A tank farm fire does not always start inside a tank. An overfilled tank, a leaking flange or a dropped hose during loading can spread liquid outside the tank, into the dike or across open ground. NFPA 11-2024 Chapter 5 treats these fires in three separate areas. These are loading racks (5.6), outdoor diked areas (5.7) and nondiked spill areas (5.8). In all three, foam goes onto a layer of fuel spread over the ground rather than onto a tank surface. What differs is the fuel depth, how the foam is applied and how long it must run. This article sets out the tables and layout rules for the three areas side by side.
In short: Fuel depth decides which rules apply. An area that can hold fuel deeper than 25 mm (1 in) is a diked area (5.7.1). A spill with an average depth of no more than 25 mm, bounded only by the ground contour, is a nondiked spill (A.5.8). Inside a dike, low-level outlets apply 4.1 mm/min and monitors 6.5 mm/min. The time is 30 minutes for Class I and 20 minutes for Class II hydrocarbons (Table 5.7.3.2). Loading racks and nondiked spills get 15 minutes from monitors or portable nozzles. The rate is 6.5 or 4.1 mm/min depending on foam type (Tables 5.6.5.3.1 and 5.8.1.2).
Three areas, three definitions
| Area | Definition | Methods allowed | Clause |
|---|---|---|---|
| Loading rack | Truck or rail car rack for loading or unloading product | Foam-water sprinklers or nozzles; foam monitors; other devices approved by the AHJ | 5.6.1, 5.6.3 |
| Diked area (outdoor) | Area bounded by ground contours or physical barriers that retains fuel deeper than 25 mm | Low-level fixed outlets; monitors or foam hoselines; foam-water sprinklers or nozzles | 5.7.1–5.7.3 |
| Nondiked spill area | Area where a spill is not contained by curbs, dike walls or room walls | Portable foam nozzles or monitors | 5.8.1, A.5.8 |
The standard states that the list of methods for diked areas is not in order of preference (5.7.3.1).
Loading racks (5.6)
Many factors go into the design of a loading rack foam system. These include total rack size, the products handled, nearby hazards and exposures, drainage, wind, ambient temperature and available staff (5.6.2). A rack protected by foam-water sprinklers is designed to Chapter 6 (5.6.4). That method is covered in foam-water sprinkler systems.
For monitor protection, the design area is the total ground area within the curb (5.6.5.1). The aim is to protect the canopy, pumps, meters, vehicles and loading equipment in a spill fire (5.6.5.2).
| Foam type (Table 5.6.5.3.1) | Minimum rate | Minimum time | Product loaded |
|---|---|---|---|
| Protein, fluoroprotein and SFFF | 6.5 mm/min (0.16 gpm/ft²) | 15 min | Hydrocarbons |
| AFFF, FFFP and alcohol-resistant AFFF/FFFP | 4.1 mm/min (0.10 gpm/ft²) | 15 min | Hydrocarbons |
| Alcohol-resistant foams | Manufacturer's listing for the product | 15 min | Ignitable liquids needing alcohol-resistant foam |
Foam types not in the table are accepted when used in line with their listing (5.6.5.3.1.1). If fuel deeper than 25 mm can collect in the protected area, the rate rises to 6.5 mm/min whatever the foam type (5.6.5.3.2). At that depth the fuel behaves more like a pool than a thin spill.
Annex A makes two more recommendations. The first concerns monitor locations. Traffic, obstructions, wind and effective nozzle range decide whether foam reaches the whole area at the required rate. The monitor manufacturer's data on range and pattern should be used (A.5.6.5.1). The second concerns actuation. Automating the system on a truck loading rack should be considered, to reduce loss of life and property. This means either fully automatic detection and actuation or push-button stations. Manual operation alone is only acceptable where the AHJ agrees (A.5.6).
Outdoor diked areas (5.7)
A diked area is protected by low-level fixed outlets, fixed or portable monitors, or foam hoselines (5.7.2). For hydrocarbon dikes, the figures for fixed application are in Table 5.7.3.2:
| Outlet type | Minimum rate | Class I hydrocarbon | Class II hydrocarbon |
|---|---|---|---|
| Low-level foam outlets | 4.1 mm/min (0.10 gpm/ft²) | 30 min | 20 min |
| Foam monitors | 6.5 mm/min (0.16 gpm/ft²) | 30 min | 20 min |
| Compressed air foam | Manufacturer's listed minimum rate | 30 min | 20 min |
Class I is a liquid with a flash point below 38 °C (3.3.8). Annex A, drawing on NFPA 30, describes Class II as a liquid with a flash point from 38 °C up to 60 °C (A.3.3.20.1).
