The third article in the NFPA 25 series covers Chapter 13: common components and valves. The fire pump and sprinkler system articles kept saying “see Chapter 13” for valves, gauges, alarm devices and the fire department connection; this is that chapter. Standpipe, private fire service main and water spray systems send their valves here too. Control valves, alarm, dry pipe, preaction and deluge valves, pressure-reducing valves, hose valves, backflow preventers, fire department connections, the main drain test, waterflow and supervisory devices, compressors and the actions required when a component changes are listed in order, each with its NFPA 25-2026 clause number.

In short: Control valves are inspected weekly; locked or supervised valves monthly and electrically supervised valves quarterly are permitted (13.3.2.1). Every control valve is operated through its full range annually (13.3.3.1). A main drain test is run annually at each water supply lead-in, and a 10 percent drop in full flow pressure must be explained (13.2.2). Vane, paddle and pressure-switch waterflow devices are tested semiannually and must alarm within 90 seconds (13.2.3.2). Gauges are replaced or compared with a calibrated gauge every 5 years (13.2.4.2). Dry pipe valves are trip tested annually and every 3 years with the control valve fully open (13.4.5.2). Backflow preventers get an annual forward flow test at system demand (13.7.2.1). FDC piping is hydrostatically tested at 150 psi (10 bar) for 2 hours every 5 years (13.8.5).

A. Scope and general provisions

Chapter 13 gives the minimum requirements for routine inspection, testing and maintenance of common components and valves (13.1.1.1). Minimum frequencies come from Table 13.1.1.2 (13.1.1.2).

CheckCriterionClause
☐ All system valvesProtected from physical damage and accessible13.2.1
☐ RecordsMaintained per Section 4.313.2.6
☐ Closing a normally open valveFollow the impairment procedures of Chapter 1513.3.1.2
☐ Automatic detection equipment that actuates water-based systemsInspected, tested and maintained per NFPA 7213.9.1

B. Frequency summary: Table 13.1.1.2

The standard’s summary table is reproduced below. Rows marked “—” have no frequency in the table; the requirements sit in the chapter shown on the right. Double entries such as “Annually/3 years” cover two separate tasks on the same item (for example partial and full flow trip tests).

ItemFrequencyReference
Inspection
Alarm valves: exteriorQuarterly13.4.1.1
Alarm valves: interior5 years13.4.1.2
Alarm valves: strainers, filters, orifices5 years13.4.1.2
Backflow prevention assemblies: reduced pressureWeekly13.7.1
Backflow prevention assemblies: reduced-pressure detectorsWeekly13.7.1
Backflow prevention assemblies: interior5 years13.7.1.3
Check valves: interior5 years13.4.2.1
Control valves: all valves except locked or supervisedWeekly13.3.2.1
Control valves: locked or supervisedMonthly13.3.2.1.1
Control valves: electrically supervisedQuarterly13.3.2.1.2
Dry pipe valves/quick-opening devices: enclosure (during cold weather)—Chapter 4
Dry pipe valves: exteriorMonthly13.4.5.1.2
Dry pipe valves: interiorAnnually13.4.5.1.3
Dry pipe valves: strainers, filters, orifices5 years13.4.5.1.4
Dry pipe valves: low-temperature alarmAnnuallyChapter 4
Deluge valves: enclosure (during cold weather)Daily/weeklyChapter 4
Deluge valves: exteriorMonthly13.4.4.1.1
Deluge valves: interiorAnnually13.4.4.1.2
Deluge valves: strainers, filters, orifices5 years13.4.4.1.3
Fire department connectionsQuarterly13.8.1
GaugesMonthly/quarterly13.2.4
Hose valves and hose connectionsQuarterly13.6.1
Preaction valves: enclosure (during cold weather)—Chapter 4
Preaction valves: exteriorMonthly13.4.3.1.1
Preaction valves: interiorAnnually13.4.3.1.2
Preaction valves: strainers, filters, orifices5 years13.4.3.1.3
Pressure-regulating devices: master pressure-reducing valveWeekly13.5.4.1
Pressure-regulating devices: pressure-reducing valveQuarterly13.5.1.1
Pressure-regulating devices: pressure-reducing hose connectionAnnually13.5.2.1
Pressure-regulating devices: pressure-reducing hose valve with hose rack assemblyAnnually13.5.3.1
Valve supervisory signal initiating deviceQuarterly13.3.2.1.3
Supervisory signal devices (except valve supervisory switches)Quarterly13.2.5.1
Air compressors or nitrogen generatorsMonthly13.10.2
Corrosion inhibitor systemsPer manufacturer13.11
Waterflow alarmsQuarterly13.2.3
Testing
Backflow prevention assembliesAnnually13.7.2
Control valves: operation and positionAnnually13.3.3.1
Control valves: valve status testAfter control valve is closed and reopened13.3.3.4
Control valves: valve supervisory signal initiating deviceSemiannually13.3.3.5.1
Deluge valves: solenoid supervisoryQuarterly13.4.4.2.14
Deluge valves: trip testAnnually/3 years13.4.4.2.3
Dry pipe valves: air leakage3 years13.4.5.2.9
Dry pipe valves: priming waterQuarterly13.4.5.2.1
Dry pipe valves: low and high air pressure alarmAnnually13.4.5.2.6
Dry pipe valves: quick-opening devicesQuarterly13.4.5.2.4
Dry pipe valves: trip testAnnually13.4.5.2.2
Dry pipe valves: full-flow trip test3 years13.4.5.2.2.2
Gauges5 years13.2.4.2
Main drainsAnnually/quarterly13.2.2
Preaction valves: priming waterQuarterly13.4.3.2.1
Preaction valves: low and high air pressure alarmsQuarterly13.4.3.2.11
Preaction valves: solenoid supervisoryQuarterly13.4.4.2.14*
Preaction valves: trip testAnnually/3 years13.4.3.2.2 and 13.4.3.2.3
Preaction valves: air leakage3 years13.4.3.2.6
Preaction valves: low-temperature alarmAnnually13.4.3.2.12*
Pressure-regulating devices: master pressure-reducing valveQuarterly/annually13.5.4.2 and 13.5.4.3
Pressure-regulating devices: pressure-reducing valveAnnually/5 years13.5.1.3 and 13.5.1.2
Pressure-regulating devices: pressure-reducing hose valveAnnually/5 years13.5.2.3 and 13.5.2.2
Pressure-regulating devices: pressure-reducing hose valve with rack assemblyAnnually/5 years13.5.3.3 and 13.5.3.2
Air compressors or nitrogen generatorsAnnually13.10.3
Hose valvesAnnually/3 years13.6.2
Waterflow alarmsQuarterly/semiannually13.2.3
Supervisory signal devices (except valve supervisory switches)Annually13.2.5.2
Maintenance
Alarm valvesPer manufacturer13.4.1.3
Backflow prevention assembliesPer manufacturer13.7.3
Check valvesPer manufacturer13.4.2.2
Control valves (outside screw and yoke)Annually13.3.4
Deluge valvesAnnually13.4.4.3
Dry pipe valves/quick-opening devicesAnnually13.4.5.3
Hose valvesAs needed13.6.3
Preaction valvesAnnually13.4.3.3
Air compressors or nitrogen generatorsPer manufacturer13.10.4
Corrosion-inhibiting systemsPer manufacturer13.11

