This article in the NFPA 25 series covers Chapter 9: water storage tanks dedicated to fire protection. The fire pump and sprinkler system articles dealt with the side that uses the water; this one covers the structure that holds it: water level, heating system and water temperature, the tank exterior and its surroundings, interior inspection and the tests made during it, level indicators and alarm tests, maintenance, automatic tank fill valves and what to do when a component changes. Check valves, control valves and gauges on the tank are sent to Chapter 13; they are covered in the valves and common components article. Every line carries its clause or table number from NFPA 25-2026.

In short: The water level is inspected quarterly in tanks with supervised water-level alarms and monthly in tanks without them; the tank is kept full or at the designed water level (9.2.1, 9.4.2). Water temperature is not allowed below 40 °F (4 °C) (9.2.3.1); a heating system without a supervised low-temperature alarm is inspected daily during the heating season (9.2.2.2). The tank exterior, support structure, foundation, vents, ladders and surrounding area are inspected quarterly; expansion joints, hoops and grillage and coated surfaces annually (9.2.4). The interior is inspected every 3 years in steel tanks without corrosion protection and every 5 years in all other tanks (9.2.5.1). Level indicators are tested every 5 years and high and low water level signals annually (9.3.1, 9.3.5). The automatic fill valve is tested yearly and its refill rate recorded (9.5.3).

A. Scope and general rules

Chapter 9 gives the minimum requirements for routine inspection, testing and maintenance of water storage tanks dedicated to fire protection use and installed to NFPA 22 or another approved installation standard (9.1.1.1). Minimum frequencies come from Table 9.1.1.2 (9.1.1.2).

CheckCriterionClause
☐ Common components and valvesInspected, tested and maintained per Chapter 139.1.2
☐ Obstruction investigation neededFollow the procedures of Chapter 149.1.3
☐ Impairment to protectionFollow the impairment procedures of Chapter 159.1.4

B. Frequency summary: Table 9.1.1.2

The standard’s summary table is reproduced below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the reference in the right-hand column. Frequencies marked with an asterisk (*) apply to the cold weather / heating season only (footnote to Table 9.1.1.2).

ItemFrequencyReference
Inspection
Catwalks and laddersQuarterly9.2.4.1
Check valves—Chapter 13
Control valves—Chapter 13
Expansion jointsAnnually9.2.4.3
FoundationQuarterly9.2.4.1
Heating system — tanks with supervised low-temperature alarms connected to constantly attended locationQuarterly9.2.2.1
Heating system — tanks without supervised low-temperature alarms connected to constantly attended locationDaily*9.2.2.2
Hoops and grillageAnnually9.2.4.4
Interior — all other tanks5 years9.2.5.1.2
Interior — steel tanks without corrosion protection3 years9.2.5.1.1
Painted, coated, or insulated surfacesAnnually9.2.4.5
Support structureQuarterly9.2.4.1
Surrounding areaQuarterly9.2.4.2
Tank — exteriorQuarterly9.2.4.1
Temperature alarms — connected to constantly attended locationQuarterly*9.2.3.2
Temperature alarms — not connected to constantly attended locationWeekly*9.2.3.3
VentsQuarterly9.2.4.1
Water level — tanks equipped with supervised water-level alarms connected to constantly attended locationQuarterly9.2.1.1
Water level — tanks without supervised water-level alarms connected to constantly attended locationMonthly9.2.1.2
Test
High-temperature limit switchesPrior to heating season9.3.4
Level indicators5 years9.3.1
Low-water-temperature alarmsPrior to heating season9.3.3
Pressure gauges—Chapter 13
Tank heating systemPrior to heating season9.3.2
Valve status test—Chapter 13
Water-level signals (high and low)Annually9.3.5
Maintenance
Check valves—Chapter 13
Control valves—Chapter 13
Embankment-supported coated fabric (ESCF)2 years or per manufacturer9.4.6.2
Water level—9.4.2

The same table as a calendar

Because site work is planned by frequency, the items of Table 9.1.1.2 and Table 9.5.1.1 are regrouped below by frequency. Which line applies to your tank depends on whether its alarms are connected to a constantly attended location.

