Short answer: Under Article 4(1)(ff), an existing building is a structure, building, facility or establishment whose building permit was obtained before the Regulation came into force and which is under construction or completed. The Regulation was published in the Official Gazette of 19/12/2007 and, under Article 170, came into force on publication, so the cut-off is 19.12.2007. According to the 2024 Guide, buildings whose permit application drawings were approved by the authority before that date also count as existing (Guide, Article 138(4)).

Which part of the fire regulation applies to a building is a decision to be made before any system calculation. The Turkish Regulation on Fire Protection of Buildings (BYKHY) sets aside a separate part for existing buildings: Part Ten (Articles 138-167). This part gives escape, sprinkler, hose cabinet and fire brigade connection thresholds that differ from those for new buildings and are often more lenient; but not every old building can use it.

This article relies on two documents only: the BYKHY text including the 9/7/2015 amendment (72 pages) and the BYKHY Guide of December 2024 by the Ministry of Environment, Urbanisation and Climate Change (268 pages). The Guide describes itself as guidance, and where it conflicts with legislation the legislation in force prevails (Guide p.3). For sprinkler thresholds in new buildings see buildings requiring sprinklers in Turkey.

What Is an Existing Building: Article 4(ff)

Article 4(1)(ff) defines an existing building as "a structure, building, facility or establishment whose building permit was obtained before this Regulation came into force and which is under construction or completed". The Regulation was published in Official Gazette No. 26735 of 19/12/2007 and, under Article 170, comes into force on its date of publication. The cut-off date is therefore 19.12.2007; what decides is not the age of the building but the date of its building permit.

The Guide expands the definition on two points:

Article 138(2) gives the consequence for this second group: in existing buildings where fire measures compliant with the regulation brought into force by Council of Ministers Decision 2002/4390 of 12/6/2002 have been taken, the rule is that no additional measures are required under this Regulation; the owner may take additional measures if desired.

Which Existing Buildings Are Treated as New

Article 138(1) draws the scope of Part Ten with a list of exceptions. Buildings whose use is changed after the Regulation came into force so that they will be used for the following cannot rely on Part Ten:

Article 139 gives the counterpart: these buildings follow the provisions of the other parts of the Regulation, that is the new-building rules. The Guide makes this concrete with an example and takes it one step further: a building used as a hospital since 2000 is assessed as an existing building as long as there is no major alteration; in the case of a major alteration (being subject to an alteration permit) or a change of use such as converting the hospital into a hotel, it is assessed as a new building (Guide, commentary on Article 138, p.217).

Article 138(3) (2015 text) says that Part Ten also applies to other existing buildings whose use was changed after the Regulation came into force; the cross-reference in the text reads "buildings other than those listed in subparagraph (b) of the second paragraph of Article 2". Because Article 2(2) is not divided into subparagraphs in the 2015 text, where there is doubt about the scope of this reference, the opinion of the authority competent to issue building permits governs under Article 144.

Situation Provisions that apply Basis
Building permit on or after 19.12.2007 New-building provisions Articles 4(ff), 170
Permit (or approved permit drawings) before 19.12.2007, use unchanged Part Ten (Articles 138-167) Articles 4(ff), 138(1); Guide 138(4)
Permit between 26.07.2002 and 19.12.2007 with measures compliant with the 2002 regulation As a rule no additional measures; the owner may add them Article 138(2); Guide Figure 4.1.ff
Existing building later converted to a use on the 138(1) list New-building provisions Article 139
Major alteration in an existing building (alteration permit) Assessed as a new building Guide, commentary on Article 138
Situation not covered or unclear Opinion of the authority competent to issue building permits Article 144

General Provisions of Part Ten: Articles 140-144

Article 145 also applies Article 23(4) on structural stability to existing buildings; that paragraph requires steel to be suitably insulated against heat in steel buildings other than single-storey buildings with an area below 5000 m2.

Escape Provisions: Articles 146-159

The largest section of Part Ten is escape routes. Article 146(1) sets the starting point: for escape routes in existing buildings other than hospitals, hotels, nursing homes, primary schools, nurseries and similar, Article 31 is the basis, and the concessions of this article are also accepted. The Guide adds that these premises are assessed as new buildings and that meeting Article 31 is the rule (Guide p.220).

