The February 6, 2023 Kahramanmaraş earthquakes reminded Turkey of its seismic reality once again. Buildings collapsed, but even in surviving structures sprinkler pipes broke, pumps toppled and mains cracked. Structures that resisted the quake itself were left without sprinkler protection against the post-earthquake fire. At this intersection, NFPA 13 and the Turkish Building Earthquake Code (TBDY 2018) define the rules that keep sprinklers operational after an earthquake. This article approaches seismic bracing with the seriousness it deserves.
What Is Seismic Bracing?
Seismic bracing is a mechanical addition that forces the sprinkler pipe to move with the building's structural frame during an earthquake. The core purpose: prevent independent motion of the pipe and rupture at joints. NFPA 13-2025 Chapter 18 defines the details; the standard's term is "sway brace."
Three Types of Brace
- Lateral brace: Resists side-to-side motion, perpendicular to the pipe axis.
- Longitudinal brace: Resists motion along the pipe axis.
- Four-way brace: Lateral and longitudinal combined. Required at the tops of risers; also preferred on major feed mains.
Which Pipes Need Bracing?
NFPA 13 applies different rules based on pipe function and diameter:
- Feed and cross mains: Lateral bracing regardless of size (18.5.5.1). Spacing per Tables 18.5.5.2(a)–(n) by pipe material and size, with an upper limit of 40 ft (12 m).
- Longitudinal bracing: On feed and cross mains at max 80 ft (24 m) on center (18.5.6.1).
- Branch lines: Lateral bracing for 2½ in (DN65) and larger (18.5.5.1). Smaller branch lines are not sway braced but restrained per Section 18.6, e.g. with wire restraint (18.6.2).
- Riser: Four-way brace at the top of risers longer than 36 in (900 mm), within 24 in (600 mm) below the top coupling (18.5.8.1); max 25 ft (7.6 m) between four-way braces along the riser (18.5.8.4).
Turkey's Earthquake Zones
The former Turkish earthquake zone map had 5 zones. According to the BYKHY Guide, the 2007 earthquake regulation was repealed by the Turkish Building Earthquake Code of 18.03.2018 (TBDY 2018), which has no earthquake zones; the BYKHY 96/6 condition for "first- and second-degree earthquake zones" now applies to buildings in earthquake design classes (DTS) 1, 1a, 2 and 2a. If you still use the old zones as a rough guide, a rough field mapping to the US Seismic Design Categories (A–F) is:
| Former TR Seismic Zone | Typical PGA | NFPA 13 SDC Equivalent | Bracing Required |
|---|---|---|---|
| Zone 1 | 0.4g+ | D-F | Full seismic bracing |
| Zone 2 | 0.3-0.4g | C-D | Full bracing |
| Zone 3 | 0.2-0.3g | B-C | Partial bracing |
| Zone 4 | 0.1-0.2g | A-B | Basic bracing |
| Zone 5 | <0.1g | A | Standard hangers only |
Flexible Couplings
NFPA 13 requires flexible couplings on 2½ in (65 mm) and larger piping so it can move with individual sections of the building (18.2.1): within 24 in (600 mm) of the top and bottom of risers, within 12 in (300 mm) above and 24 in (600 mm) below floors in multistory buildings, within 1 ft (300 mm) on both sides of concrete or masonry walls, and within 24 in (600 mm) of building expansion joints (18.2.4.1). Where piping of any size crosses building seismic separation joints, a seismic separation assembly is required (18.3.1). This lets two sections of the building sway in different directions without rupturing the pipe.
Most commonly forgotten locations in the field: (1) roof-to-wall junctions, (2) seismic joint crossings, (3) between building wings.
Pump and Water Tank Seismic Bracing
Not just pipes — equipment must also withstand earthquakes:
- Fire pump: Floor anchor bolts and pedestal design must account for seismic loads. Without this, the pump slides and the suction/discharge line breaks at the flange.
- Water tank: NFPA 22 (Water Tanks) provides separate seismic rules; the sloshing effect must be calculated.
- Electric motor and panels: Keeping the pump standing is meaningless if its power feed is cut during an earthquake.
Four Common Mistakes in Turkey
- Relying only on hangers: Hangers carry vertical load; for seismic load NFPA 13 requires lateral and longitudinal sway bracing on mains (18.5.5, 18.5.6) and at least restraint on small branch lines (18.6).
- Skipping seismic separation: Pipes crossing seismic joints without a seismic separation assembly will almost certainly break in a major earthquake.
- Bracing to secondary structure: Connecting braces to suspended ceilings or non-structural elements is meaningless. Braces must attach to the primary structural frame (concrete beams and columns, main steel).
- No brace load calculation: The brace itself must be sized per listed design loads.

MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations (sprinkler, fire pump, FM-200 clean agent) plus heating, cooling, HVAC, plumbing, steam and natural gas. Download it on the App Store.
Download MEP Calc on the App Store
SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report. One of the few tools that unifies all three major fire protection standards.
Download SprinkCalc on the App StoreConclusion
In a seismic country like Turkey, sprinkler system earthquake resistance is mandatory, not cosmetic. The 2023 earthquakes showed that in buildings that didn't collapse, if a fire started and the sprinklers failed, a second disaster began. NFPA 13 Chapter 18 and Turkey's TBDY 2018 must be considered together; the designer must treat seismic load with the same seriousness as structural load.
Core references: NFPA 13 - Installation of Sprinkler Systems (Chapter 18 Hanging, Bracing, and Restraint), NFPA 22 - Water Tanks for Private Fire Protection, Turkey TBDY 2018. Original NFPA post: NFPA Today - Seismic Protection.