* For preaction valves the table cites 13.4.4.2.14 on the solenoid supervisory row and 13.4.3.2.12 on the low-temperature alarm row; in the text the matching preaction clauses are 13.4.3.2.12 (solenoid supervisory) and 13.4.3.2.13 (low-temperature alarm). The frequencies are the same in both places.

C. Main drain test

The main drain test is how you tell whether the condition of the water supply has changed (13.2.2).

CheckCriterionClause
☐ Each water supply lead-in to a building water-based systemMain drain test annually13.2.2
☐ Lead-in supplies a header or manifold serving multiple systemsA single main drain test is permitted13.2.2.1
☐ Sole water supply is through a backflow preventer and/or pressure-reducing valvesMain drain test of at least one downstream system quarterly13.2.2.2
☐ 10 percent reduction in full flow pressure versus the acceptance test or previous testsCause identified and corrected if necessary13.2.2.3

D. Waterflow alarm devices

Mechanical alarms (including water motor gongs) and vane, paddle and pressure-switch devices

CheckCriterionClause
☐ Mechanical waterflow alarm devices: physical damageInspected quarterly13.2.3.1.1
☐ Mechanical waterflow alarm devices: testQuarterly13.2.3.1.2
☐ Mechanical alarm responseAudible alarm starts within 5 minutes of flow beginning and continues until flow stops13.2.3.1.3
☐ Vane-, paddle- and pressure-switch-type devices: physical damageInspected quarterly13.2.3.2.1
☐ Vane-, paddle- and pressure-switch-type devices: testSemiannually13.2.3.2.2
☐ Electrical device responseWithin 90 seconds of waterflow at the alarm-initiating device, at a flow equal to one sprinkler of the smallest orifice size in the system13.2.3.2.3

Test method

CheckCriterionClause
☐ Testing on wet pipe systemsOpen the inspector’s test connection or use automated test equipment per Section 4.713.2.3.3
☐ Freezing weather or other conditions prohibit use of the inspector’s test connectionThe bypass connection is permitted13.2.3.4
☐ Vane-type devices on wet pipe systemsFlow equivalent to the smallest single K-factor sprinkler (or smaller) past the flow switch13.2.3.5
☐ Listed vane-type device with integral automated test featurePermitted where it verifies water at the device location and proper function of device and alarm13.2.3.5.1
☐ Vane-type devices tested semiannually with circulated water or per 13.2.3.5.1Tested by opening the inspector’s test connection at least once every 3 years13.2.3.5.2
☐ Testing on dry pipe, preaction or deluge systemsAny of: bypass connection, inspector’s test connection, or automated test equipment per Section 4.713.2.3.6

Device status during testing and maintenance

CheckCriterionClause
☐ Vane-type devicesRemain in service unless impairment procedures per NFPA 72 or an approved fire alarm code are followed13.2.3.7.1
☐ Disabling by preventing movement of the vane or stemProhibited13.2.3.7.1.1
☐ Waterflow alarm circuitsNot interrupted or disabled except as permitted by NFPA 72 or an approved fire alarm code13.2.3.7.1.2