Item New building Existing building
Total escape route width Number of users / persons per unit width x 0.5 m (Article 33(1)) Number of users x 0.4, in centimetres (Article 148(1)(a))
Minimum width of escape stairs and routes 80 cm; corridors and halls 110 cm; high-rise buildings 120 cm (Article 33(1)-(2)) Straight-flight stairs with landings 60 cm, spiral 70 cm; above 60 users on the floor, 70 and 80 cm; in hospitals, nursing homes, kindergartens and primary schools straight flights only, 100 cm (Article 148(1)(b))
At least 2 exits High-hazard areas above 25 people, every area above 50 people (Article 39(2)) High-hazard areas above 25 people, areas above 60 people (Article 150(1)(a))
At least 3 / 4 exits Above 500 / 1000 people (Article 39(2)) Above 600 / 1000 people (Article 150(1)(a))
Distance between exits in an undivided space 1/2 of the diagonal; 1/3 with sprinklers (Article 39(3)) 1/3 of the diagonal; 1/4 with sprinklers (Article 150(1)(b))

The Guide gives an example for 148(1)(a): for a 5000 m2 shop, the Annex 5/A occupant load factor is 5 m2 per person, so there are 1000 users, and the total exit width in an existing building is 1000 x 0.4 = 400 cm (Guide p.222).

Other escape concessions and conditions:

For escape rules in new buildings see escape routes and stairs in Turkey.

Sprinklers: Article 165(1)

Article 165(1) lists where sprinkler systems apply in existing buildings "with the other provisions of Article 96 reserved". Table 165.1 of the Guide places this list side by side with Article 96(2) for new buildings (Guide p.232):

Item New building (Article 96(2)) Existing building (Article 165(1))
a All buildings other than residential with a structure height above 30.50 m All buildings other than residential and office buildings with a building height above 30.50 m
b Residential buildings with a structure height above 51.50 m Office buildings with a structure height above 51.50 m
c Enclosed car parks with a combined area above 600 m2; more than 10 vehicles by lift Enclosed car parks with a total area above 1000 m2; more than 10 vehicles by lift
ç Hotels, dormitories, guest houses and hostels with more than 100 bedrooms or 200 beds in a multi-storey building; all residential facilities with a structure height above 21.50 m Hotels, guest houses and hostels with more than 200 beds in a building of more than two storeys
d Multi-storey shops, shopping, trade and entertainment venues with a total area above 2000 m2 Multi-storey shops, shopping and entertainment venues, congress and meeting halls with a total construction area above 3000 m2
e Buildings above 1000 m2 in total where readily flammable and combustible materials are produced or kept Unless stated otherwise, warehouses in multi-storey buildings holding readily flammable materials with an enclosed area above 2000 m2 in basements or 4000 m2 on other floors

Three differences matter most. First, 165(1)(a) measures building height while 96(2)(a) measures structure height; the two are defined separately in Article 4 and can give different results for the same building. Second, an existing office building reaches the sprinkler threshold at 51.50 m, not at 30.50 m. Third, 165(1)(ç) does not list dormitories; a building later converted into a children's home already falls under the new-building rules through Article 139.

The phrase "with the other provisions reserved" shows that the other paragraphs of Article 96 also apply in existing buildings: spaces where sprinklers may be omitted (96(3)), materials that react with water (96(4)) and design to TS EN 12845 (96(5)). To work through the new or existing building decision step by step, use the Turkey sprinkler requirement checker.

Other System Provisions: Articles 160-167

Item Rule in existing buildings Article
Hose cabinets High-rise buildings; manufacturing, workshop, storage, accommodation, healthcare, assembly and education buildings with a total enclosed area above 2000 m2; enclosed car parks above 1000 m2; boiler rooms above 500 kW (for new buildings 1000 m2, 600 m2 and 350 kW) 164(2); new: 94(1)(b)(1)
Fire brigade inlet connection Article 97 applies to high-rise buildings other than residential and office, and to buildings with a hose cabinet obligation and a floor area above 2000 m2 166
Detection and warning Article 75 for the warning system; its detection provisions also apply to existing accommodation, institutional, office, shop, bazaar and assembly buildings 161
Lifts Machine room resisting fire for at least 60 minutes and non-combustible; a smoke vent in the shaft of at least 0.1 m2 and 0.025 times the shaft area, or pressurisation; in non-residential buildings above 30.50 m and residential above 51.50 m, recall to the exit floor on fire alarm 160
Cables If the electrical installation is renewed, cables as specified in Article 83 162
Hazardous materials Relevant legislation; Part Eight for matters it does not regulate 167

For the new-building rules on hose cabinets and hydrants see hose reels and hydrants in Turkey.

Deadlines and Transitional Articles

Under Transitional Article 1 as reproduced in the Guide, the measures required for existing buildings in Part Ten are carried out within 1 year by the building owner and manager and by heads of institutions; if construction of the required installation has started within that period, the authority may allow a construction period not exceeding 1 year (Guide p.239). Transitional Article 1 in the 2015 text sets two rules for the 9/7/2015 amendment: buildings permitted, or put out to tender, before that date continue under the previous provisions; and in existing buildings with measures compliant with the Regulation, the rule is that no additional measures are required under the amended provisions.

The Guide also includes provision 138(5) for existing buildings in the use class of Article 7(12) and Transitional Article 3, which requires measures in these buildings to be taken by 31/12/2023 (Guide p.217-218, 240). These provisions are not in the 2015 text; the current text should be checked in the Official Gazette.

