Storage sprinkler decision matrix.
Table 1, sprinklers per branch line and slope: for standard-coverage sprinklers and 9 or fewer sprinklers in the design, a ceiling slope up to 2 in 12 (10°) gives 3 sprinklers per branch line and up to 4 in 12 (18.5°) Equation 1; for 10-12 sprinklers, 1 in 12 gives 4 where the spacing is under 2.7 m otherwise 3, 2 in 12 gives 4 under 3.0 m otherwise 3, 4 in 12 gives 4; for 13 or more, Equation 1 up to 1 in 12 and, up to 4 in 12, Equation 1 (unobstructed) or 2 (obstructed). Non-integer results are rounded normally (2.3.3.7.2.6).
Ceiling higher than the table (2.3.3.7.3): for racks, a noncombustible false ceiling (at least 4.5 m beyond the storage, 2.3.3.7.3.1.1; designed per DS 1-12) or in-rack sprinklers; where the clearance to the ceiling exceeds 6.0 m, in-rack sprinklers at the top tier with 1.5 m of storage on it. For solid-piled storage, a false ceiling or conversion to racks.
7. In-rack sprinkler decision and design (Section 2.3.4)
Figure 3: are the racks open-frame, is there a ceiling-only option and can the water supply meet it, are open-top containers present, are there solid shelves over 6.0 m², does storage exceed 3.0 / 4.5 m, is the ceiling over 9.0 m? Negative branches lead to in-rack sprinklers. In-rack sprinklers are 70 °C, quick-response, minimum K8.0 (K115) above 115 L/min (2.3.4.3); face sprinklers within 450 mm of the rack face, deflectors at least 150 mm above the top of storage (2.3.4.5); horizontal arrangement IRAS(EO) or IRAS(E) (2.3.4.6); vertical increments per Figure 15 of 7.5 / 6.0 / 4.5 / 3.0 m; hydraulic design per Table 12 (Class 1-3: 6 or 10 sprinklers @ 85 L/min; Class 4 and plastics: 8 or 14 @ 115 L/min), ceiling design per Table 13. Details in the in-rack sprinkler article.
8. Hose demand, duration and system type (Sections 2.3.2, 2.3.5)
| Spacing | Sprinklers in design | Hose demand | Duration |
|---|---|---|---|
| Standard coverage | ≤ 12 | 250 gpm (950 L/min) | 60 min |
| 13-19 | 500 gpm (1,900 L/min) | 90 min | |
| ≥ 20 | 500 gpm (1,900 L/min) | 120 min | |
| Extended coverage | ≤ 6 | 250 gpm (950 L/min) | 60 min |
| 7-9 | 500 gpm (1,900 L/min)a | 90 mina | |
| ≥ 10 | 500 gpm (1,900 L/min) | 120 min |
a 950 L/min and 60 min when the maximum linear spacing is 3.7 m. At least 380 L/min is allowed for inside hose; 40 mm small hose lines not exceeding 30 m reach all storage areas and may be fed from a separate piping system, valved connections on the riser, adjacent systems or the ceiling sprinklers where in-rack sprinklers are separately controlled (2.3.5.2). System types may be wet, dry, antifreeze, preaction, deluge or refrigerated area; grid piping only for wet and antifreeze (2.3.2). Dry and similar systems have a maximum water delivery time of 40 s (most remote 4 sprinklers for unobstructed, 2 for obstructed ceilings; 60 s for single-sprinkler cut-off areas) (2.3.2.5). Single-interlock preaction systems are treated as wet or dry depending on detector spacing; other preaction types as dry (2.3.2.4). For Class 1-3 storage under ceilings over 9.0 m, Tables 14a/14b allow ceiling-only dry-pipe protection up to 16.5 m; the system size is limited to about 1,110 m² to meet the delivery time and plans are submitted to the FM Global service office for analysis (2.3.6.1).
9. Loss history: Table 18 (Section 3.2)
According to the data sheet, fires in storage occupancies have been controlled by the existing sprinkler arrangement whenever there were no major deficiencies; every uncontrolled loss involved inadequate water supplies, closed or partially closed valves, obstructed piping, missing sprinklers or flammable liquid/aerosol deficiencies. The study of rack storage losses gives two findings: in-rack sprinklers used with ceiling sprinklers are "overwhelmingly successful", and both damage and the number of operating sprinklers increase with storage and building height.
| Sprinklers operating during the fire | Percentage of fires controlled |
|---|---|
| 1 | 14 % |
| 2 or fewer | 32 % |
| 3 or fewer | 41 % |
| 4 or fewer | 49 % |
| 5 or fewer | 54 % |
| 10 or fewer | 77 % |
| 25 or fewer | 98 % |
Field note: the two flowcharts of DS 8-9 impose an order: commodity and arrangement first, then the table, then the water supply. On site the order is usually reversed: the sprinkler is chosen to suit the pump and tank at hand. Section 1.0 exists precisely for that: "protect to the highest commodity hazard the ceiling height and the available water supply will allow"; when today's Class 3 warehouse turns to cartoned plastics tomorrow, the table changes and the installation does not.
