Both standards say the same thing: the fire pump must not stop during a fire. But the numbers differ, from starting time to fuel volume, battery count and test regime. This table is the list that belongs on the desk of any engineer moving between the two.
The shared philosophy: continuity, not protection
The unchanging rule in both is this: there is no overload (thermal) protection in the pump controller. Only short circuit protection exists, and the fuse must carry the starting current for at least 20 seconds. The motor must keep turning even beyond its thermal limit. An overload relay fitted on site to "protect the pump" opens the circuit in a real fire and collapses the system.
Side by side
| Topic | NFPA 20 | EN 12845 |
|---|---|---|
| Overload protection | None (HRC short circuit fuse) | None (HRC short circuit fuse) |
| Fuse carrying starting current | Branch circuit approach | At least 20 seconds |
| Starting method | Reduced voltage listed, but DOL in practice | 15 s rated-capacity rule, so DOL in effect |
| Reaching rated capacity | Controller fully functional within 10 s | At rated capacity within 15 s |
| Automatic shutdown | Prohibited; where permitted, a 10 min timer | Prohibited; manual stop only |
| Pressure switches | Sensing line per controller | Two independent switches per pump set |
| Diesel battery sets | Two sets, alternating | Two sets, alternating |
| Diesel cranking attempts | About 15 s crank / 15 s rest | 6 attempts of 5–10 s, 10–15 s between |
| Fuel tank | By hazard and duration; dedicated tank | LH 3 h, OH 4 h, HHP/HHS 6 h |
| Weekly test duration | 30 minutes | 20 minutes (suppliers usually say 30) |
| Annual full load test | 3 points (churn, rated, 150 percent) | Full load condition; 3 points not imposed |
| Pressure at 140 percent flow | 65 percent of rated pressure rule | 70 percent of rated pressure (pre-calculated HH) |
| Closed valve pressure | Must not exceed 140 percent of rated | 12 bar limit at the equipment |
| Pump room fire resistance | Separation; AHJ dependent | At least 60 minutes (REI 60) |
| Pump room temperature | Engine manufacturer's limit | Electric 4 °C, diesel 10 °C |
| Controller and motor in one room | May be separate, with protected cable | Same compartment mandatory (submersible excepted) |
| Cabling | NFPA 70 Article 695 protected route | Flame retardant on a protected route, or E 90/PH 90 |
| Jockey pump | Separate; a fire pump may not be the jockey | Must not be able to supply one open sprinkler |
The three rows most often misread
- Weekly test duration. NFPA 25 states 30 minutes from the outset; EN 12845 sets 20 minutes as a floor but leaves the door open to the supplier's recommendation. Because engine blocks reach operating temperature at 25 to 28 minutes, 30 minutes is the right field practice; 20 minutes complies but is not conservative.
- Fuel volume. EN 12845 gives net hours by hazard class (3/4/6). NFPA ties the duration to system demand. On a mixed project, always take the larger.
- Controller and motor in the same room. EN 12845 requires it except for submersible pumps. Moving the panel into an external corridor for appearance is a clear breach.
The mixed-project rule: where NFPA 20 and EN 12845 are both required, apply whichever is stricter in each row. If the insurer also requires FM DS 3-7, a third layer arrives: FM Approved pumps, drivers, controllers and relief valves only.
Test records
Both standards make records mandatory, and they are the first thing asked for at inspection: the last 12 months of weekly logbook entries and the annual full load flow test report. Writing "OK" in the logbook is not enough; the starting pressure, pump discharge pressure, oil pressure, engine temperature, battery voltage, fuel level and running time must be recorded numerically. A non-numerical log shows no trend, and only the numbers reveal that the oil pressure has been falling through the year.
Frequently Asked Questions
Why is there no overload relay in a fire pump controller?
Because the pump must not stop during a fire. Both standards permit short circuit protection only; overload protection is deliberately absent. An overload relay is exactly the device most likely to trip under fire conditions.
How long must the weekly test run?
NFPA 25 says 30 minutes. EN 12845 sets 20 minutes as a floor but allows the supplier's recommendation; because engine blocks reach operating temperature at 25 to 28 minutes, 30 minutes is the right field practice.
How many hours of fuel must the tank hold?
EN 12845 states it by hazard class: 3 hours for LH, 4 for OH and 6 for HHP and HHS. NFPA ties the duration to system demand; on a mixed project take the larger.
Can the controller and motor be in separate rooms?
Not under EN 12845; the same compartment is mandatory except for submersible pumps. NFPA is more flexible but keeps the cable protection strict.

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 86+ Engineering Calculators
MEP Calc bundles 86+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 20 Standard for the Installation of Stationary Pumps for Fire Protection (2025). BS EN 12845:2015+A1:2019 pump clauses. EN 17451 (sprinkler pump sets). FM Global DS 3-7. Values are for information only.