This article in the NFPA 25 series covers Chapter 10: water spray fixed systems. The sprinkler system article dealt with closed-sprinkler systems; this one covers fixed nozzle water spray systems installed to NFPA 15: pipe and hangers, open and automatic nozzles, the spare nozzle stock, strainers, drainage, the operational test, response time, discharge patterns, pressure readings, return to service and ultra-high-speed water spray systems (UHSWSS). The deluge valve and other valves are sent to Chapter 13, the fire pump to Chapter 8 and tanks to Chapter 9. Every line carries its clause or table number from NFPA 25-2026.
In short: Piping, fittings, hangers and nozzles are inspected annually and after each system activation (Table 10.1.1.2). Drainage beneath and around the system is checked visually every quarter (10.2.7). Mainline strainers are flushed until clear after each operation or flow test and removed and inspected every 5 years (10.2.6.1, 10.2.1.7). In the operational test, heat detection must operate within 40 seconds, response and discharge times are recorded, and pressures are read at the most remote nozzle and at the deluge valve (10.3.3). Manual actuation devices are operated annually (10.3.5). Inaccessible areas are inspected at each scheduled shutdown but not more than every 18 months (10.2.1.1). UHSWSS response time does not exceed 100 milliseconds (10.4.5.2).
A. Scope and general rules
Chapter 10 gives the minimum requirements for routine inspection, testing and maintenance of water spray protection from fixed nozzle systems installed to NFPA 15 or another approved installation standard (10.1.1.1). Minimum frequencies come from Table 10.1.1.2 (10.1.1.2).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Out of scope | Water spray protection from portable nozzles, sprinkler systems, monitor nozzles or other means of application | 10.1.2 |
| ☐ Design, installation and acceptance testing | NFPA 15 is consulted | 10.1.3 |
| ☐ Obstruction investigation needed | Follow the procedures of Chapter 14 | 10.1.4 |
| ☐ Common components and valves | Inspected, tested and maintained per Chapter 13 | 10.1.5 |
| ☐ Impairment to protection | Follow the impairment procedures of Chapter 15 | 10.1.6 |
| ☐ System or any portion out of service for any reason | Notice given to facility management, the local fire department, the on-site fire brigade and other AHJs as applicable | 10.1.6.1 |
| ☐ Marking the out-of-service portion | A sign posted at each fire department connection or system control valve showing which portion is out of service | 10.1.6.2 |
The explanatory material of Annex A.10.1 notes that the effectiveness of these systems depends on maintaining the integrity of hydraulic characteristics, water control valves, deluge valves and their detection/actuation systems and pipe hangers, and on preventing obstructions to nozzle discharge patterns; they are most commonly used to protect processing equipment and structures, flammable liquid and gas vessels, piping, and equipment such as transformers, oil switches and motors. Per Annex A.10.1.3, insulation acting in lieu of water spray protection is to keep temperatures from exceeding 850 °F (454 °C) for structural members and 650 °F for vessels; if the insulation is missing, the structure or vessel is not considered protected, and the insulation should be replaced or the water spray protection extended at the appropriate density. These are explanatory notes, not mandatory requirements.
B. Frequency summary: Table 10.1.1.2
The standard’s summary table is reproduced below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the reference in the right-hand column (mostly Chapters 13, 8, 9 or NFPA 72). The reference cell for the mainline strainer inspection row is blank ("—") in the table; the mainline strainer provisions are in 10.2.1.7 and 10.2.6.