E. Gauges and supervisory signal devices

CheckCriterionClause
☐ All gaugesMonthly: operable and not physically damaged13.2.4.1.1
☐ Gauges monitoring water pressureQuarterly: normal supply pressure maintained13.2.4.1.2
☐ Gauges monitoring air or nitrogen pressureMonthly: normal air or nitrogen pressure maintained13.2.4.1.3
☐ Quick-opening device gauge (if provided)Reads the same as the gauge on the system side of the dry pipe valve13.2.4.1.3.1
☐ Air pressure supervision connected to a constantly attended locationGauges may be inspected quarterly13.2.4.1.3.2
☐ Dry pipe or preaction systems protecting freezers with gauges on the air line between compressor and valveCompressor gauge compared monthly with the gauge above the valve13.2.4.1.4
☐ Compressor gauge reads higher than the valve gaugeTake the air line in service out of service and open the alternate air line to equalize13.2.4.1.4.1
☐ Air line taken out of serviceInternally inspected, cleared of all ice blockage and reassembled as a future alternate line13.2.4.1.4.2
☐ Gauge replacement or calibrationReplaced every 5 years after installation or tested every 5 years by comparison with a calibrated gauge13.2.4.2
☐ Gauge not accurate to within 3 percent of full scaleRecalibrated or replaced13.2.4.3
☐ Supervisory signal devices (except valve supervisory switches)Quarterly: free of physical damage13.2.5.1
☐ Supervisory signal devices: testAnnually, per the manufacturer’s instructions13.2.5.2

F. Control valves

Identification and securing

CheckCriterionClause
☐ Each control valveIdentified, with a sign indicating the system or portion it controls13.3.1
☐ More than one valve must be closed to work on a systemSign on each affected valve referring to the existence and location of the others13.3.1.1
☐ Normally open valvesSecured by seal or lock, or electrically supervised per the applicable NFPA standards13.3.1.3
☐ Normally closed valvesSecured by seal, or electrically supervised per the applicable NFPA standard13.3.1.4
☐ Hose valvesSealing or electrical supervision not required13.3.1.5

Inspection frequency and criteria

CheckCriterionClause
☐ All valvesInspected weekly13.3.2.1
☐ Valves secured with locks or supervised per applicable NFPA standardsMay be inspected monthly13.3.2.1.1
☐ Electrically supervised valvesMay be inspected quarterly13.3.2.1.2
☐ Control valve supervisory alarm devicesQuarterly: free of physical damage13.3.2.1.3
☐ After any alterations or repairsOwner or designated representative verifies the system is in service and all valves are in the normal position and properly sealed, locked or electrically supervised13.3.2.1.4
☐ PositionNormal open or closed position13.3.2.2(1)
☐ SecuritySealed, locked or supervised13.3.2.2(2)
☐ AccessAccessible13.3.2.2(3)
☐ Post indicator valves (PIVs)Provided with correct wrenches13.3.2.2(4)
☐ LeakageFree from external leaks13.3.2.2(5)
☐ IdentificationProvided with applicable identification13.3.2.2(6)

Testing and maintenance

CheckCriterionClause
☐ Each control valveOperated annually through its full range and returned to its normal position13.3.3.1
☐ Post indicator valvesOpened until spring or torsion is felt in the rod, showing the rod has not detached from the valve13.3.3.2
☐ PIV spring/torsion testConducted every time the valve is closed13.3.3.2.1
☐ PIVs and OS&Y valvesBacked a one-quarter turn from fully open to prevent jamming13.3.3.3
☐ Control valve closed and reopened at the system riserValve status test every time13.3.3.4
☐ Valve supervisory switchesTested semiannually13.3.3.5.1
☐ Supervisory signalDistinctive signal within the first two revolutions of the handwheel or when the stem has moved one-fifth of the distance from its normal position13.3.3.5.2
☐ Signal restorationNot restored at any valve position except the normal position13.3.3.5.3
☐ OS&Y valve operating stemsLubricated annually13.3.4.1
☐ After lubricationValve completely closed and reopened to test operation and distribute the lubricant13.3.4.2

G. Alarm valves and check valves

Alarm valves and system riser check valves are externally inspected quarterly to verify the following (13.4.1.1):

CheckCriterionClause
☐ GaugesIndicate normal supply water pressure is maintained13.4.1.1(1)
☐ Valves and trimFree of physical damage13.4.1.1(2)
☐ All valvesIn the appropriate open or closed position13.4.1.1(3)
☐ Retarding chamber or alarm drainsNot leaking13.4.1.1(4)
☐ Valve in the connection to pressure-type contacts or water motor–operated alarm devices (where applicable)Sealed, locked or electrically supervised in the open position13.4.1.1(5)
☐ Alarm valves with strainers, filters and restriction orificesInternal inspection every 5 years unless tests indicate a greater frequency13.4.1.2
☐ Alarm valve internal componentsCleaned/repaired as necessary per the manufacturer’s instructions13.4.1.3.1
☐ Return to servicePer the manufacturer’s instructions13.4.1.3.2
☐ Check valvesInternal inspection every 5 years; all components operate correctly13.4.2.1
☐ Check valve internal componentsCleaned, repaired or replaced as necessary per the manufacturer’s instructions13.4.2.2