Low-level fixed outlets
Low-level outlets can be open pipe fittings or directional nozzles. They deliver a compact, low-velocity foam stream onto the inside of the dike wall, or straight onto the dike floor where needed (5.7.3.5.1). They are placed around the dike wall, and inside the dike if necessary, so that foam covers the whole area evenly (5.7.3.5.2, 5.7.3.3.1). The spacing limit depends on flow per outlet:
- With 230 L/min (60 gpm) or less per outlet, no point in the dike may be more than 9 m (30 ft) from an outlet (5.7.3.5.3.1).
- With more than 230 L/min per outlet, the distance between outlets is at most 18 m (60 ft) (5.7.3.5.3.2).
Large dikes may be subdivided to keep the total design flow within practical limits (5.7.3.3.2). Annex A notes that low-level outlets cannot reach overhead structures or tank surfaces, so supplementary overhead foam spray may be needed (A.5.7.3.5.3).
Monitors and foam-water sprinklers
Monitors discharging into a dike are located outside it (5.7.3.5.4). Where monitors are the primary protection, the design allows for some foam being blown beyond the spill area (5.7.3.5.4.1). The same wind allowance applies to foam-water sprinklers or nozzles (5.7.3.4.2). A compact, high-velocity foam stream is not plunged straight into the burning liquid. It is played against dike walls, tank surfaces or other structures (5.7.3.5.4.2). Sprinkler and nozzle systems are designed to Chapter 6 (5.7.3.4.1). Annex A notes that overhead application may need low-level outlets to cover the area under large obstructions. It adds that overhead pipework can be damaged by an explosion (A.5.7.3.4.2). Annex A also says portable monitors and foam hoselines have generally been adequate for diked fires. The recommended tactic is to put out and secure one section of the dike before moving on to the next (A.5.7).
Dikes with liquids that need alcohol-resistant foam (5.7.4)
These dikes need special engineering consideration (5.7.4.2). Fixed protection methods are the same as for hydrocarbon dikes (5.7.4.3.1). The rate comes from the manufacturer's listing- or approval-based advice for the product and the foam-making device (5.7.4.3.2). The minimum time is 30 minutes (5.7.4.3.3).
Nondiked spill areas (5.8)
First, the possible spill area is estimated (5.8.1.1). Table 5.8.1.2 then gives the design figures for portable nozzles or monitors (5.8.1.2). The table covers both hydrocarbons and liquids that need alcohol-resistant foam.
| Foam type (Table 5.8.1.2) | Minimum rate | Minimum time | Anticipated spill |
|---|---|---|---|
| Protein, fluoroprotein and SFFF | 6.5 mm/min (0.16 gpm/ft²) | 15 min | Hydrocarbon |
| AFFF, FFFP and alcohol-resistant AFFF/FFFP | 4.1 mm/min (0.10 gpm/ft²) | 15 min | Hydrocarbon |
| Alcohol-resistant foams | Manufacturer's listing for the product | 15 min | Ignitable liquids needing alcohol-resistant foam |
Foams not in the table are accepted when used in line with their listing (5.8.1.2.1). Annex A assumes that in a nondiked spill fire the average fuel depth does not exceed 25 mm and the fire is bounded only by the ground contour (A.5.8). If a spill collects in a pit or drainage channel and gets deeper than 25 mm, treat that part as a diked area.