| Item | Frequency | Reference |
|---|---|---|
| Inspection | ||
| Backflow preventer | — | Chapter 13 |
| Check valves | — | Chapter 13 |
| Control valves | — | Chapter 13 |
| Deluge valve | — | Chapter 13 |
| Detection systems and components | — | NFPA 72 |
| Detector check valves | — | Chapter 13 |
| Drainage | Quarterly | 10.2.7 |
| Fire pump system | — | Chapter 8 |
| Fittings | Annually | 10.2.3, 10.2.3.1 |
| Fittings (rubber-gasketed) | Annually and after each system activation | 10.2.3.1 |
| Gravity tanks | — | Chapter 9 |
| Hangers, braces, and supports | Annually and after each system activation | 10.2.3.2 |
| Heat (deluge valve house) | — | Chapter 13 |
| Nozzles | Annually and after each system activation | 10.2.4 |
| Piping | Annually and after each system activation | 10.2.3.1 |
| Pressure tank | — | Chapter 9 |
| Strainers: mainline | Annually and after each system activation | — |
| Strainers: others | Per manufacturer’s instruction | 10.2.6 |
| Suction tanks | — | Chapter 9 |
| Water supply piping | — | 10.2.5.2 |
| UHSWSS — controllers | Start of each shift | 10.4.3 |
| UHSWSS — detectors | Monthly | 10.4.2 |
| UHSWSS — valves | Start of each shift | 10.4.4 |
| Operational test | ||
| Backflow preventer | — | Chapter 13 |
| Check valves | — | Chapter 13 |
| Control valves | — | Chapter 13 |
| Deluge valve | — | Chapter 13 |
| Detection systems | — | NFPA 72 |
| Detector check valve | — | Chapter 13 |
| Fire pump system | — | Chapter 8 |
| Gravity tanks | — | Chapter 9 |
| Main drain test | — | Chapter 13 |
| Manual release | Annually | 10.3.5 |
| Nozzles | Annually | Section 10.3 |
| Pressure tank | — | Chapter 9 |
| Strainers | Annually | 10.2.6 |
| Suction tanks | — | Chapter 9 |
| Waterflow alarm | — | Chapter 13 |
| Water spray system test | — | Chapter 13 |
| Water supply flow test | — | Chapter 7 |
| UHSWSS | Annually | Section 10.4 |
| UHSWSS — detectors | Monthly | 10.4.2 |
| Valve status test | — | Chapter 13 |
| Maintenance | ||
| Backflow preventer | — | Chapter 13 |
| Check valves | — | Chapter 13 |
| Control valves | — | Chapter 13 |
| Deluge valve | — | Chapter 13 |
| Deluge valve enclosures | — | Chapter 4 |
| Detection systems | — | NFPA 72 |
| Detector check valve | — | Chapter 13 |
| Fire pump system | — | Chapter 8 |
| Gravity tanks | — | 10.2.9, Chapter 9 |
| Pressure tank | — | 10.2.9, Chapter 9 |
| Strainers | Annually | 10.2.1.4, 10.2.1.6, 10.2.6 |
| Strainers (baskets/screen) | 5 years | 10.2.1.4, 10.2.1.7, A.10.2.6 |
| Suction tanks | — | Chapter 9 |
| Water spray nozzles | Annually | 10.2.4 |
C. General rules for inspection and maintenance
| Check | Criterion | Clause |
|---|---|---|
| ☐ Components | Inspected and maintained at the frequency in Table 10.1.1.2, per this standard and the manufacturer’s instructions | 10.2.1 |
| ☐ Items in areas inaccessible for safety reasons, such as continuous process operations or energized electrical equipment | Inspected during each scheduled shutdown but not more than every 18 months | 10.2.1.1 |
| ☐ Items in areas with no provision for access and not subject to the conditions in 10.2.3.1, 10.2.3.2 and 10.2.4.1 | No inspection required | 10.2.1.2 |
| ☐ Testing of items in areas inaccessible for safety reasons | At longer intervals per 13.4.4.2.3.2 | 10.2.1.3 |
| ☐ Other maintenance intervals | Permitted depending on the results of visual inspection and operating tests | 10.2.1.4 |
| ☐ Deluge valve enclosures | Inspected per Chapter 13 | 10.2.1.5 |
| ☐ Deluge valves | Inspected, tested and maintained per Chapter 13 | 10.2.2 |
D. Piping, fittings, hangers and supports
System piping, fittings, hangers and supports are inspected and maintained to ensure continuity of water delivery to the spray nozzles at full waterflow and design pressure (10.2.3).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Piping and fittings: mechanical damage | No broken piping or cracked fittings | 10.2.3.1(1) |
| ☐ Piping and fittings: external conditions | No missing or damaged paint or coatings, rust or corrosion | 10.2.3.1(2) |
