Ports host tank farms storing gasoline, diesel and jet fuel. A single tank can reach 50,000-100,000 m3; the 2005 Buncefield blast caused damage across an area about 1 km in diameter. NFPA 30 covers flammable and combustible liquids and dike dimensions, while API 650 covers tank design.
NFPA 30 Classification
- Class IA: Flash <23 °C, BP <38 °C
- Class IB: Flash <23 °C, BP >=38 °C (gasoline)
- Class IC: Flash 23-38 °C
- Class II: Flash 38-60 °C (diesel)
- Class IIIA: Flash 60-93 °C (fuel oil)
Tank Setback Distances
- Class I tank: shell-to-shell spacing is a fraction of the sum of adjacent tank diameters (NFPA 30 Table 22.4.2.1); at least 0.9 m for tanks up to 45 m diameter
- Dike: at least the largest amount of liquid that can spill from the largest tank (NFPA 30 22.11.2.2)
- Dike wall: if the average interior height exceeds 1.8 m, access and egress provisions are required (NFPA 30 22.11.2.5)
- Tank-dike: tank shell to the toe of the interior dike wall at least 1.5 m (NFPA 30 22.11.2.5)
- Property line: per NFPA 30 Table 22.4.1.1(a) by tank type, diameter and protection; dike outer base at least 3 m (22.11.2.3)
Foam and Cooling Rates (NFPA 11-2024, hydrocarbons)
- Floating-roof rim seal foam: 12.2 L/min/m2 (top-of-seal with foam dam, Section 5.3)
- Full surface: 4.1 L/min/m2 with fixed foam discharge outlets (Table 5.2.5.2.2); 6.5 L/min/m2 with monitors and handlines (Table 5.2.4.2.2)
- Dike foam: 4.1 L/min/m2 with low-level fixed outlets, 6.5 L/min/m2 with foam monitors (Table 5.7.3.2)
Lightning and Overfill
- API 2003: Lightning grounding
- Bypass ring: Upper rim bonded
- Overfill protection: procedures or equipment to prevent overfilling; facilities receiving Class I liquid from marine vessels or mainline pipelines need written procedures using one of the listed methods (NFPA 30 21.7.1)
- Tank gauging: Radar + servo
- Cathodic protection: Bottom CP
Major Incidents
- Buncefield UK 2005: Overfill - 43 injured
- A terminal: Lightning
- A large refinery: about 12 Mt/y capacity
- A port: Tank fire
- CSB investigation: Large incident analysis

MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations (sprinkler, fire pump, clean agent) plus heating, cooling, HVAC, plumbing, steam and natural gas. Download it on the App Store.
Download MEP Calc on the App Store
SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report. One of the few tools that unifies all three major fire protection standards.
Download SprinkCalc on the App StoreNFPA 30, NFPA 11, API 650, API 2003, FM DS 7-88. NFPA 30 Flammable and Combustible Liquids.