Worked examples
| Case | Calculation | Result |
|---|---|---|
| Loading rack, curbed area 24 m × 12 m, AFFF, monitors | 288 × 4.1 × 15 | 1,181 L/min; about 17.7 m³ solution |
| Same rack, fuel can collect deeper than 25 mm | 288 × 6.5 × 15 | 1,872 L/min; about 28.1 m³ |
| Dike 1,000 m², Class I, low-level outlets | 1,000 × 4.1 × 30 | 4,100 L/min; 123 m³ |
| Same dike, Class II | 1,000 × 4.1 × 20 | 4,100 L/min; 82 m³ |
| Same dike, Class I, monitors | 1,000 × 6.5 × 30 | 6,500 L/min; 195 m³ |
| Nondiked spill 200 m², protein foam | 200 × 6.5 × 15 | 1,300 L/min; 19.5 m³ |
In the dike example, choosing 230 L/min per outlet means at least 4,100 / 230 = 17.8 → 18 outlets. They are spread so that no point is more than 9 m from an outlet. With 600 L/min outlets, 7 outlets cover the flow. In that case the distance between outlets must not exceed 18 m. Section 5.7 does not say whether tank footprints inside the dike are deducted from the area. Agree the design area with the authority having jurisdiction. You can try flow, time and concentrate figures in the foam concentrate calculator. The number and duration of supplementary hose streams around tanks are covered in NFPA 11 supplementary foam hose streams and monitors.
Common mistakes
- Designing a poorly drained loading rack where fuel can pool at 4.1 mm/min (5.6.5.3.2).
- Placing dike monitors inside the dike. They belong outside it (5.7.3.5.4).
- Ignoring wind losses for monitors and sprinklers (5.7.3.4.2, 5.7.3.5.4.1).
- Plunging a compact, high-velocity stream into the burning liquid (5.7.3.5.4.2).
- Mixing up the 9 m rule for small low-level outlets with the 18 m rule for larger ones (5.7.3.5.3).
- Using the hydrocarbon rate in a polar liquid dike. There the rate comes from the product listing and the time is at least 30 minutes (5.7.4.3).
For protecting the tanks themselves, see NFPA 11 fixed-roof tank foam and floating roof seal protection.
Frequently Asked Questions
What foam rate and time apply to a tank dike?
Under NFPA 11-2024 Table 5.7.3.2, low-level fixed outlets apply 4.1 mm/min and monitors 6.5 mm/min. The time is 30 minutes for Class I and 20 minutes for Class II hydrocarbons. For liquids needing alcohol-resistant foam, the rate comes from the product listing and the time is at least 30 minutes (5.7.4.3).
What is the difference between a diked area and a nondiked spill?
A diked area is bounded by ground contours or barriers and can hold fuel deeper than 25 mm (1 in) (5.7.1). In a nondiked spill the average depth does not exceed 25 mm and the liquid is bounded only by the ground (A.5.8). Nondiked spills are protected with portable nozzles or monitors for 15 minutes (Table 5.8.1.2).
What monitor rate applies to a loading rack?
Table 5.6.5.3.1 gives 6.5 mm/min for protein, fluoroprotein and SFFF, and 4.1 mm/min for AFFF and FFFP. The time is 15 minutes over the total ground area within the curb (5.6.5.1). If fuel deeper than 25 mm can collect, the rate rises to 6.5 mm/min (5.6.5.3.2).
How closely are low-level outlets spaced in a dike?
With 230 L/min (60 gpm) or less per outlet, no point in the dike may be more than 9 m from an outlet (5.7.3.5.3.1). Above 230 L/min per outlet, the distance between outlets is at most 18 m (5.7.3.5.3.2).
Where do dike foam monitors go?
Monitors discharging into a dike are located outside it (5.7.3.5.4). The design allows for some foam being carried off by wind. A high-velocity stream is played against the dike wall or a tank surface, not plunged into the burning liquid (5.7.3.5.4.1, 5.7.3.5.4.2).

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 11, Standard for Low-, Medium-, and High-Expansion Foam, 2024 edition: 3.3.8 (p. 11-10); 5.6, 5.7.1–5.7.3.2 (p. 11-27); Table 5.6.5.3.1, Table 5.7.3.2, 5.7.3.3–5.7.3.5 (p. 11-28); 5.7.4, 5.8, Table 5.8.1.2 (p. 11-29); Annex A: A.3.3.20.1 (p. 11-62), A.5.6 (p. 11-86), A.5.6.5.1, A.5.7, A.5.7.3.4.2, A.5.7.3.5.3, A.5.8 (p. 11-88). Values were read from the standard's PDF pages. The binding text is the standard itself and the decision of the authority having jurisdiction.