| ☐ Piping and fittings: alignment | No misalignment or trapped sections | 10.2.3.1(3) |
| ☐ Low-point drains (automatic or manual) | Condition inspected | 10.2.3.1(4) |
| ☐ Rubber-gasketed fittings | Protection inspected | 10.2.3.1(5) |
| ☐ Hangers, braces and supports: condition | Missing or damaged paint or coating, rust and corrosion; repaired or replaced as necessary | 10.2.3.2(1) |
| ☐ Hangers, braces and supports: attachment | Secure attachment to structural supports and piping; repaired or replaced as necessary | 10.2.3.2(2) |
| ☐ Damaged or missing hangers, braces and supports | Repaired or replaced | 10.2.3.2(3) |
Annex A notes: the pipe should not be used to support ladders, stock or other material, a corrosion-resistant coating should be provided and maintained in corrosive atmospheres, an internal examination should be made where age or service conditions warrant, and flushing should be done by sprinkler contractors or other qualified workers (Annex A.10.2.3). Rubber-gasketed fittings in fire areas are inspected to determine whether they are protected by the water spray or other approved means; unprotected, fire could cause loss of the gasket followed by excessive leakage (Annex A.10.2.3.1). Hangers restrain the piping against severe movement when water flows and provide slope for drainage after shutdown; broken or loose hangers should be replaced or refastened (Annex A.10.2.3.2).
E. Nozzles
| Check | Criterion | Clause |
|---|---|---|
| ☐ Open water spray nozzles | In place, still aimed in the intended direction, free from external loading and corrosion | 10.2.4.1 |
| ☐ Where caps or plugs are required | Confirmed in place and free to operate as intended | 10.2.4.1.1 |
| ☐ Misaligned open nozzles | Adjusted (aimed) by visual means; discharge patterns inspected at the next scheduled flow test | 10.2.4.1.2 |
| ☐ Automatic water spray nozzles and pilot sprinklers | Inspected per the sprinkler requirements of 5.2.1.1 and 5.2.1.1.1 | 10.2.4.2 |
| ☐ Misaligned automatic water spray nozzles | Adjusted (aimed) by visual means | 10.2.4.2.1 |
The content of 5.2.1.1 and 5.2.1.1.1 (annual inspection from the floor and the defects that require replacement) is covered in the series’ sprinkler article. The explanatory material of Annex A.10.2.4 lists four factors affecting nozzle placement: changes or additions in the protected area that obstruct nozzles or require more coverage; removal of equipment leaving nozzles excessively far from the hazard; mechanical damage or previous flow tests that misdirected nozzles; and a change in the hazard requiring more or different nozzles. It also notes that nozzles should be positioned so the spray does not miss the targeted surface.
F. Stock of spare automatic nozzles and pilot sprinklers
| Check | Criterion | Clause |
|---|---|---|
| ☐ Spare stock on the premises | Kept for promptly replacing automatic nozzles or pilot sprinklers that have operated or been damaged in any way | 10.2.4.3.1 |
| ☐ Stock types | Correspond to the types and temperature ratings of those on the property | 10.2.4.3.2 |
| ☐ Replacement characteristics | Proper characteristics for the application | 10.2.4.3.3 |
| ☐ Replacements used | Only new | 10.2.4.3.4 |
| ☐ Storage cabinet | Ambient storage temperature not exceeding 100 °F (38 °C) | 10.2.4.3.5 |
| ☐ Wrench | Where required by the manufacturer, a wrench designed for the purpose is provided | 10.2.4.3.6 |
| ☐ Minimum content | At least one of each type of automatic nozzle and pilot sprinkler on the property | 10.2.4.3.7 |
| ☐ Fewer than 300 automatic nozzles or pilot sprinklers on the property | No fewer than 6 in total | 10.2.4.3.7(1) |
| ☐ 300 to 1000 automatic nozzles or pilot sprinklers | No fewer than 12 in total | 10.2.4.3.7(2) |
| ☐ Over 1000 automatic nozzles or pilot sprinklers | No fewer than 24 in total | 10.2.4.3.7(3) |
Per Annex A.10.2.4.3.3, proper characteristics include, but are not limited to, style, K-factor, spray pattern, temperature rating and coating, as applicable.
