This article in the NFPA 25 series covers Chapter 6: standpipe and hose systems. After the fire pump and sprinkler system articles, this one deals with the standpipes themselves as installed to NFPA 14: hose, hose nozzles, hose storage devices, cabinets, piping and hangers, the hydraulic design information sign, the 5-year flow test and hydrostatic test, and what to do when a component changes. Common components such as valves, hose valves, pressure-reducing valves, gauges and alarm devices are sent to Chapter 13; they are covered in the valves and common components article. The underground mains and hydrants that feed the building are the subject of the Chapter 7 article. Every line carries its clause number from NFPA 25-2026.
In short: Hose, hose storage devices, cabinets, piping, hangers and the hydraulic design sign are inspected annually; hose nozzles annually and after each use (6.2, Table 6.1.1.2). Automatic standpipes get a flow test every 5 years: for Class I and Class III, 500 gpm (1892 L/min) at the most remote standpipe plus 250 gpm (946 L/min) for each additional standpipe, flowing simultaneously (6.3.1.1, 6.3.1.2). Manual standpipes and semiautomatic dry standpipes get a hydrostatic test of at least 200 psi (13.8 bar) for 2 hours every 5 years (6.3.2.1). Where water damage is a possibility, a 25 psi (1.7 bar) air test comes before water is introduced (6.3).
A. Scope and general rules
Chapter 6 gives the minimum requirements for routine inspection, testing and maintenance of standpipe and hose systems installed to NFPA 14 or another approved installation standard (6.1.1.1). Minimum frequencies come from Table 6.1.1.2 (6.1.1.2). All required activities are carried out to determine that components are free of corrosion, foreign material, physical damage, tampering or other conditions that adversely affect system operation (6.1.2).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Common components and valves | Inspected, tested and maintained per Chapter 13 | 6.1.3 |
| ☐ Obstruction investigation needed | Follow the procedures of Chapter 14 | 6.1.4 |
| ☐ ITM results in or involves a system out of service | Follow the impairment procedures of Chapter 15 | 6.1.5 |
| ☐ Removal of existing hose | Where approved by the AHJ, existing hose may be removed and is not recorded as a deficiency | 6.1.6 |
B. Frequency summary: Table 6.1.1.2
The standard’s summary table is reproduced below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the reference in the right-hand column (mostly Chapter 13, and NFPA 1930 for hose testing).
| Item | Frequency | Reference |
|---|---|---|
| Inspection | ||
| Cabinet | Annually | 6.2.9 |
| Control valves | — | Chapter 13 |
| Gauges | — | Chapter 13 |
| Hose | Annually | 6.2.6 |
| Hose nozzle | Annually and after each use | 6.2.7 |
| Hose storage device | Annually | 6.2.8 |
| Hydraulic design information sign | Annually | 6.2.2 |
| Hose valves and hose connections | — | Chapter 13 |
| Piping | Annually | 6.2.4 |
| Pressure-regulating devices | — | Chapter 13 |
| Supervisory devices (except valve supervisory devices) | — | Chapter 13 |
| Valve supervisory devices | — | Chapter 13 |
| Test | ||
| Control valves | — | Chapter 13 |
| System valves | — | Chapter 13 |
| Flow test | 5 years | 6.3.1 |
| Hose | — | NFPA 1930 |
| Hose connection pressure-regulating devices | — | Chapter 13 |
| Hose valves | — | Chapter 13 |
| Hydrostatic test (manual and semiautomatic dry standpipes) | 5 years | 6.3.2 |
| Main drain test | — | Chapter 13 |
| Pressure-reducing valve | — | Chapter 13 |
| Master pressure-reducing valve | — | Chapter 13 |
| Supervisory signal devices (except valve supervisory switches) | — | Chapter 13 |
| Valve status test | — | Chapter 13 |
| Valve supervisory devices | — | Chapter 13 |
| Waterflow alarm devices | — | Chapter 13 |
| Maintenance | ||
| Hose valves | — | Chapter 13 |
| Pressure gauges | — | Chapter 13 |
| Valves (all types) | Annually/as needed | Chapter 13 |
C. Annual inspection: components and the hydraulic design sign
Components of standpipe and hose systems are visually inspected annually or as specified in Table 6.1.1.2 (6.2.1).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Hydraulic design information sign | Annually: provided, attached securely and legible | 6.2.2 |
| ☐ Missing or illegible hydraulic design sign | Replaced | 6.2.2.1 |
| ☐ Standpipe system not sized by hydraulic design | The hydraulic design sign reads “Pipe Schedule System” | 6.2.2.2 |
| ☐ Deficiency at hose connections | Appropriate corrective action taken | 6.2.3.1 |
The Annex A.6.2.2 explanation recommends securing the sign with durable wire, chain or equivalent to the water supply control valve for automatic or semiautomatic standpipe systems, and at an approved location for manual systems. The sample sign in the same explanation (Figure A.6.2.2) lists: the location of the two hydraulically most remote hose connections; the design flow rate for those connections; the design residual inlet and outlet pressures for those connections; and the design static pressure and design system demand (flow and residual pressure) at the system control valve, or at the pump discharge flange where a pump is installed, and at each fire department connection.
