This article in the NFPA 25 series covers Chapter 12: water mist systems installed to NFPA 750 or another approved installation standard. In water mist the nozzles and strainers are small and pressures are high, so unlike the sprinkler chapter this one has separate lines for cylinders, water quality, filters, pneumatic valves and high-pressure hoses. For pump testing see the fire pump checklist; for common components and valves that Chapter 12 does not address see the valves and common components checklist; for tanks see the water storage tank checklist. Nozzle inspection follows the same logic as the sprinkler checklist, but frequencies and sample sizes differ. Every line carries its clause number from NFPA 25-2026.

In short: Nozzles are inspected from the floor level annually and after each discharge (12.2.1, Table 12.1.1.2). Automatic nozzles are replaced or sample-tested at 10 years (5 years in harsh environments) and retested every 5 years; the sample is at least 4 nozzles or 1 percent (12.3.1). Gas cylinder pressure is checked monthly where not electrically supervised and semiannually where supervised (12.2.5.4). Water quality is inspected semiannually in the first year, then annually (12.2.10.2). Open-nozzle systems are operated annually (12.3.16); hoses are tested every 5 years at 1½ times maximum container pressure (12.3.10). At least 3 spare nozzles are kept on the premises (12.4.2.3).

A. Scope and general rules

Chapter 12 gives the minimum requirements for routine inspection, testing and maintenance of water mist systems installed to NFPA 750 or another approved installation standard (12.1.1.1). Minimum frequencies come from Table 12.1.1.2 (12.1.1.2).

CheckCriterionClause
☐ Common components and valves (where Chapter 12 gives no criteria)Chapter 13 applies12.1.2
☐ Impairment to protectionFollow the procedures of Chapter 1512.1.3
☐ Hose connectionsInspected, tested and maintained per Chapters 6 and 1312.1.4

B. Frequency summary: Table 12.1.1.2

The standard’s water mist summary table is reproduced in full below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the chapter or standard in the right-hand column. Paired frequencies such as “Quarterly/annually” mean the referenced clause sets two frequencies for two cases (for example supervised and unsupervised levels).

ItemFrequencyReference
Inspection
Additive storage cylindersQuarterly/semiannually12.2.7
Air compressors and receivers—Chapter 13
Backflow preventers—Chapter 13
High-pressure storage cylinder assemblies (gas and water): securementQuarterly/annually12.2.5.1.1, 12.2.5.1.2
High-pressure storage cylinder assemblies (gas and water): externalEvery 5 years12.2.5.2
High-pressure storage cylinder assemblies (gas and water): specification, capacity and pressure ratingAnnually12.2.5.3
High-pressure storage cylinder assemblies (gas and water): cylinder pressureMonthly/semiannually12.2.5.4.1, 12.2.5.4.2
High-pressure storage cylinder assemblies (gas and water): discharge pressureAnnually12.2.5.4.3
High-pressure storage cylinder assemblies (gas and water): manually operated indicating control valvesSemiannually12.2.5.8
High-pressure storage cylinder assemblies (gas and water): hosesAnnually12.2.5.9
High-pressure storage cylinder assemblies (gas and water): filtersQuarterly/annually12.2.5.7
Control equipment—NFPA 72
Detection systems—NFPA 72
Enclosure features, interlocksSemiannually12.2.11
Fire pump system—Chapter 8
Gauges (piping system)—Chapter 13
Hangers, braces and supportsAnnually12.2.4
Internal piping conditions—Chapter 14
NozzlesAnnually and after each system discharge or activation12.2.1
Pneumatically operated valves and tubingSemiannually12.2.6
Pneumatically operated standby pumpsMonthly12.2.9
Strainers and filtersAfter each operation or flow test12.2.2
System control valves—Chapter 13
System piping, tubing and fittingsAnnually12.2.3
Water recirculation tanksMonthly/quarterly/annually12.2.8
Water storage tanks—Chapter 9
Water supplyQuarterly/annually12.2.10
Testing
Additives and injection systemAnnually12.3.4, 12.3.5
Air compressors and receivers—Chapter 13
Backflow preventers—Chapter 13
Compressed gas storage cylinder5–12 years12.3.6
Control equipmentAnnually12.3.7
Detection systemsAnnually12.3.8
Fire pump system—Chapter 8
Gauges (piping system)—Chapter 13
Hoses5 years12.3.10
InterlocksAnnually12.3.11
Nozzles, automaticAt 10 years and every 5 years thereafter12.3.1.2
Nozzles, automatic (harsh environments)At 5 years and every 5 years thereafter12.3.1.3
Nozzles, openAt 10 years and every 5 years thereafter12.3.2.3
Nozzles, open (harsh environments)Annually12.3.2.2
Pneumatic valvesSemiannually12.3.12
Pneumatic valve solenoid releasesAnnually12.3.13
Pneumatically operated standby pumpsAnnually12.3.14
Strainers and filtersAfter each operation or flow test12.3.3
System control valvesAnnually12.3.15
Water mist systemAnnually12.3.16
Water recirculation tanksAnnually12.3.17
Water storage cylinders (high pressure)5 years12.3.18
Water storage tanks—Chapter 9
Water supplyAnnually12.3.20
Maintenance
Air compressors and receivers—Chapter 13
Backflow preventers—Chapter 13
Control equipment—NFPA 72
Detection systems—NFPA 72
Fire pump system—Chapter 8
Pneumatically operated standby pumpsEvery 5 years12.4.3
Strainers and filtersAfter each operation or flow test12.2.2
Water mist systemAnnually12.4.1
Water tanksAnnually12.4.1