G. Water supply, strainers, drainage, pumps and tanks
| Check | Criterion | Clause |
|---|---|---|
| ☐ Dependability of the water supply | Ensured by regular inspection and maintenance, whether from a municipal source, on-site storage tanks, a fire pump or private underground piping | 10.2.5.1 |
| ☐ Water supply piping | Maintained free of internal obstructions | 10.2.5.2 |
| ☐ Mainline strainers (basket or screen) | Flushed until clear after each operation or flow test | 10.2.6.1 |
| ☐ Mainline strainers | Removed and inspected every 5 years for damaged and corroded parts | 10.2.1.7 |
| ☐ Individual nozzle strainers | Removed, cleaned and inspected after each operation or flow test | 10.2.6.2 |
| ☐ Nozzle strainers and mainline flushing | Removed, inspected and cleaned during the flushing procedure for the mainline strainer | 10.2.1.6 |
| ☐ All strainers | Inspected and cleaned per the manufacturer’s instructions | 10.2.6.3 |
| ☐ Damaged or corroded strainer parts | Replaced or repaired | 10.2.6.4 |
| ☐ Area beneath and surrounding the system: drainage | Visually every quarter: trap sumps and drainage trenches not blocked; retention embankments or dikes in good repair | 10.2.7 |
| ☐ Fire pumps | Inspection and maintenance per Chapter 8 | 10.2.8 |
| ☐ Water tanks (gravity, pressure or suction tanks, or reservoirs) | Inspection and maintenance per Chapter 9 | 10.2.9 |
The explanatory material of Annex A.10.2.5.2 notes that internal obstructions in water supply piping can be caused by debris (rocks, mud, tubercles) or by closed or partially closed control valves. Annex A.10.2.6 restates that mainline strainers should be removed and inspected every 5 years.
H. Operational test: preparation and performance
| Check | Criterion | Clause |
|---|---|---|
| ☐ Test frequency | Per Table 10.1.1.2 | 10.3.1.1 |
| ☐ System servicing | Per this standard and the manufacturer’s instructions | 10.3.1.2 |
| ☐ Test preparation | Precautions taken to prevent damage to property during the test | 10.3.2 |
| ☐ Purpose of the operational test | The system responds as designed, both automatically and manually | 10.3.3 |
| ☐ Response time of heat detection systems | Operate within 40 seconds when exposed to a heat test source under test conditions | 10.3.3.1.1 |
| ☐ Response time of flammable gas detection | Operates within the time specified in the system design when exposed to a standard test gas concentration | 10.3.3.1.2 |
| ☐ Recording response times | Times of 10.3.3.1.1 and 10.3.3.1.2 recorded | 10.3.3.1.3 |
| ☐ Discharge time | Time lapse between operation of detection and water delivery to the protected area recorded | 10.3.3.2 |
| ☐ Discharge patterns | Patterns of all open nozzles observed: not impeded by plugged nozzles, nozzles correctly positioned, obstructions not preventing wetting of protected surfaces | 10.3.3.3.1 |
| ☐ Where water cannot be discharged because of the protected property | Nozzles inspected for proper orientation; system tested with air to confirm nozzles are not obstructed | 10.3.3.3.1.1 |
| ☐ Where obstructions occur | Piping and nozzles cleaned and the system retested | 10.3.3.3.2 |
The explanatory material of Annex A.10.3.2 recommends that the owner prevent damage to equipment or the structure from system discharge or runoff, verify adequate and unobstructed drainage, remove or cover equipment as necessary, and use means such as curbing or sandbagging to keep water out. Per Annex A.10.3.3.1, detection circuits deliberately desensitized to override unusual ambient conditions may exceed the response time of 10.3.3.1; one method of testing heat detection uses a radiant heat surface at 300 °F (149 °C) with a capacity of 350 watts at a distance of 1 in. (25 mm) but not more than 2 in. (50 mm) from the nearest part of the detector, and this electric test set method should not be used in hazardous locations. Annex A.10.3.3.3 notes that spray nozzles come in different sizes and types, some more subject to internal obstruction than others.