H. Preaction valves

Inspection

CheckCriterionClause
☐ External inspectionMonthly: valve free from physical damage; all trim valves in the appropriate position; valve seat not leaking; electrical components in service; valve in the connection to pressure-type contacts or water motor–operated alarms (where applicable) sealed, locked or electrically supervised open13.4.3.1.1
☐ Valve interior and condition of detection devicesAnnually, when the trip test is conducted13.4.3.1.2
☐ Strainers, filters and restricted orificesInternal inspection every 5 years unless tests indicate a greater frequency13.4.3.1.3
☐ Preaction systems with auxiliary drainsSign at the valve showing the number of auxiliary drains and the location of each13.4.3.1.4

Testing

CheckCriterionClause
☐ Priming water level in supervised systemsQuarterly, for compliance with the manufacturer’s instructions13.4.3.2.1
☐ Trip test with control valve fully openEvery 3 years (except systems protecting freezers)13.4.3.2.2
☐ Years without full flow testingTrip test with the control valve partially open13.4.3.2.3
☐ Scope of flow testsFull functionality of the system as a unit, including automatic and manual activation13.4.3.2.4
☐ Valves protecting freezersTrip tested without introducing moisture into the freezer piping13.4.3.2.5
☐ Air leakage test (every 3 years), method 1Pressure test at 40 psi for 2 hours; loss of up to 3 psi (0.2 bar) permitted, more than that and leaks are addressed13.4.3.2.6(1)
☐ Air leakage test, method 2At normal system pressure, shut off the air source (compressor or shop air) for 4 hours; if the low air pressure alarm operates, leaks are addressed13.4.3.2.6(2)
☐ Manual actuation devicesOperated annually13.4.3.2.7
☐ After the annual trip testSystem returned to service per the manufacturer’s instructions13.4.3.2.8
☐ Valve seating surfacesNo grease or other sealing materials applied13.4.3.2.9
☐ Trip recordsDate last tripped, tripping time, and the individual and organization conducting the test, readily available to the AHJ13.4.3.2.10
☐ Low and high air pressure alarms (if provided)Quarterly, per the manufacturer’s instructions13.4.3.2.11
☐ Solenoid supervisory signal device monitoring coil positionQuarterly13.4.3.2.12
☐ Low-temperature alarms in valve enclosures (if installed)Annually, toward the beginning of the heating season before freezing conditions13.4.3.2.13
☐ Automatic air pressure maintenance devices (if provided)Annually at the time of the annual trip test, per the manufacturer’s instructions13.4.3.2.14
☐ Systems using nitrogen for an increased C value per NFPA 13Nitrogen supply tested semiannually; concentration 98 percent or greater13.4.3.2.15
☐ Nitrogen concentration monitored at a constantly attended locationConcentration verified annually13.4.3.2.15.1
☐ Nitrogen concentration below 98 percentCause identified and corrected13.4.3.2.15.2

Maintenance

CheckCriterionClause
☐ Leaks dropping supervisory pressure enough to sound warning alarms, and electrical malfunctions causing alarmsLocated and repaired13.4.3.3.1
☐ During the annual trip testValve interior cleaned thoroughly; parts replaced or repaired as necessary13.4.3.3.2
☐ Auxiliary drainsOperated after each system operation, toward the beginning of the heating season before freezing (where applicable), and thereafter as needed13.4.3.3.3
☐ Additional maintenanceAs required by the manufacturer’s instructions13.4.3.3.4

I. Deluge valves

Inspection

CheckCriterionClause
☐ External inspectionMonthly: the same five criteria as preaction valves (damage, trim valve position, seat leakage, electrical components, alarm connection valve)13.4.4.1.1
☐ Valve interior and condition of detection devicesAnnually, when the trip test is conducted13.4.4.1.2
☐ Strainers, filters, restricted orifices and diaphragm chambersInternal inspection every 5 years unless tests indicate a greater frequency13.4.4.1.3

Trip and flow tests

CheckCriterionClause
☐ Scope of flow testsFull functionality of the system as a unit, including automatic and manual activation13.4.4.2.1
☐ Devices or equipment subject to damage by dischargeProtected during flow tests13.4.4.2.2
☐ Annual full flow trip testEach deluge valve annually at full flow, in warm weather, per the manufacturer’s instructions13.4.4.2.3
☐ Water cannot be discharged for test purposesAnnual trip test may be done without discharge in the protected area13.4.4.2.3.1
☐ Water cannot be discharged unless protected equipment is shut down (e.g., energized electrical equipment)Full flow test at the next scheduled shutdown13.4.4.2.3.2
☐ Full flow tests per 13.4.4.2.3.2Frequency not to exceed 3 years13.4.4.2.3.3
☐ Open spray nozzles or sprinklersDuring the annual full flow test, discharge patterns observed: no plugged nozzles, nozzles correctly positioned, obstructions do not prevent wetting of protected surfaces13.4.4.2.4
☐ Where water cannot be dischargedNozzles or open sprinklers inspected for correct orientation13.4.4.2.4.1
☐ Where discharge requires equipment shutdownAll nozzles and open sprinklers inspected per 13.4.4.2.4 during the full flow test at the next scheduled shutdown13.4.4.2.4.2
☐ Misalignment or obstructionsPiping and nozzles adjusted and/or cleaned and the system retested13.4.4.2.4.3
☐ Full flow tests (13.4.4.2.3 and 13.4.4.2.3.2)Conducted with the deluge system control valve fully open13.4.4.2.5
☐ Trip tests per 13.4.4.2.3.1May be conducted with the control valve partially open13.4.4.2.6
☐ Maximum number of systems expected to operate in a fireTested simultaneously to inspect the adequacy of the water supply13.4.4.2.8
☐ Manual actuation devicesOperated annually13.4.4.2.9
☐ After the annual trip testSystem returned to service per the manufacturer’s instructions13.4.4.2.10
☐ Valve seating surfacesNo grease or other sealing materials applied13.4.4.2.11
☐ Trip recordsDate last tripped, tripping time, and the individual and organization conducting the test, readily available to the AHJ13.4.4.2.12