C. Water mist nozzle inspection

Water mist nozzles are inspected annually from the floor level (12.2.1.1). A nozzle showing any of the following is replaced (12.2.1.1.1):

CheckCriterionClause
☐ LeakageReplace if present12.2.1.1.1(1)
☐ CorrosionReplace if detrimental to nozzle performance12.2.1.1.1(2)
☐ Physical damageReplace if present12.2.1.1.1(3)
☐ Glass bulb heat-responsive elementReplace if fluid has been lost; a nozzle whose bulb is partially or fully empty is replaced12.2.1.1.1(4), 12.2.1.1.3
☐ LoadingReplace if detrimental to nozzle performance12.2.1.1.1(5)
☐ PaintReplace if applied by anyone other than the nozzle manufacturer and detrimental to performance12.2.1.1.1(6)
☐ Nozzle installed in the incorrect orientationCorrect by repositioning the branch line, drop or sprig, or replace12.2.1.1.2
☐ Nozzles in concealed spaces such as above suspended ceilingsNo inspection required12.2.1.1.4
☐ Nozzles in areas inaccessible for safety due to process operationsInspected during each scheduled shutdown12.2.1.1.5
☐ Stock, furnishings or equipment closer than the manufacturer’s installation clearanceCorrected12.2.1.1.6
☐ Open nozzles after water discharge from installed nozzlesRemoved, inspected and cleaned, including their strainers12.2.1.1.7
☐ Supply of spare automatic nozzlesInspected annually for the number and type required by NFPA 75012.2.1.2

D. Strainers, piping and hangers

CheckCriterionClause
☐ Individual nozzle strainers and filtersInspected and cleaned after each operation or flow test12.2.2.1
☐ All strainers and filtersInspected and cleaned per the manufacturer’s instructions12.2.2.2
☐ Damaged or corroded parts or assembliesReplaced or repaired12.2.2.3
☐ Distribution piping, tubing and fittingsInspected annually from the floor level12.2.3.1
☐ Condition of piping, tubing and fittingsFree of mechanical damage, leakage and corrosion12.2.3.2
☐ External loadsNo materials resting on or hung from the pipe12.2.3.3
☐ Piping, tubing and fittings in concealed spacesNo inspection required12.2.3.4
☐ Piping, tubing and fittings inaccessible due to process operationsInspected during each scheduled shutdown12.2.3.5
☐ Hangers, braces and supportsInspected annually from the floor level; not damaged, loose or unattached12.2.4.1, 12.2.4.2
☐ Damaged, loose or unattached hangers and supportsReplaced or refastened12.2.4.3
☐ Hangers in concealed spacesNo inspection required12.2.4.4
☐ Hangers inaccessible due to process operationsInspected during each scheduled shutdown12.2.4.5