D. Pipe, fittings, hangers and supports
| Check | Criterion | Clause |
|---|---|---|
| ☐ Pipe and fittings | Inspected annually from the floor level | 6.2.4.1 |
| ☐ Use of piping | Not used to support nonsystem components | 6.2.4.2 |
| ☐ Pipe and fittings in concealed spaces such as above suspended ceilings | No inspection required | 6.2.4.3 |
| ☐ Pipe and fittings in areas inaccessible for safety reasons due to process operations | Inspected during each scheduled shutdown | 6.2.4.4 |
| ☐ Pipe hangers, braces and supports | Inspected annually from the floor level | 6.2.5 |
| ☐ Condition of hangers, braces and supports | Not damaged, loose or unattached | 6.2.5.1 |
| ☐ Damaged, loose or unattached hangers and supports | Replaced or refastened | 6.2.5.2 |
| ☐ Hangers, braces and supports in concealed spaces | No inspection required | 6.2.5.3 |
| ☐ Hangers, braces and supports in areas inaccessible due to process operations | Inspected during each scheduled shutdown | 6.2.5.4 |
Per the Annex A.6.2.4.1 explanation, surface corrosion that does not affect pipe strength or raise concern of leakage should not by itself warrant pipe replacement; judgment is applied in deciding how much corrosion calls for replacement. Annex A.6.2.4.3 and A.6.2.5.3 list some floor/ceiling and roof/ceiling assemblies, areas under theater stages and pipe chases as further examples of concealed spaces.
E. Hose, hose nozzle and hose storage device
Hose is inspected annually, as required by NFPA 1930, for the following conditions (6.2.6.1); where any deficiency is noted, appropriate corrective action is taken (6.2.6.2):
| Check | Criterion | Clause |
|---|---|---|
| ☐ Mildew, cuts, abrasions and deterioration | None | 6.2.6.1(1) |
| ☐ Couplings and hose threads | Not damaged | 6.2.6.1(2) |
| ☐ Gaskets | Not missing or deteriorated | 6.2.6.1(3) |
| ☐ Coupling threads | No incompatible threads | 6.2.6.1(4) |
| ☐ Hose connection | Connected to the hose rack nipple or valve | 6.2.6.1(5) |
Hose nozzles are inspected annually for the following conditions (6.2.7.1); Table 6.1.1.2 also calls for nozzle inspection after each use. Where any deficiency is noted, appropriate corrective action is taken (6.2.7.2).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Hose nozzle | Present, not missing | 6.2.7.1(1) |
| ☐ Nozzle gasket | Not missing or deteriorated | 6.2.7.1(2) |
| ☐ Nozzle bore | No obstructions | 6.2.7.1(3) |
| ☐ Nozzle operation | Operates smoothly | 6.2.7.1(4) |
Hose storage devices (racks, reels) are inspected annually for the following conditions (6.2.8.1); where any deficiency is noted, appropriate corrective action is taken (6.2.8.2):
| Check | Criterion | Clause |
|---|---|---|
| ☐ Ease of operation | Not difficult to operate | 6.2.8.1(1) |
| ☐ Physical condition | Not damaged | 6.2.8.1(2) |
| ☐ Access | No visible or physical obstruction | 6.2.8.1(3) |
| ☐ Hose stowage | Properly racked or rolled | 6.2.8.1(4) |
| ☐ Nozzle clip | In place, nozzle correctly contained | 6.2.8.1(5) |
| ☐ Hose rack enclosed in a cabinet | Swings out at least 90 degrees | 6.2.8.1(6) |
F. Cabinet
Cabinets are inspected annually for the following conditions (6.2.9.1); where any deficiency is noted, appropriate corrective action is taken (6.2.9.2):
| Check | Criterion | Clause |
|---|---|---|
| ☐ Overall condition | No corroded or damaged parts | 6.2.9.1(1) |
| ☐ Opening | Not difficult to open | 6.2.9.1(2) |
| ☐ Cabinet door | Opens fully | 6.2.9.1(3) |
| ☐ Door glazing | Not cracked or broken | 6.2.9.1(4) |
| ☐ Lock on break glass–type cabinet | Functions properly | 6.2.9.1(5) |