Decision Sequence

  1. Read the building permit date (or the approval date of the permit drawings) from the document: is it before 19.12.2007 (Article 4(ff), Guide 138(4))?
  2. If the permit falls between 26.07.2002 and 19.12.2007, check whether measures compliant with the 2002 regulation were taken (Article 138(2)).
  3. Has the use changed to one on the 138(1) list? If so, the new-building rules apply (Article 139).
  4. Is there a major alteration requiring an alteration permit? If so, assess as a new building (Guide).
  5. Otherwise apply Part Ten: escape 146-159, sprinklers 165(1), hose cabinets 164(2), fire brigade connection 166, detection 161.
  6. For matters not covered or unclear, obtain the competent authority's opinion in writing (Article 144).

Checklist

Frequently Asked Questions

What is an existing building under BYKHY?

Under Article 4(1)(ff), an existing building is a structure, building, facility or establishment whose building permit was obtained before the Regulation came into force and which is under construction or completed. The Regulation was published in the Official Gazette of 19/12/2007 and, under Article 170, came into force on publication, so the cut-off is 19.12.2007. According to the 2024 Guide, buildings whose permit application drawings were approved by the authority before that date also count as existing (Guide, Article 138(4)).

Which provisions apply if the use of an existing building changes?

Under Article 139, buildings whose use was changed after the Regulation came into force to one of the uses listed in Article 138(1) (healthcare and care, residential healthcare, kindergartens, nurseries, children's clubs, primary schools, children's homes, entertainment venues, accommodation, buildings holding hazardous materials) follow the provisions of the other parts of the Regulation, that is the new-building rules. The Guide adds that a building undergoing a major alteration (one subject to an alteration permit) is assessed as a new building.

When are sprinklers mandatory in an existing building?

Article 165(1), with the other provisions of Article 96 reserved, lists six cases: buildings other than residential and office buildings with a building height above 30.50 m; office buildings with a structure height above 51.50 m; enclosed car parks with a total area above 1000 m2, or where more than 10 vehicles are taken by lift; hotels, guest houses and hostels with more than 200 beds in a building of more than two storeys; multi-storey shops, shopping and entertainment venues, congress and meeting halls with a total construction area above 3000 m2; and multi-storey warehouses holding readily flammable materials with an enclosed area above 2000 m2 in basements or 4000 m2 on other floors.

Does a building built under the 2002 regulation need new measures?

Under Article 138(2), in existing buildings where fire measures compliant with the regulation brought into force by Council of Ministers Decision 2002/4390 of 12/6/2002 have been taken, the rule is that no additional measures are required under this Regulation; the owner may take additional measures if desired. According to the Guide's diagram, buildings permitted between 26.07.2002 and 19.12.2007 are existing buildings but are subject to the 2002 regulation.

References

  1. Regulation on Fire Protection of Buildings (Binaların Yangından Korunması Hakkında Yönetmelik), Official Gazette 19/12/2007-26735; amendments OG 09/09/2009-27344, OG 05/04/2012-28255, OG 09/07/2015-29411 (72-page consolidated text). Articles used: 2 (p.2), 4(1)(h), (ff) and (bbb) (p.2-4), 23(4) (p.10), 31 and 33 (p.13-14), 34 (p.14), 39 (p.15), 94 (p.33), 96 (p.34-35), 97 (p.35), 112(1)(j) (p.42), 138-144 (p.50), 145-158 (p.51-53), 159-165 (p.54-55), 166-167 (p.55), 170 and Transitional Article 1 (p.56).
  2. Ministry of Environment, Urbanisation and Climate Change of Türkiye, General Directorate of Professional Services, Binaların Yangından Korunması Hakkında Yönetmelik Kılavuzu (BYKHY Guide), December 2024. Pages used: p.3, Figure 4.1.ff (p.27), commentary on Articles 138-144 (p.217-219), Articles 146-150 and Table 150.1.a (p.220-224), Table 164.2 (p.231), Article 165 and Table 165.1 (p.232), Transitional Articles 1 and 3 (p.239-240).
  3. Sprinkler thresholds in new buildings: https://selvi.org/en/blog/bykhy/buildings-requiring-sprinklers-in-turkey
  4. Escape routes and stairs: https://selvi.org/en/blog/bykhy/escape-routes-and-stairs-turkey
  5. Hose reels and hydrants: https://selvi.org/en/blog/bykhy/hose-reels-and-hydrants-turkey
  6. Turkey sprinkler requirement checker: https://selvi.org/en/calculators/turkey-sprinkler-requirement-checker

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Sources & Disclaimer

Sources are listed in the References section at the end of the article. Quotations from the regulation and the guide are unofficial English translations of the Turkish text. This article is for general information; for article numbers, thresholds and exemptions, the current regulation published in the Official Gazette governs, and design must be carried out by an authorised engineer.