Source: BS EN 12845+A2:2026, Annex O (informative) "Example of P&ID", EN p.163.
This article is short because the source is one page long and consists of a single figure. The entire text of Annex O in the standard is its heading: "Annex O (informative) - Example of P&ID". The body of the annex is an example of a piping and instrumentation diagram.
In this annex the standard gives no binding symbol standard (apart from the symbol key of the example figure itself), no tagging convention, no separate example diagrams for ESFR or CMSA, no foam-water system example, no test point list, no rule for integration with peripheral systems and no revision schedule for the diagram.
Which standard does Annex O belong to?
To EN 12845-1, that is, to BS EN 12845+A2:2026 (EN p.163). The contents list of EN 12845-2:2024 has a single annex: "Annex A (normative) Extract for determining the hazard classification from prEN 12845-1" (EN 12845-2, EN p.2). Therefore there is no such thing as an "EN 12845-2 Annex O".
The status of the annex is informative. Compared with the annexes in the same region:
| Annex | Title | Status | Page |
|---|---|---|---|
| N | Control Mode Specific Application Sprinklers: CMSA | Normative | EN p.162 |
| O | Example of P&ID | Informative | EN p.163 |
| P | ESFR sprinkler protection | Normative | EN p.164 |
| Q | Periodic system inspection | Informative | EN p.165 |
Source: BS EN 12845+A2:2026, EN p.162-165.
Where does the standard require a P&ID?
Annex O does not create a requirement; the clause that creates the requirement is 4.4.2 i).
Clause 4.4.1 (EN p.24) lists the information to be provided at the design stage: a summary schedule (Clause 4.4.2), complete working drawings of the sprinkler installations (Clause 4.4.3) and details of the water supplies (Clause 4.4.4).
Clause 4.4.2 i) (EN p.24) asks for a list of the sprinkler-suitable components in the system, each named by supplier and model/reference number. It adds that, where the authorities require it, a Piping and Instrumentation Diagram (P&ID) should be included, listing every component of the system with its supplier's name, model, diameter, total number and reference number; the figure in Annex O is given as an example of such a diagram.
In other words, the standard does not impose a P&ID on every project; it makes it dependent on the authorities requiring it. When it is required, it lists the information fields the diagram must carry: supplier's name, model, diameter, total number, reference number.
The other items of the summary schedule
Clause 4.4.2 (EN p.24) lists the information to be given in the summary schedule as follows:
- a) project name;
- b) reference numbers of every drawing and document;
- c) issue numbers of every drawing and document;
- d) issue dates of every drawing and document;
- e) titles of every drawing and document;
- f) installation type(s), and the nominal diameter(s) of each control valve set;
- g) the number or reference of every control valve set in the system;
- h) how many sprinklers each control valve set serves;
- i) the component list and, where required, the P&ID;
- j) for each control valve set, the height of its highest sprinkler;
- k) a statement that the installation has been designed, and will be installed, to this European Standard, or else details of any departures from its requirements with the reasons for them.
Instrument details required on layout drawings
The layout drawings, which complement a P&ID, are governed by Clause 4.4.3.1 (EN p.24-25). The items concerning the instrument and valve side are as follows:
- i) where the control valve sets are and of what type, and where the water motor alarms are;
- j) position and details of any water flow switches and air or water pressure alarm switches;
- k) position and size of any subsidiary valves, subsidiary stop valves and drain valves;
- l) the drainage fall of the pipework;
- n) where every test valve is;
- o) position and details of any alarm panel;
- p) position and details of any fire department inlet connections;
- q) a key to the symbols used.
Source: Clause 4.4.3.1, EN p.24-25.
The presence of a symbol key on the drawing is a requirement (item q); however, the standard does not state which symbol set is to be used and makes no reference to a symbol standard.
Topics not covered in Annex O
- A reference to a binding symbol standard (apart from the LEGEND symbol key in the top right block of the example figure).
- A tagging convention (for example prefix schemes by equipment type).
- Separate P&ID examples for ESFR, CMSA or foam-water systems.
- Integration diagrams for the building management system and the fire alarm system.
- A schedule for the intervals at which the diagram is to be updated.
Field note
Field note: the place of the P&ID in the standard is not an obligation but a document dependent on the authorities requiring it. Where one is required, the diagram carries the five information fields listed in Clause 4.4.2 i): supplier name, model, diameter, total number and reference number.
Frequently Asked Questions
What does EN 12845 Annex O contain?
BS EN 12845+A2:2026 Annex O (EN p.163) is an informative annex and its title is 'Example of P&ID'. Its content is nothing but an example diagram; the figure itself carries a symbol key (LEGEND), but it contains no reference to a binding symbol standard, no tagging convention, no separate examples for ESFR or CMSA and no revision schedule.
Is Annex O an annex of EN 12845-1 or of EN 12845-2?
It is an annex of EN 12845-1, that is, of BS EN 12845+A2:2026 (EN p.163). The only annex of EN 12845-2:2024 is Annex A (EN 12845-2, EN p.2).
Is a P&ID mandatory on a project?
Clause 4.4.2 i) (EN p.24): the summary schedule shall include a list of the sprinkler-suitable components in the system, each named by supplier and model/reference number. Where the authorities require it, a Piping and Instrumentation Diagram (P&ID) should also be included, listing every component of the system with its supplier's name, model, diameter, total number and reference number; Annex O gives an example of such a diagram.
Which documents are required at the design stage?
Clause 4.4.1 (EN p.24): the information provided shall include a summary schedule (4.4.2), complete working drawings of the sprinkler installations (4.4.3) and details of the water supplies (4.4.4).
How are alarm and valve details shown on layout drawings?
Clause 4.4.3.1 (EN p.24-25) lists the information to be given on layout drawings; among these are the location and type of control valve sets and the location of water motor alarms, the location and details of any water flow and air or water pressure alarm switches, the location and size of any subsidiary valves, subsidiary stop valves and drain valves, the location of all test valves, the location and details of any alarm panel, and a key to the symbols used.
References
- BS EN 12845+A2:2026 Annex O (EN p.163)
- BS EN 12845+A2:2026 Annex N (EN p.162), Annex P (EN p.164), Annex Q (EN p.165)
- BS EN 12845+A2:2026 Clause 4.4.1 and 4.4.2 (EN p.24)
- BS EN 12845+A2:2026 Clause 4.4.3.1 (EN p.24-25)
- BS EN 12845-2:2025 Contents (EN p.2)

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreBS EN 12845+A2:2026 (EN 12845:2015+A2:2026) Fixed firefighting systems — Automatic sprinkler systems — Design, installation and maintenance; BS EN 12845-2:2025 (EN 12845-2:2024) ESFR and CMSA sprinkler systems. Every figure in this article is taken from the published standard text; clause, table and page references are listed under References. General information only, not a substitute for the standard or for a design review.