Quick checklist
- Scope: Class 1-3 above 3.0 m or Class 4/plastics above 1.8 m; special commodities and arrangements sent to their own data sheets
- Commodity class per DS 8-1; the most severe hazard in the area governs; pallet combustibility included
- Storage arrangement and rack type determined; open-frame conditions and flue spaces measured
- Clearance below the deflector 0.9 / 1.5 m; rack anchoring; venting per DS 2-0
- The sprinkler's five attributes chosen; compatibility with the system type (pendent and quick-response only wet) verified
- Applicable table and row selected; no interpolation; minimum design area and Table 1 branch-line count satisfied
- Ceiling higher than the table: false ceiling or in-rack route chosen
- In-rack decision by Figure 3; Figure 15, Table 12 and Table 13 applied where needed
- Hose demand and duration per Table 14; 40 s delivery on dry systems
- Highest hazard the ceiling and water supply allow targeted for future commodity and height changes
Frequently Asked Questions
From what storage height does FM DS 8-9 apply?
Section 1.0: when Class 1, 2 or 3 commodities are stored higher than 3.0 m or Class 4 or plastic commodities higher than 1.8 m; up to those heights the storage is low-piled and is protected per DS 3-26. Rubber tires, baled fiber, hanging garments, roll paper, carpets and similar commodities, and carousel (DS 8-33) or ASRS (DS 8-34) arrangements, go to their own data sheets.
Which tables give the sprinkler design in DS 8-9?
Tables 2 to 6 cover solid-piled, palletized, shelf and bin-box arrangements and Tables 7 to 11 open-frame racks, split by commodity into five groups. Tables 14a/14b give dry-pipe systems above 9.0 m and Table 17b ceilings over 12.2 m. Every cell reads "number of sprinklers @ minimum pressure" and no interpolation is allowed.
When does a rack count as open-frame?
Section 2.2.3.2: no solid shelves, or solid shelves not exceeding 1.9 m², grated or slatted shelves at least 70 % open, and adequate flue spaces. Single-row racks need 75 mm transverse flues every 1.4 m or 150 mm every 2.7 m; double-row racks additionally 75 mm longitudinal flues; multiple-row racks 150 mm longitudinal and transverse flues every 1.5 m. Otherwise the rack is treated as having solid shelves and Figure 3 decides.
What are the hose demand and water supply duration?
Table 14: standard coverage, up to 12 sprinklers 950 L/min and 60 min; 13 to 19 sprinklers 1,900 L/min and 90 min; 20 or more 1,900 L/min and 120 min. Extended coverage, up to 6 sprinklers 950 / 60, 7 to 9 1,900 / 90, 10 or more 1,900 / 120. At least 380 L/min for inside hose; 40 mm small hose lines not exceeding 30 m must reach all areas.
What are the water delivery time and sprinkler type for dry systems?
Section 2.3.2.5: maximum water delivery time 40 seconds; most remote 4 sprinklers for unobstructed and 2 for obstructed ceilings; 60 seconds for single-sprinkler cut-off areas. Dry systems use 140 °C standard-response upright sprinklers; pendent and quick-response sprinklers only in wet and antifreeze systems. For Class 1-3 storage under ceilings over 9.0 m, Tables 14a/14b allow ceiling-only protection up to 16.5 m with the system size limited to about 1,110 m².
References
- FM Global Property Loss Prevention Data Sheet 8-9, Storage of Class 1, 2, 3, 4 and Plastic Commodities, March 2010, Interim Revision April 2026: Sections 1.0-1.3 and Figures 1-2 (p.5-8), 2.1 (p.9), 2.2.2-2.2.6 (p.10-26), 2.3.1-2.3.2 (p.26-27), 2.3.3 and Tables 1-11 (p.27-40), 2.3.4 and Figures 3, 15, Tables 12-13 (p.41-58), 2.3.5 and Table 14 (p.62-63), 2.3.6.1 and Tables 14a/14b (p.63-65), 2.3.6.9 and Table 17b (p.79-80), 3.2 and Table 18 (p.80), Appendix A-B (p.83-103)
- FM Global data sheets: fmglobal.com; related sheets DS 2-0, DS 3-0, DS 3-26, DS 8-1, DS 8-24, DS 8-33, DS 8-34, DS 1-12, DS 1-2

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreValues are transcribed from the FM Global data sheet above with section, table and figure numbers. This article is for general information; the design must be based on the FM Approval listing of the selected product and the current data sheet text, carried out by a qualified engineer and accepted by the insurer.