FrequencyTaskClause
☐ Daily (heating season)Heating system inspection on a tank without a supervised low-temperature alarm9.2.2.2
☐ Daily/weekly (cold weather)Inspection of the automatic fill valve enclosureTable 9.5.1.1
☐ Weekly (heating season, mean temperature below 40 °F)Water temperature inspected and recorded on a tank without low-temperature alarms9.2.3.3
☐ MonthlyWater level on a tank without supervised level alarms; exterior inspection of the automatic fill valve; fill valves secured with locks or electrically supervised9.2.1.2, Table 9.5.1.1, 9.5.1.2
☐ QuarterlyWater level on a tank with supervised level alarms; tank exterior, support structure, foundation, vents, catwalks and ladders; surrounding area; cleaning of fill valve strainers9.2.1.1, 9.2.4.1, 9.2.4.2, 9.5.2.3
☐ Quarterly (heating season)Heating system on a tank with supervised low-temperature alarms; water temperature record when the mean temperature is below 40 °F9.2.2.1, 9.2.3.2
☐ Prior to heating seasonTest of the tank heating system, low-water-temperature signals and high-water-temperature limit switches9.3.2, 9.3.3, 9.3.4
☐ AnnuallyExpansion joints; hoops and grillage of wooden tanks; painted, coated or insulated surfaces; test of high and low water level signals; automatic fill valve test9.2.4.3, 9.2.4.4, 9.2.4.5, 9.3.5, 9.5.3
☐ Annually/5 yearsInterior inspection of the automatic fill valveTable 9.5.1.1
☐ 2 years or per manufacturerCleaning and painting of exposed ESCF tank surfaces9.4.6.2
☐ 3 yearsInterior inspection of steel tanks without corrosion protection9.2.5.1.1
☐ 5 yearsInterior inspection of all other tanks; level indicator test; inspection of fill valve strainers, filters and orifices9.2.5.1.2, 9.3.1, Table 9.5.1.1

C. Water level

CheckCriterionClause
☐ Tank with water level alarms supervised per NFPA 72Water level inspected quarterly9.2.1.1
☐ Tank without supervised water level alarms connected to a constantly attended locationWater level inspected monthly9.2.1.2
☐ Where a level indicator is providedWater level inspection verified through the level indicator9.2.1.3.1
☐ Water in the tankAt full or at the designed water level9.2.1.3.2
☐ MaintenanceTank maintained full or at the designed water level9.4.2

The explanatory material of Annex A.9.2.1.1 recommends more frequent inspection where extreme conditions such as freezing temperatures or an arid climate can increase the probability of adversely affecting the stored water; since the level alarm reports level rather than water condition, the condition of the water can be checked during the same inspection. Per Annex A.9.2.1.3.2, the designed water level should be based on the fire protection system with the largest stored water volume requirement (demand and duration) and is often used as the set point of the tank fill valve. These are explanatory notes, not mandatory requirements.

D. Heating system and water temperature

CheckCriterionClause
☐ Heating system on a tank with low-water-temperature alarms supervised per NFPA 72 and connected to a constantly attended locationInspected quarterly during the heating season9.2.2.1
☐ Heating system without a supervised low-temperature alarm connected to a constantly attended locationInspected daily during the heating season9.2.2.2
☐ Temperature of water in the tankNot less than 40 °F (4 °C)9.2.3.1
☐ Water temperature, tank with low-temperature alarms supervised per NFPA 72 and connected to a constantly attended locationInspected and recorded quarterly during the heating season when the mean temperature is below 40 °F (4 °C)9.2.3.2
☐ Water temperature, tank without low-temperature alarms connected to a constantly attended locationInspected and recorded weekly during the heating season when the mean temperature is below 40 °F (4 °C)9.2.3.3

E. Exterior inspection: tank, support structure and surroundings

CheckCriterionClause
☐ Tank exterior, supporting structure, vents, foundation, and catwalks or ladders where providedQuarterly: no signs of obvious damage or weakening9.2.4.1
☐ Surrounding area: combustiblesFree of combustible storage, trash, debris, brush or material that could present a fire exposure hazard9.2.4.2(1)
☐ Surrounding area: accumulationFree of material accumulating on or near parts that could result in accelerated corrosion or rot9.2.4.2(2)
☐ Tank and supportFree of ice buildup9.2.4.2(3)
☐ Exterior sides and top of embankments supporting coated fabric tanksFree of erosion9.2.4.2(4)
☐ Expansion joints (where provided)Annually: no leaks or cracks9.2.4.3
☐ Hoops and grillage of wooden tanksInspected annually9.2.4.4
☐ Exterior painted, coated or insulated surfaces of the tank and supporting structure (where provided)Annually: no signs of degradation9.2.4.5

The surrounding area is also inspected quarterly (9.2.4.2). The explanatory material of Annex A.9.2.4.1 refers lightning protection systems, where provided, to NFPA 780 for inspection, testing and maintenance.