I. Pressure readings, multiple systems and manual operation
| Check | Criterion | Clause |
|---|---|---|
| ☐ Hydraulically most remote nozzle | Pressure recorded to ensure flow is not impeded by partially closed valves or plugged strainers or piping | 10.3.3.4.1 |
| ☐ Deluge valve | A second pressure reading recorded to ensure the water supply is adequate | 10.3.3.4.2 |
| ☐ Evaluating the readings | Compared to the hydraulic design pressures to confirm the original design and water supply requirements are met | 10.3.3.4.3 |
| ☐ Most remote nozzle inaccessible | Nozzles may be checked visually without a pressure reading at that nozzle | 10.3.3.4.3.1 |
| ☐ Riser reading shows the water supply has deteriorated | A gauge is placed on the hydraulically most remote nozzle and results compared with the required design pressure | 10.3.3.4.3.2 |
| ☐ Multiple systems | The maximum number of systems expected to operate in a fire tested simultaneously to check water supply adequacy | 10.3.4 |
| ☐ Manual actuation devices | Operated annually | 10.3.5 |
J. Return to service and testing of automatic nozzles
| Check | Criterion | Clause |
|---|---|---|
| ☐ After the full flow test | System maintained and returned to service per the manufacturer’s instructions | 10.3.6 |
| ☐ All low-point drains in aboveground piping | Opened, pipe drained, valves closed and plugs replaced to prevent freezing and corrosion | 10.3.6.1.1 |
| ☐ Weep holes provided in lieu of low-point drains | Inspected to ensure they are clear and unobstructed | 10.3.6.1.2 |
| ☐ Automatic water spray nozzles and pilot sprinklers | Tested per 5.3.1 based on the type of heat-responsive element and environmental conditions | 10.3.7 |
The sprinkler sample-testing ages and sample selection of 5.3.1 are covered in the sprinkler article and are not repeated here.
K. Ultra-high-speed water spray systems (UHSWSS)
| Check | Criterion | Clause |
|---|---|---|
| ☐ Full operational test | Including response time measurements, at intervals not exceeding 1 year | 10.4.1 |
| ☐ Systems out of service | Tested before being placed back in service | 10.4.1.1 |
| ☐ All detectors | Tested monthly and inspected for physical damage and deposits on the lenses of optical detectors | 10.4.2 |
| ☐ Controllers | Inspected for faults at the start of each working shift | 10.4.3 |
| ☐ Valves on the water supply line | Verified open at the start of each working shift | 10.4.4.1 |
| ☐ Valves locked open or monitored by a device that sounds a trouble signal at the deluge system control panel or another central location | No shift inspection required | 10.4.4.2 |
| ☐ Response time verification | During the operational test | 10.4.5.1 |
| ☐ Response time limit | Per the system requirements but not more than 100 milliseconds | 10.4.5.2 |
L. When a component is adjusted, repaired or replaced: Table 10.5.1
Whenever a component in a water spray fixed system is adjusted, repaired, reconditioned or replaced, the action in Table 10.5.1 is performed (10.5.1). Where the original installation standard differs from the cited one, the appropriate installing standard may be used (10.5.2). These actions do not require a design review, which is outside the scope of the standard (10.5.3). In the table, "X" means the rule applies to that action and "—" marks an empty cell. In the printed table, the lines "(1) operational test, (2) check for leaks, (3) test all alarms" align with the manual release row, while the fire department connection row reads only "See Chapter 13".