Pressure readings

CheckCriterionClause
☐ Hydraulically most remote nozzle or sprinklerPressure reading recorded13.4.4.2.7.1
☐ Deluge valveSecond pressure reading recorded13.4.4.2.7.2
☐ EvaluationReadings compared to hydraulic design pressures to confirm the water supply meets the original design requirements13.4.4.2.7.3
☐ Most remote nozzle or sprinkler inaccessibleExcept in foam-water sprinkler systems, visual inspection without a remote pressure reading is permitted13.4.4.2.7.4
☐ Riser reading shows the water supply has deterioratedA gauge is placed on the most remote nozzle or sprinkler and results compared with the required design pressure13.4.4.2.7.5

Supervisory devices and maintenance

CheckCriterionClause
☐ Low air pressure supervisory devices on the detection system (if provided)Tested quarterly per the manufacturer’s instructions13.4.4.2.13
☐ Solenoid supervisory signal device monitoring coil positionTested quarterly13.4.4.2.14
☐ Low-temperature alarms in valve enclosures (if installed)Annually, toward the beginning of the heating season before freezing conditions13.4.4.2.15
☐ Automatic air pressure maintenance devices on the detection system (if provided)Annually at the time of the annual trip test13.4.4.2.16
☐ Leaks and electrical malfunctions causing alarmsLocated and repaired13.4.4.3.1
☐ During the annual trip testValve interior cleaned thoroughly; internal and external trim parts replaced or repaired as necessary13.4.4.3.2, 13.4.4.3.2.1
☐ Valves that can be reset without removing a faceplateInterior cleaning permitted every 5 years13.4.4.3.2.2
☐ Auxiliary drainsOperated after each system operation, toward the beginning of the heating season before freezing, and thereafter as needed13.4.4.3.3
☐ Additional maintenanceAs required by the manufacturer’s instructions13.4.4.3.4

J. Dry pipe valves and quick-opening devices

Inspection

CheckCriterionClause
☐ Systems with auxiliary drainsSign at the dry valve showing the number of auxiliary drains and the location of each13.4.5.1.1
☐ ValveMonthly: free of physical damage13.4.5.1.2(1)
☐ Trim valvesMonthly: in the appropriate open or closed position13.4.5.1.2(2)
☐ Valve between the riser and the quick-opening device (where applicable)Sealed, locked or electrically supervised in the open position13.4.5.1.2(3)
☐ Intermediate chamberNot leaking13.4.5.1.2(4)
☐ Valve in the connection to pressure-type contactors or water motor–operated alarms (where applicable)Sealed, locked or electrically supervised in the open position13.4.5.1.2(5)
☐ Valve interiorAnnually, when the trip test is conducted13.4.5.1.3
☐ Strainers, filters and restricted orificesInternal inspection every 5 years unless tests indicate a greater frequency13.4.5.1.4

Testing

CheckCriterionClause
☐ Priming water levelTested quarterly13.4.5.2.1
☐ Trip testEach dry pipe valve annually, during warm weather13.4.5.2.2
☐ Valves protecting freezersTrip tested without introducing moisture into the freezer piping13.4.5.2.2.1
☐ Full flow trip testEvery 3 years and whenever the system is altered; control valve fully open and quick-opening device (if provided) in service13.4.5.2.2.2
☐ Years without full flow testingTrip test with the control valve partially open13.4.5.2.2.3
☐ Refilling a dry systemAir supply able to restore normal air pressure within 30 minutes13.4.5.2.2.4
☐ Refrigerated spaces maintained below 5 °F (−15 °C)Normal air pressure may be restored within 60 minutes13.4.5.2.2.5
☐ Valve seating surfacesNo grease or other sealing materials applied13.4.5.2.3
☐ Quick-opening devices (if provided)Tested quarterly13.4.5.2.4
☐ Tag or card attached to the valveDate last tripped and the name of the person and organization conducting the test13.4.5.2.5
☐ Separate records kept on the premisesInitial air and water pressure, tripping air pressure and valve operating conditions, for comparison with previous tests13.4.5.2.5.1
☐ Records for full flow trip testsValve tripping time and water transit time to the inspector’s test connection13.4.5.2.5.2
☐ Low and high air pressure alarms (if provided)Annually, per the manufacturer’s instructions13.4.5.2.6
☐ Low-temperature alarms in valve enclosures (if installed)Annually, at the beginning of the heating season13.4.5.2.7
☐ Automatic air pressure maintenance devices (if provided)Annually during the trip test, per the manufacturer’s instructions13.4.5.2.8
☐ Gas leakage test (every 3 years), method 1Gas (air or nitrogen) pressure test at 40 psi for 2 hours; loss of up to 3 psi (0.2 bar) permitted, more than that and leaks are addressed13.4.5.2.9(1)
☐ Gas leakage test, method 2At normal system pressure, shut off the gas source (nitrogen supply, compressor or shop air) for 4 hours; if the low pressure alarm operates, leaks are addressed13.4.5.2.9(2)
☐ Systems using nitrogen for an increased C value per NFPA 13Nitrogen supply tested semiannually; concentration 98 percent or greater13.4.5.2.10
☐ Nitrogen concentration monitored at a constantly attended locationConcentration verified annually13.4.5.2.10.1
☐ Nitrogen concentration below 98 percentCause identified and corrected13.4.5.2.10.2