F. Interior inspection

CheckCriterionClause
☐ Steel tanks without corrosion protectionInterior inspected every 3 years9.2.5.1.1
☐ All other types of tanksInterior inspected every 5 years9.2.5.1.2
☐ Interior inspection by underwater evaluationSilt is first removed from the tank floor9.2.5.2
☐ Tank interiorInspected for pitting, corrosion, spalling, rot and other deterioration; waste materials and debris; aquatic growth; and local or general failure of interior coating9.2.5.3
☐ Steel tank showing interior pitting, corrosion or coating failureTested per 9.2.69.2.5.4
☐ Tanks on ring-type foundations with sand in the middleInspected for evidence of voids beneath the floor9.2.5.5
☐ Heating system and components including pipingInspected9.2.5.6
☐ Anti-vortex plateInspected for deterioration or blockage9.2.5.7

Annex A notes: to aid evaluation, the owner may stencil the last known date of an interior paint job on the tank exterior, typically near a manway at eye level (Annex A.9.2.5.1.1); if written verification of interior corrosion protection per NFPA 22 cannot be provided, the interior should be inspected every 3 years (Annex A.9.2.5.1.2); voids can be found by looking for dents in the floor and by walking on it to find buckling (Annex A.9.2.5.5).

G. Tests during interior inspection of steel tanks

Where a drained interior inspection of a steel tank is required by 9.2.5.4, the following tests are conducted (9.2.6):

CheckCriterionClause
☐ Coating adhesionEvaluated with the adhesion test of ASTM D3359, generally referred to as the “cross-hatch test”9.2.6(1)
☐ Dry film thicknessMeasured at random locations to determine overall coating thickness9.2.6(2)
☐ Wall thicknessNondestructive ultrasonic readings where there is evidence of pitting or corrosion9.2.6(3)
☐ Pinholes, cracks or other coating compromisesSpot wet-sponge test of interior surfaces, with special attention to sharp edges such as ladder rungs, nuts and bolts9.2.6(4)
☐ Metal loss and rust on the tank bottom undersideUltrasonic testing where there is evidence of pitting or corrosion; removal, visual inspection and replacement of random floor coupons is an acceptable alternative9.2.6(5)
☐ Flat-bottom tanksVacuum-box test at bottom seams using the procedures in NFPA 229.2.6(6)

H. Testing: level indicators, heating and alarms

CheckCriterionClause
☐ Level indicatorsEvery 5 years: tested for accuracy and freedom of movement9.3.1
☐ Tank heating system (where provided)Tested toward the beginning of the heating season, before freezing conditions, to ensure proper working order9.3.2
☐ Low-water-temperature signals (where provided)Tested toward the beginning of the heating season, before freezing conditions9.3.3
☐ High-water-temperature limit switches on tank heating systems (where provided)Tested toward the beginning of the heating season, before freezing conditions9.3.4
☐ High and low water level signalsTested annually9.3.5
☐ Pressure gauges and valve status testPer Chapter 13Table 9.1.1.2

The explanatory material of Annex A.9.3.1 gives a step-by-step procedure and a figure for the 5-year accuracy test of listed mercury gauges. Per Annex A.9.3.4 (to which A.9.3.5 also refers), the manufacturer’s instructions should be consulted for testing; where the actual initiating device cannot be tested, only the circuitry should be tested.

I. Maintenance

CheckCriterionClause
☐ Voids discovered beneath tank floorsFilled by pumping in grout or by accessing the sand and replenishing9.4.1
☐ Water levelTank maintained full or at the designed water level9.4.2
☐ Roof hatch covers and the door at the top of the frostproof casingAlways kept securely fastened with substantial catches against freezing and windstorm damage9.4.3
☐ Waste materialsNo boards, paint cans, trim or loose material left in the tank or on its surface9.4.4
☐ SiltRemoved during interior inspections, or more often as needed to avoid accumulation to the level of the tank outlet9.4.5
☐ Embankment-supported coated fabric (ESCF) suction tanksMaintained per this section and the tank manufacturer’s instructions9.4.6.1
☐ Exposed surfaces of ESCF tanksCleaned and painted every 2 years or per the manufacturer’s instructions9.4.6.2
☐ Check valves and control valvesMaintained per Chapter 13Table 9.1.1.2

J. Automatic tank fill valves

Automatic tank fill valves are inspected per Table 9.5.1.1 (9.5.1.1):

ItemFrequencyReference
Inspection
Enclosure (during cold weather)Daily/weeklyChapter 4
ExteriorMonthlyChapter 13
InteriorAnnually/5 yearsChapter 13
Strainers, filters, orifices (inspect)5 yearsChapter 13
Test
Automatic tank fill valveAnnually9.5.3
Maintenance
Strainers (clean)Quarterly9.5.2.3
CheckCriterionClause
☐ OS&Y isolation valves that are part of the automatic fill valveInspected per Chapter 139.5.1.1.1
☐ Valves secured with locks or electrically supervised per applicable NFPA standardsInspected monthly9.5.1.2
☐ EnclosureVerified to be heated and secured9.5.1.3
☐ Maintenance of all automatic tank fill valvesBy qualified personnel following the manufacturer’s instructions and the procedures and policies of the AHJ9.5.2.1
☐ Rubber partsReplaced at the frequency required by the AHJ and the manufacturer’s instructions9.5.2.2
☐ StrainersCleaned quarterly9.5.2.3
☐ Annual test: actuationValve actuated automatically by lowering the water level in the tank9.5.3(1)
☐ Annual test: refill rateRefill rate measured and recorded9.5.3(2)