| ☐ Glass break device | Present and attached | 6.2.9.1(6) |
| ☐ Identification | Properly identified as containing fire equipment | 6.2.9.1(7) |
| ☐ Access | No visible or physical obstructions | 6.2.9.1(8) |
| ☐ Contents | All valves, hose, nozzles, fire extinguishers, etc. easily accessible | 6.2.9.1(9) |
G. Air test before water, and the 5-year flow test
Where water damage is a possibility, an air test at 25 psi (1.7 bar) is conducted on the system before water is introduced (6.3). A flow test is conducted every 5 years on all automatic standpipe systems to verify that the required flow and pressure are available at the hydraulically most remote hose valve outlet(s) while flowing the standpipe system demand (6.3.1.1).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Class I and Class III system demand | 500 gpm (1892 L/min) for the most remote standpipe and 250 gpm (946 L/min) for each additional standpipe until the total system demand is flowing simultaneously | 6.3.1.2 |
| ☐ Horizontal standpipe on a Class I or Class III system supplying three or more hose connections | 750 gpm (2840 L/min) for the most remote standpipe and 250 gpm (946 L/min) for each additional standpipe until the total system demand is flowing simultaneously | 6.3.1.2.1 |
| ☐ The 250 gpm (946 L/min) from each additional Class I and Class III standpipe | May be flowed from the most convenient hose valve on that standpipe | 6.3.1.2.2 |
| ☐ 250 gpm (946 L/min) cannot be flowed from each additional standpipe | The AHJ determines where the additional flow can be taken | 6.3.1.2.3 |
| ☐ Class II system demand | 100 gpm (379 L/min) for the most remote standpipe connection | 6.3.1.3 |
| ☐ Basis of the demand | Design criteria in effect at the time of installation | 6.3.1.4 |
| ☐ Demand cannot be determined | The AHJ determines the demand | 6.3.1.4.1 |
| ☐ Test method and performance criteria | Discussed in advance with the AHJ | 6.3.1.4.2 |
| ☐ Flow test at the most remote outlet(s) not practical | The AHJ is consulted for the appropriate test location | 6.3.1.1.1 |
| ☐ Test gauges | Gauges maintained in accordance with 8.3.3.5.2 are provided | 6.3.1.1.2 |
| ☐ Standpipes, sprinkler connections to standpipes and hose stations with pressure-reducing or pressure-regulating valves | These valves inspected, tested and maintained per Chapter 13 | 6.3.1.5 |
The Annex A explanations add practical notes. The hydraulically most remote hose connections in a building are generally at a roof manifold, if provided, or at the top of a stair leading to the roof; in a multizone system the testing means is generally a test header at grade or a suction tank on higher floors (Annex A.6.3.1.1). Section 6.3.1.2.1 is not intended to flow test both vertical and horizontal standpipes in the same building, only the more demanding of the two, and the other hose valve and pressure-regulating valve testing required by Chapter 13 is unchanged (Annex A.6.3.1.2.1). Since pressures at each standpipe need not be balanced, any hose valve on the standpipe can be flowed for the additional 250 gpm, and one on an upper level may be more convenient than the lowest (Annex A.6.3.1.2.2). Where attaching a hose to a standpipe is not reasonable, the AHJ can allow the additional flow from other outlets, such as another standpipe or the fire pump test header; the results will not match the hydraulic calculations, but the test still proves the most remote standpipe can deliver the flow and pressure needed by the fire department while the full system demand flows (Annex A.6.3.1.2.3).