E. High-pressure storage cylinders (gas and water)

CheckCriterionClause
☐ Cylinders and mounting bracketsFastened securely per the manufacturer’s requirements12.2.5.1
☐ Securement of compressed gas cylindersInspected quarterly12.2.5.1.1
☐ Securement of high-pressure water cylindersInspected annually12.2.5.1.2
☐ Compressed gas cylinders in continuous service without dischargingComplete external visual inspection every 5 years or more often if required, per Section 3 of CGA C-6, except cylinders need not be emptied or stamped while under pressure; competent personnel only12.2.5.2–12.2.5.2.2
☐ Record of the external inspectionOn a record tag permanently attached to each cylinder and on a suitable inspection report; a copy furnished to the owner or authorized representative; retained for the life of the system12.2.5.2.3–12.2.5.2.3.2
☐ Cylinder specification, capacity and pressure ratingVisually inspected annually12.2.5.3
☐ Pressure in high-pressure storage containersWithin the water mist manufacturer’s specifications12.2.5.4
☐ Pressure of electrically supervised and monitored compressed gas cylindersAt a minimum semiannually, or per the manufacturer’s specifications12.2.5.4.1
☐ Pressure of compressed gas cylinders not electrically supervisedAt a minimum monthly, or per the manufacturer’s specifications12.2.5.4.2
☐ Cylinder pressure on the discharge side of a high-pressure water containerAnnually12.2.5.4.3
☐ Water level in high-pressure containersWithin the manufacturer’s specifications; unsupervised levels inspected quarterly, supervised levels semiannually12.2.5.5–12.2.5.5.2
☐ Vent plugs on high-pressure water containersAnnually, visually confirm the vent is not ruptured or open12.2.5.6
☐ Filter on high-pressure water containersAnnually, visually confirm it is clean12.2.5.7
☐ Manually operated indicating control valvesVisually confirmed in proper position at a minimum semiannually, or per the manufacturer’s specifications12.2.5.8
☐ All hoses used as part of the systemVisually inspected annually for damage12.2.5.9

F. Pneumatic valves, additive cylinders, recirculation tanks and standby pumps

CheckCriterionClause
☐ Pneumatically operated valves and pneumatic tubingVisually inspected at a minimum semiannually, or per the manufacturer’s specifications12.2.6
☐ Additive storage cylinderVisually inspected quarterly for external corrosion or damage12.2.7.1
☐ Quantity of additive agentInspected semiannually12.2.7.2
☐ Recirculation tank attachments and supportsSecured per the manufacturer’s requirements12.2.8.1
☐ Water level in recirculation tanksWithin the manufacturer’s specifications; unsupervised levels inspected monthly, supervised levels quarterly12.2.8.2–12.2.8.2.2
☐ Water quality in recirculation tanksInspected annually; drained, flushed and refilled as necessary12.2.8.3
☐ Recirculation tank filters, strainers and cyclone separatorVisually inspected annually and cleaned as necessary12.2.8.4
☐ Pneumatic standby pump: moisture trapVisually inspected and emptied monthly12.2.9.1
☐ Pneumatic standby pump: compressed gas supply and inlet air pressureVisually inspected monthly per the manufacturer’s specifications12.2.9.2
☐ Pneumatic standby pump: outlet water (standby) pressureVisually inspected monthly per the manufacturer’s specifications12.2.9.3
☐ Oil level on air regulator unitsVisually inspected monthly per the manufacturer’s specifications12.2.9.4

G. Water supply, water quality, enclosures and interlocks

CheckCriterionClause
☐ Water supply pressureQuarterly, visually confirmed within the water mist manufacturer’s specifications12.2.10.1
☐ Water qualityInspected semiannually for the first year, then annually12.2.10.2
☐ Integrity of the enclosure and interlocksInspected semiannually12.2.11

H. Nozzle sample testing

Where required by this section, sample automatic nozzles are submitted for functional testing to an approved testing laboratory acceptable to the AHJ (12.3.1.1).

NozzleReplacement or first testRetestClause
Automatic nozzlesAfter 10 years installedEvery 5 years12.3.1.2
Automatic nozzles in harsh environments, including corrosive atmospheres and corrosive water suppliesReplaced or sample-tested on a 5-year basisEvery 5 years12.3.1.3
Open nozzles in environments with residues, including corrosive atmospheres and corrosive water suppliesReplaced or sample-tested on a 1-year basisAnnually12.3.2.2
Open nozzles where water cannot be discharged annually and not covered by 12.3.2.2After 10 years in serviceEvery 5 years12.3.2.3
CheckCriterionClause
☐ Automatic nozzle sampleAt least 4 nozzles or 1 percent of the nozzles per individual sample, whichever is greater12.3.1.4
☐ Open nozzle sampleAt least 3 nozzles or 1 percent, whichever is greater12.3.2.4
☐ One nozzle in a sample failsAll nozzles in the area represented by that sample are replaced12.3.1.5, 12.3.2.5
☐ Automatic nozzles to be replacedPer 12.4.212.3.1.6
☐ Nozzles in spray areas and mixing rooms of resin application areas without protective coveringsCapable of operating and protecting the hazard with overspray residue in the event of a fire12.3.2.1