| Component | Adjust | Repair/recondition | Replace | Required action |
|---|---|---|---|---|
| Water delivery components | ||||
| Fire department connections | — | — | — | See Chapter 13 |
| Manual release | X | X | X | (1) Operational test; (2) check for leaks at system working pressure; (3) test all alarms |
| Nozzles | X | X | X | Operational flow test |
| Pipe and fittings | X | X | X | Operational flow test |
| Alarm and supervisory components | ||||
| Detection system | X | X | X | Operational test for conformance with NFPA 15 and/or NFPA 72 |
| Pressure-switch-type waterflow | X | X | X | Operational test using inspector’s test connection |
| Valve supervisory device | X | X | X | Test for conformance with NFPA 15 and/or NFPA 72 |
| Water motor gong | X | X | X | Operational test using inspector’s test connection |
| Status-indicating components | ||||
| Gauges | — | — | X | Verify at 0 psi (0 bar) and system working pressure |
| Testing and maintenance components | ||||
| Auxiliary drains | X | X | X | (1) Inspect for leaks at system working pressure; (2) main drain test |
| Main drain | X | X | X | Full-flow main drain test |
| Structural components | ||||
| Hanger/seismic bracing | X | X | X | Inspect for conformance with NFPA 15 and/or NFPA 13 |
| Pipe stands | X | X | X | Inspect for conformance with NFPA 15 and/or NFPA 13 |
| Informational components | ||||
| Identification signs | X | X | X | Inspect for conformance with NFPA 15 |
Frequently Asked Questions
How often are water spray nozzles inspected under NFPA 25?
Annually and after each system activation (Table 10.1.1.2, 10.2.4). Open nozzles must be in place, aimed in the intended direction and free of loading and corrosion; a misaligned nozzle is re-aimed visually and its pattern checked at the next flow test (10.2.4.1, 10.2.4.1.2).
What is measured and recorded in the operational test?
The response time of heat detection (within 40 seconds) or of flammable gas detection (per the design), the discharge time from detection to water delivery at the protected area, and pressures at the most remote nozzle and at the deluge valve; readings are compared with the hydraulic design pressures and discharge patterns are observed (10.3.3.1–10.3.3.4).
When are strainers cleaned?
Mainline strainers are flushed until clear after each operation or flow test and removed and inspected every 5 years; individual nozzle strainers are removed and cleaned after each operation or flow test (10.2.6.1, 10.2.1.7, 10.2.6.2). Damaged or corroded parts are replaced or repaired (10.2.6.4).
How are components in areas where the process cannot be stopped inspected?
Items in areas inaccessible for safety reasons, such as continuous process operations or energized electrical equipment, are inspected during each scheduled shutdown but not more than every 18 months (10.2.1.1); they may be tested at longer intervals per 13.4.4.2.3.2 (10.2.1.3).
How many spare automatic nozzles or pilot sprinklers must be kept?
At least one of each type on the property, and in total no fewer than 6 for under 300 automatic nozzles or pilot sprinklers, 12 for 300 to 1000, and 24 for over 1000 (10.2.4.3.7). Spares are kept in a cabinet where the ambient temperature does not exceed 100 °F (38 °C) (10.2.4.3.5).

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 10 (10.1–10.5), Table 10.1.1.2 and Table 10.5.1; explanatory material of Annex A.10.1, A.10.1.3, A.10.2.3, A.10.2.3.1, A.10.2.3.2, A.10.2.4, A.10.2.4.3.3, A.10.2.5.2, A.10.2.6, A.10.3.2, A.10.3.3.1 and A.10.3.3.3. The content of Chapters 4, 5, 7, 8, 9, 13, 14 and 15 and of NFPA 13, NFPA 15 and NFPA 72 referenced by Chapter 10 is not reproduced here.