K. When a component is adjusted, repaired or replaced: Table 9.6.1

Whenever a component in a water storage tank is adjusted, repaired, reconditioned or replaced, the action in Table 9.6.1 is performed (9.6.1). Where the original installation standard differs from the cited one, the appropriate installing standard may be used (9.6.2). These actions do not require a design review, which is outside the scope of the standard (9.6.3). In the table, "X" means the rule applies to that action and "—" marks an empty cell.

ComponentAdjustRepair/reconditionReplaceTest criteria
Tank components
Catwalks and laddersXXXVerify integrity in conformance with NFPA 22
Expansion jointsXXXVerify integrity in conformance with NFPA 22
Heating systemXXXVerify heating system is in conformance with NFPA 22
Hoops and grillageXXXVerify integrity in conformance with NFPA 22
Insulation—XXVerify integrity in conformance with NFPA 22
Overflow pipingXXXVerify integrity in conformance with NFPA 22
Support structure—XXVerify integrity in conformance with NFPA 22
Tank exterior—XXVerify integrity in conformance with NFPA 22
Tank interior—XXRemove debris; verify integrity in conformance with NFPA 22
Alarm and supervisory components
Enclosure temperatureXXXOperational test for conformance with NFPA 22 and/or NFPA 72
High and low water levelXXXOperational test for conformance with NFPA 22 and/or NFPA 72 and the design water levels
Valve supervisionXXXOperational test for conformance with NFPA 22 and/or NFPA 72
Water temperatureXXXOperational test for conformance with NFPA 22 and/or NFPA 72
Fill and discharge components
Automatic fill valvesXX—Perform annual test in accordance with 9.5.3
ValvesXXXSee Chapter 13
Status indicators
Level indicatorsXXXVerify conformance with NFPA 22
Pressure gauges——XVerify at 0 psi (0 bar) and at system working pressure

Frequently Asked Questions

How often is the water level of a fire protection tank inspected under NFPA 25?

Quarterly in tanks with water level alarms supervised per NFPA 72, and monthly in tanks without supervised alarms connected to a constantly attended location (9.2.1.1, 9.2.1.2). Where a level indicator is provided, the inspection is verified through it, and the tank must be full or at the designed water level (9.2.1.3).

How often is the tank interior inspected?

Every 3 years for steel tanks without corrosion protection and every 5 years for all other tanks (9.2.5.1.1, 9.2.5.1.2). For an underwater evaluation, silt is removed from the floor first (9.2.5.2). A steel tank showing pitting, corrosion or coating failure gets the coating, thickness, sponge, bottom and vacuum-box tests of 9.2.6 (9.2.5.4).

What is the minimum water temperature in the tank?

Not less than 40 °F (4 °C) (9.2.3.1). During the heating season, when the mean temperature is below 40 °F, the water temperature is inspected and recorded quarterly in tanks with supervised low-temperature alarms and weekly in tanks without them (9.2.3.2, 9.2.3.3).

When is the tank heating system tested?

Toward the beginning of the heating season, before freezing conditions set in (9.3.2). Low-water-temperature signals and high-water-temperature limit switches are tested at the same time (9.3.3, 9.3.4). The heating system is also inspected daily during the heating season without a supervised alarm, or quarterly with one (9.2.2).

How is an automatic tank fill valve tested?

Yearly: the valve is actuated automatically by lowering the water level in the tank, and the refill rate is measured and recorded (9.5.3). Its strainers are cleaned quarterly, and during cold weather the enclosure is verified to be heated and secured (9.5.2.3, 9.5.1.3, Table 9.5.1.1).

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Standards & References

NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 9 (9.1–9.6), Table 9.1.1.2, Table 9.5.1.1 and Table 9.6.1; explanatory material of Annex A.9.2.1.1, A.9.2.1.3.2, A.9.2.4.1, A.9.2.5.1.1, A.9.2.5.1.2, A.9.2.5.5, A.9.3.1 and A.9.3.4. The content of Chapters 4, 13, 14 and 15 and of NFPA 22, NFPA 72 and NFPA 780 referenced by Chapter 9 is not reproduced here.