H. Main drain test
| Check | Criterion | Clause |
|---|---|---|
| ☐ All standpipe systems with automatic water supplies | Main drain test performed per Chapter 13 | 6.3.1.6 |
| ☐ Test location | The low point drain of each standpipe, or the main drain test connection where the supply main enters the building (when provided) | 6.3.1.6.1 |
| ☐ Test gauges | Gauges maintained per Chapter 13 are provided | 6.3.1.6.2 |
I. 5-year hydrostatic test
Manual standpipe systems and semiautomatic dry standpipe systems, including the piping in the fire department connection, are hydrostatically tested every 5 years at not less than 200 psi (13.8 bar) for 2 hours, or at 50 psi (3.4 bar) above the maximum pressure where the maximum pressure exceeds 150 psi (10.3 bar) (6.3.2.1).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Manual wet standpipes that are part of a combined sprinkler/standpipe system | Not required to be tested per 6.3.2.1 | 6.3.2.1.1 |
| ☐ Where test pressure is measured | At the low elevation point of the individual system or zone being tested | 6.3.2.2 |
| ☐ Standpipe piping | No visible signs of leakage | 6.3.2.2.1 |
| ☐ Gauge pressure drop | A drop of 5 psi (0.3 bar) or less is not a failure | 6.3.2.2.2 |
Per the Annex A.6.3.2.1 explanation, the intent is to find out whether the system keeps its integrity under fire conditions; minimum leakage existing only under test pressure is not cause for repair. Annex A.6.3.2.2.1 notes that some minor leakage may occur that is not visible; the test is meant to confirm there is no visible leakage from pipe and fittings, since such leakage would indicate corrosion or other damage to the standpipe.
J. Waterflow alarm and supervisory alarm devices
| Check | Criterion | Clause |
|---|---|---|
| ☐ Waterflow alarm and supervisory alarm devices (where provided) | Tested per 13.2.3 and 13.3.3.5 | 6.3.3.1 |
| ☐ Freezing conditions delay testing | Tests performed as soon as weather allows | 6.3.3.2 |
K. Maintenance
| Check | Criterion | Clause |
|---|---|---|
| ☐ Maintenance and repairs | Per 6.1.3 and Table 6.1.1.2 | 6.4.1 |
| ☐ Equipment failing inspection or testing requirements | Repaired and tested again, or replaced | 6.4.2 |
L. When a component is adjusted, repaired or replaced: Table 6.5.1
Whenever standpipe and hose system components are adjusted, repaired, reconditioned or replaced, the actions in Table 6.5.1 are performed (6.5.1). Where the original installation standard differs from the cited one, the appropriate installing standard may be used (6.5.2). These actions do not require a design review, which is outside the scope of the standard (6.5.3). Fire hose appears on two rows: no action is required when hose is replaced, while repaired hose gets a hydrostatic test per NFPA 1930.
| Component | Adjust | Repair | Replace | Required action |
|---|---|---|---|---|
| Water delivery components | ||||
| Backflow prevention device | X | X | X | See Chapter 13 |
| Control valves | X | X | X | See Chapter 13 |
| Fire department connections | X | X | X | See Chapter 13 |
| Fire hose | — | — | X | No action required |
| Fire hose | — | X | — | Perform hydrostatic test in accordance with NFPA 1930 |
| Hose valve | X | X | X | See Chapter 13 |
| Hose valve pressure-regulating devices | X | X | X | See Chapter 13 |
| Piping | X | X | X | Hydrostatic test in conformance with NFPA 14 |
| System pressure-regulating devices | X | X | X | See Chapter 13 |
| Alarm and supervisory components | ||||
| Pressure switch–type waterflow | X | X | X | Operational test using inspector’s test connection |
| Valve supervisory device | X | X | X | Operational test for receipt of alarms and verification of conformance with NFPA 14 and/or NFPA 72 |
| Vane-type waterflow | X | X | X | Operational test using inspector’s test connection |
| Water motor gong | X | X | X | Operational test using inspector’s test connection |
| Status-indicating components | ||||
| Gauges | X | — | X | Verify at 0 psi (0 bar) and system working pressure |
| System housing and protection components | ||||
| Cabinet | X | X | X | Verify conformance with NFPA 14 |
| Hose storage rack | X | X | X | Verify conformance with NFPA 14 |
| Testing and maintenance components | ||||
| Auxiliary drains | X | X | X | Inspect for leaks at system working pressure |
| Drain riser | X | X | X | Inspect for leaks while flowing from connection above the repair |
| Main drain | X | X | X | Inspect for leaks and residual pressure during main drain test |
| Structural components | ||||
| Hanger/seismic bracing | X | X | X | Verify conformance with NFPA 14 |
| Pipe stands | X | X | X | Verify conformance with NFPA 14 |
| Informational components | ||||
| Hydraulic design information sign | X | X | X | Verify conformance with NFPA 14 |
| Identification signs | X | X | X | Verify conformance with NFPA 14 |
M. Calendar summary: Chapter 6’s own frequencies
The table below gathers the tasks whose frequency is stated in Chapter 6’s own clauses. Frequencies for valves, gauges, pressure-reducing valves and alarm devices are not in this table; they come from Chapter 13.