Maintenance

CheckCriterionClause
☐ During the annual trip testValve interior cleaned thoroughly; internal and external trim parts replaced or repaired as necessary13.4.5.3.1, 13.4.5.3.1.1
☐ Quick-opening devicesMaintained in working order per the manufacturer’s requirements13.4.5.3.2
☐ Auxiliary drainsDrained after each system operation, toward the beginning of the heating season before freezing, and thereafter as needed13.4.5.3.3

K. Pressure-regulating devices

Pressure-reducing valves

CheckCriterionClause
☐ All pressure-reducing valvesQuarterly: in the open position; not leaking; maintaining downstream pressures per the design criteria; handwheels installed and unbroken13.5.1.1
☐ Each control valveOperated annually through its full range and returned to its normal position13.5.1.2
☐ Partial flow testAnnually, adequate to move the valve from its seat13.5.1.3
☐ Full flow testEach valve at 5-year intervals; compared to previous results13.5.1.4
☐ Valve adjustmentsPer the manufacturer’s instructions13.5.1.4.1

Hose connection pressure-regulating devices

CheckCriterionClause
☐ Pressure-reducing hose valvesAnnually: handwheel not broken or missing; outlet hose threads undamaged; no leaks; hose adapter and cap not missing13.5.2.1
☐ Each pressure-reducing hose valveOperated annually through its full range and returned to its normal position13.5.2.2
☐ Flow test at maximum flow rateEach device at 5-year intervals13.5.2.3
☐ Flow test resultsCompared to previous test results13.5.2.3.1
☐ Valve adjustmentsPer the manufacturer’s instructions13.5.2.3.2
☐ Tag attached to the valveTest date, flow in gpm (L/min), static and residual inlet pressures, and residual outlet pressure recorded during the test13.5.2.4
☐ Pressure-reducing hose valve with hose rack assembly: rackInspected and tested per NFPA 193013.5.3.1
☐ Pressure-reducing hose valve with hose rack assembly: valveInspected and tested per 13.5.213.5.3.2

Master pressure-reducing valves

CheckCriterionClause
☐ Weekly inspectionNormal downstream and supply pressures maintained; devices and trim free of physical damage and not leaking13.5.4.1
☐ Partial flow testQuarterly, adequate to move the valve from its seat13.5.4.2
☐ Flow testEach valve annually at maximum and minimum anticipated flow rates13.5.4.3
☐ Pressure-reducing valves in seriesDownstream valve tested both at the discharge pressure of the upstream valve and with the upstream valve bypass open13.5.4.3.1
☐ Flow test resultsCompared to previous test results13.5.4.3.2
☐ Valve adjustmentsPer the manufacturer’s instructions13.5.4.4
☐ Damaged or missing components noted during inspectionsRepaired or replaced per the manufacturer’s instructions13.5.5

L. Hose valves and hose connections

Hose valves are inspected quarterly (13.6.1.1). Test frequency depends on the standpipe class; the standpipe system itself is covered in the series’ Chapter 6 article.

CheckCriterionClause
☐ Hose connection thread protectionIn place13.6.1.1(1)
☐ Hose connection caps not rated for pressureHave an opening of at least 1/8 in. in diameter13.6.1.1(2)
☐ Hose threadsNot damaged13.6.1.1(3)
☐ Valve handlesPresent and not damaged13.6.1.1(4)
☐ GasketsNot damaged or showing signs of deterioration13.6.1.1(5)
☐ LeaksNone present13.6.1.1(6)
☐ ValveNot obstructed and capable of normal operation13.6.1.1(7)
☐ Restricting devicesPresent where required13.6.1.2
☐ Removal of existing restricting devicesPermitted where approved by the AHJ, and not recorded as a deficiency13.6.1.3
☐ Class I and Class III standpipe hose valvesTested annually by fully opening and closing13.6.2.1
☐ Class I and III hose valves difficult to operate or leakingRepaired or replaced13.6.2.1.1
☐ Hose valves on hose stations attached to sprinkler systems and Class II standpipesTested every 3 years by opening and closing13.6.2.2
☐ Those that are difficult to operate or leakRepaired or replaced13.6.2.2.1
☐ Hose valves that do not operate smoothly or open fullyLubricated, repaired or replaced13.6.3

M. Backflow prevention assemblies

CheckCriterionClause
☐ Reduced-pressure (RP) and reduced-pressure detector (RPDA) assembliesWeekly: differential-sensing valve relief port not continuously discharging13.7.1.1
☐ After any testing or repairOwner or designated representative verifies the system is in service and all isolation valves are normally open and properly locked or electrically supervised13.7.1.2
☐ Internal inspectionEvery 5 years; all components operate correctly, move freely and are in good condition13.7.1.3
☐ Forward flow testAll backflow preventers in fire protection piping exercised annually at a minimum flow rate of the system demand13.7.2.1
☐ Water rationing during shortages lasting more than 1 yearInternal inspection verifying the check valves will fully open is permitted in lieu of the annual forward flow test13.7.2.1.1
☐ Annual fire pump testing flows the system flow rate through the backflow preventerSeparate forward flow test not required13.7.2.1.2
☐ Hydrants or inside hose stations downstreamForward flow test includes hose stream demand13.7.2.2
☐ Connections do not permit verification at system demandTest at the maximum flow rate possible13.7.2.3
☐ MaintenanceBy qualified personnel per the manufacturer’s instructions and the AHJ’s procedures and policies13.7.3

N. Fire department connections

Fire department connections are inspected quarterly to verify the following (13.8.1):

CheckCriterionClause
☐ Visibility and accessConnection visible and accessible13.8.1(1)
☐ Couplings or swivelsNot damaged and rotate smoothly13.8.1(2)
☐ Plugs or capsIn place and undamaged13.8.1(3)
☐ GasketsIn place13.8.1(4)
☐ Identification signsIn place13.8.1(5)
☐ Check valveNot leaking13.8.1(6)
☐ Automatic drain valveIn place and operating properly13.8.1(7)
☐ FDC clapper(s)In place and operating properly13.8.1(8)
☐ Interior of the connectionInspected for obstructions13.8.1(9)
☐ Visible piping supplying the FDCUndamaged13.8.1(10)
☐ Connections with approved locking caps or plugsInterior inspection annually13.8.2
☐ ComponentsRepaired or replaced as necessary per the manufacturer’s instructions13.8.3
☐ Obstructions foundRemoved13.8.4
☐ Piping from the FDC to the fire department check valveHydrostatic test at 150 psi (10 bar) for 2 hours at least once every 5 years13.8.5
☐ Acceptable resultPressure loss less than 5 psi (0.3 bar) and no visual signs of leakage13.8.5.1
☐ Piping 10 ft (3.0 m) or less that can be visually inspected internally and externally5-year hydrostatic test not required13.8.5.2
☐ Check valvesInternally inspected per 13.4.2.113.8.6

O. Detection, compressors, corrosion inhibition and air vents

CheckCriterionClause
☐ Automatic detection equipment not covered by NFPA 72Detectors in place, securely fastened and protected from corrosion, weather and mechanical damage; communication wiring, control panels or pneumatic tubing functional13.9.2
☐ Air compressors and nitrogen generators dedicated to water-based systemsInspected, tested and maintained per 13.10.2, 13.10.3 and 13.10.413.10.1.1
☐ Air compressors not dedicated to water-based systemsInspected, tested and maintained per the manufacturer’s instructions13.10.1.2
☐ Monthly inspection: unitCompressor or nitrogen generator free of physical damage13.10.2(1)
☐ Monthly inspection: power wiringPower wiring to the compressor intact and free of physical damage13.10.2(2)
☐ Monthly inspection: pipingPiping from the unit to the fire protection system intact and free of physical damage13.10.2(3)
☐ Monthly inspection: anchoringAnchoring to the structure or system piping secure, tight and free of damage13.10.2(4)
☐ Monthly inspection: oilCompressors requiring oil have the required amount in the reservoir13.10.2(5)
☐ Monthly inspection: corrosion-inhibiting equipmentIntact and free of physical damage13.10.2(6)
☐ Annual testUnit operates on the proper drop of system air pressure; restores normal supervisory pressure in the required time frame; compressor does not overheat while running13.10.3
☐ MaintenancePer the manufacturer’s instructions13.10.4.1
☐ Compressors requiring oilOil replaced annually unless the manufacturer requires more frequent replacement13.10.4.2
☐ Corrosion-inhibiting equipmentInspection: intact and undamaged; testing: per the manufacturer’s instructions; maintenance: where required for corrosion mitigation, per the manufacturer’s instructions13.11.1–13.11.3
☐ Automatic air ventsAnnually from the floor level: free of physical damage, no signs of leakage13.12
☐ Air vent strainers, filters and screensRemoved and inspected every 5 years for damaged or corroded parts; when removed, flushed until clear or replaced13.12.1, 13.12.2

P. When a component is adjusted, repaired or replaced: Table 13.13.1

Whenever a valve, valve component and/or valve trim is adjusted, repaired, reconditioned or replaced, the action in Table 13.13.1 is performed (13.13.1). Where the original installation standard differs from the cited one, the appropriate installing standard may be used (13.13.2). These actions do not require a design review (13.13.3).