| Task | Frequency | Clause |
|---|---|---|
| ☐ Inspection of the hydraulic design sign, piping, hangers, hose, hose storage devices and cabinets | Annually | 6.2.2, 6.2.4.1, 6.2.5, 6.2.6.1, 6.2.8.1, 6.2.9.1 |
| ☐ Hose nozzle inspection | Annually and after each use | 6.2.7.1, Table 6.1.1.2 |
| ☐ Pipe and hangers in areas inaccessible due to process operations | Each scheduled shutdown | 6.2.4.4, 6.2.5.4 |
| ☐ Air test where water damage is a possibility | Before water is introduced, 25 psi (1.7 bar) | 6.3 |
| ☐ Flow test on automatic standpipes | Every 5 years | 6.3.1.1 |
| ☐ Hydrostatic test on manual and semiautomatic dry standpipes | Every 5 years | 6.3.2.1 |
| ☐ Alarm device tests delayed by freezing | As soon as weather allows | 6.3.3.2 |
| ☐ Maintenance of valves (all types) | Annually/as needed (Chapter 13) | Table 6.1.1.2 |
Frequently Asked Questions
How often are hose cabinets and hose inspected under NFPA 25?
Annually. Hose is checked for mildew, cuts, abrasions, damaged threads, missing gaskets, incompatible threads and not being connected (6.2.6.1); cabinets for corrosion, door, glazing, lock, identification, obstructions and access (6.2.9.1). Per Table 6.1.1.2, hose nozzles are inspected annually and after each use.
When is a standpipe flow test required and at what flow?
Every 5 years on all automatic standpipe systems (6.3.1.1). For Class I and III, 500 gpm (1892 L/min) at the most remote standpipe and 250 gpm (946 L/min) for each additional one; 750 gpm (2840 L/min) at the most remote standpipe where a horizontal standpipe supplies three or more hose connections; 100 gpm (379 L/min) at the most remote connection for Class II (6.3.1.2, 6.3.1.2.1, 6.3.1.3). The demand is based on the design criteria in effect at installation (6.3.1.4).
Which standpipes need a hydrostatic test?
Manual standpipes and semiautomatic dry standpipes, including fire department connection piping, every 5 years: at least 200 psi (13.8 bar) for 2 hours, or 50 psi (3.4 bar) above the maximum pressure where it exceeds 150 psi (10.3 bar) (6.3.2.1). Manual wet standpipes that are part of a combined sprinkler/standpipe system are exempt (6.3.2.1.1).
Does a pressure drop during the hydrostatic test mean failure?
A drop of 5 psi (0.3 bar) or less is not a failure (6.3.2.2.2). Pressure is measured at the low elevation point of the system or zone being tested, and the piping must show no visible leakage (6.3.2.2, 6.3.2.2.1).
Can existing fire hose be removed?
Where approved by the AHJ, existing hose may be removed and is not recorded as a deficiency (6.1.6). Per Table 6.5.1, no action is required when hose is replaced; repaired hose is hydrostatically tested per NFPA 1930.

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 6 (6.1–6.5), Table 6.1.1.2, Table 6.5.1 and Annex A explanations (A.6.2.2, A.6.2.4.1, A.6.2.4.3, A.6.2.5.3, A.6.3.1.1, A.6.3.1.2.1–A.6.3.1.2.3, A.6.3.2.1, A.6.3.2.2.1). The content of Chapters 8, 13, 14 and 15 and of NFPA 14, NFPA 72 and NFPA 1930 referenced by Chapter 6 is not reproduced here.