ComponentAdjustRepair/reconditionReplaceInspection, test and maintenance procedure
Water delivery components
Post indicator and wall indicator valvesXXX(1) Inspect for leaks at system pressure; (2) Full operational test conforming to 13.3.3.1; (3) Spring torsion inspection conforming to 13.3.3.2; (4) Verify target visibility at shut and full open position; (5) Test supervisory device; (6) Valve status test
Control valves other than post indicator and wall indicator valvesXXX(1) Inspect for leaks at system pressure; (2) Full operational test conforming to 13.3.3.1; (3) Back one-quarter turn from fully open to prevent jamming per 13.3.3.3; (4) Verify supervisory device; (5) Valve status test
Alarm check valveXXX(1) Inspect for leaks at system pressure per 13.4.1; (2) Test all alarms and supervisory signals affected by the alarm valve; (3) Valve status test
Dry pipe valveXXX(1) Inspect for leaks at system pressure; (2) Trip test per 13.4.5.2; (3) Inspect condition of valve seat; (4) Test all dry pipe system alarms and supervisory signals; (5) Valve status test
Deluge/preaction valveXXX(1) Inspect for leaks at system pressure per 13.4.4/13.4.3; (2) Trip test; (3) Inspect condition of valve seat; (4) Test all deluge/preaction system alarms and supervisory signals; (5) Valve status test
Quick-opening deviceXXX(1) Inspect for leaks at system pressure per 13.4.5.2.9; (2) Trip test; (3) Valve status test
Pressure-regulating device: hose valvesXXX(1) Inspect for leaks at system pressure per 13.5.2; (2) Full flow test; (3) Valve status test
Pressure-regulating devices: other than hose valvesXXX(1) Inspect for leaks at system pressure per Section 13.5; (2) Test pressure setting with full flow and without flow; (3) Test supervisory device and alarm; (4) Valve status test
Hose valveXXX(1) Inspect for leaks at system pressure per Section 13.6; (2) Valve status test
Backflow prevention deviceXXX(1) Inspect for leaks at system pressure per Section 13.7; (2) Forward flow test per 13.7.2.1; (3) Test supervisory device and alarm; (4) Valve status test
Check valvesXXX(1) Inspect for leaks at system pressure per 13.4.2; (2) Inspect for leaking through check valve; (3) Valve status test
Fire department connectionXX—(1) Inspect for leaks at system pressure per Section 13.8; (2) Valve status test
Fire department connection: sprinkler system(s)——X(1) Isolate and hydrostatic test for 2 hours at 150 psi (10 bar); (2) Valve status test
Fire department connection: other than sprinkler system(s)——X(1) Isolate and hydrostatic test for 2 hours at 50 psi (3.5 bar) above the normal working pressure [200 psi (14 bar) minimum]; (2) Valve status test
StrainersXXXInspect and clean in accordance with manufacturer’s instructions
Main drain valvesXXXMain drain test per 13.2.2
Gauges——XCalibrate per 13.2.4
Alarm and supervisory components
Alarm deviceXXXTest for conformance with NFPA 13 and/or NFPA 72
Supervisory deviceXXXTest for conformance with NFPA 13 and/or NFPA 72
System protection components
Pressure relief valve: fire pump installationXXXSee 8.3.3.11 and 13.5.6
Pressure relief valve: other than fire pump installation——XVerify relief valve is listed or approved for the application and set to the correct pressure
Informational components
Identification signsXXXInspect for compliance with NFPA 13 and 13.3.1

Note: for the fire pump relief valve the table cites 8.3.3.11 together with 13.5.6; the Chapter 13 text of NFPA 25-2026 ends at 13.5.5. Fire pump relief valve tasks are covered in the series’ Chapter 8 article.

Frequently Asked Questions

How often are control valves inspected under NFPA 25?

All valves are inspected weekly; valves locked or supervised per the applicable NFPA standards may be inspected monthly and electrically supervised valves quarterly (13.3.2.1). Every control valve is also operated through its full range annually (13.3.3.1), and valve supervisory switches are tested semiannually (13.3.3.5.1).

When is the main drain test done and how is it judged?

Annually at each water supply lead-in to a building water-based system (13.2.2). Where the sole supply passes through a backflow preventer and/or pressure-reducing valves, at least one downstream system is tested quarterly (13.2.2.2). A 10 percent reduction in full flow pressure versus the acceptance test or previous tests must be explained and corrected if necessary (13.2.2.3).

How are waterflow alarm devices tested?

Mechanical alarms (including water motor gongs) are tested quarterly and must sound within 5 minutes (13.2.3.1). Vane, paddle and pressure-switch devices are tested semiannually and must activate within 90 seconds at the flow of one smallest-orifice sprinkler (13.2.3.2). On wet systems the test uses the inspector’s test connection or automated test equipment; blocking the vane or stem to disable a device is prohibited (13.2.3.3, 13.2.3.7.1.1).

How often is a dry pipe valve trip tested?

Every year in warm weather (13.4.5.2.2). Every 3 years and whenever the system is altered the test is done with the control valve fully open and the quick-opening device in service; in other years with the control valve partially open (13.4.5.2.2.2, 13.4.5.2.2.3). On refill the air supply must restore normal pressure within 30 minutes, or 60 minutes in refrigerated spaces below 5 °F (−15 °C) (13.4.5.2.2.4, 13.4.5.2.2.5).

What inspections and tests apply to a fire department connection?

A quarterly ten-point inspection: visibility and access, couplings, caps, gaskets, signs, check valve, automatic drain, clapper, interior obstructions and visible piping (13.8.1). Piping from the connection to the fire department check valve is hydrostatically tested at 150 psi (10 bar) for 2 hours at least every 5 years, with a loss under 5 psi (0.3 bar) (13.8.5, 13.8.5.1). The test is not required where that piping is 10 ft (3.0 m) or less and can be visually inspected inside and out (13.8.5.2).

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Standards & References

NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 13 (13.1–13.13), Table 13.1.1.2 and Table 13.13.1. The content of Chapters 4, 8 and 15 and of NFPA 13, NFPA 72 and NFPA 1930 referenced by Chapter 13 is not reproduced here.