I. Strainers, additives and operational test with additives

CheckCriterionClause
☐ System strainers (basket or screen)Flushed until clear after each operation or flow test12.3.3
☐ AdditiveSamples submitted per the manufacturer’s sampling procedures for evaluation of quality to its specification12.3.4
☐ Additive injection rateOperational tests confirm it responds as designed, automatically and manually; procedures simulate anticipated emergency events12.3.5.1, 12.3.5.2
☐ Discharge would be hazardous or conflict with local requirementsApproved alternate method to achieve full-flow conditions allowed12.3.5.3
☐ Full-flow test of a system with additiveMay use water only in lieu of the additive12.3.5.4
☐ Automatic fire detectionOperates within NFPA 72 for the detector type when exposed to a test source; response time recorded12.3.5.5
☐ Open discharge devicesTime lapse between detection operation and water delivery recorded12.3.5.6

J. Compressed gas cylinders, control equipment and detection

CheckCriterionClause
☐ Gas cylinders designed to US DOT, Canadian Transport Commission (CTC) or similar rulesNot recharged without retesting if more than 5 years since the last test; retest per DOT, CTC or similar design and requalification regulations12.3.6.1, 12.3.6.2
☐ Test reportCompleted copy furnished to the owner or authorized representative; retained for the life of the system12.3.6.3, 12.3.6.4
☐ Control equipmentOperational tests confirm response as designed, automatically and manually; annual operational testing per NFPA 72; approved alternate full-flow method where discharge is hazardous12.3.7.1–12.3.7.3
☐ Detection systemsOperational tests; annual operational testing of initiating devices per NFPA 72; detectors operate within NFPA 72 when exposed to a test source and response time is recorded; time to water delivery recorded for open devices12.3.8.1–12.3.8.4

K. Pumps, gas-driven systems and hose testing

CheckCriterionClause
☐ Fire pumpsTested per Section 8.312.3.9.1
☐ Systems powered or operated by pressurized gas (normally air or nitrogen) cylinders or pressure vesselsTested quarterly or as determined by an approved risk analysis per the manufacturer’s specifications, using gas and water from the primary cylinders, vessels or tanks or from temporary test cylinders or tanks, to verify nozzle flows on operation (no blockage, fully developed spray pattern)12.3.9.2
☐ All hoseTested every 5 years12.3.10.1
☐ Hose test pressure1½ times the maximum container pressure at 130 °F (54.4 °C)12.3.10.2

The hose testing procedure is as follows (12.3.10.3):

  1. The hose is removed from any attachment.
  2. The hose assembly is placed in a protective enclosure designed to permit visual observation of the test.
  3. The hose is completely filled with water before testing.
  4. Pressure is applied at a rate of rise that reaches test pressure within 1 minute; test pressure is held for 1 full minute; distortion or leakage is noted.
  5. If pressure has not dropped and couplings have not moved, pressure is released; the assembly passes if no permanent distortion has taken place.
  6. A passing hose is completely dried internally; if heat is used, the temperature does not exceed the manufacturer’s specifications.
  7. Assemblies failing the test are marked, destroyed and replaced with new assemblies.
  8. Each passing assembly is marked to show the date of test.

L. Interlocks, pneumatic valves, standby pumps and control valves

CheckCriterionClause
☐ Ventilation interlock (if required)Operation confirmed by annual testing12.3.11.1
☐ Fuel or lubrication system interlock (if required)Operation confirmed by annual testing12.3.11.2
☐ Pneumatic valvesOperational tests confirm response as designed, automatically and manually12.3.12.1
☐ Slave valves and valves intended to cycle on–offSemiannual operation test per the manufacturer’s instructions12.3.12.2
☐ Pneumatic cylinder release valvesReset after testing12.3.12.3, 12.3.13
☐ Pneumatic valve solenoid releasesOperational tests confirm automatic and manual response; electric release and manual release tested annually per the manufacturer’s instructions12.3.13.1, 12.3.13.2
☐ Pumps that are not main pressure pumps (booster, jockey or transfer)Operated to demonstrate support of their design function for the main pressure pumps12.3.14.1
☐ Standby pumpsOperated at least annually to demonstrate system flow support when the main pressure pumps are tested12.3.14.2
☐ Control valve for each zone of protectionOperated annually through its full range and returned to its normal position12.3.15

M. Annual operational test of open-nozzle systems

Water mist systems are operated annually per 12.3.16.1 through 12.3.16.8 and the manufacturer’s instructions (12.3.16).

CheckCriterionClause
☐ Test preparationPrecautions taken to prevent damage to property12.3.16.1
☐ System responseOperational tests confirm the system responds as designed, automatically and manually12.3.16.2.1
☐ Water cannot be discharged into the occupancy or onto the hazardOperational test from a test connection with an orifice simulating a flow equal to or greater than that of the total number of nozzles in the protected space12.3.16.2.2
☐ Response timeDetection operates within the acceptance test specifications and 12.3.7; response times recorded12.3.16.3.1, 12.3.16.3.2
☐ Discharge timeTime lapse between detection operation and water delivery recorded12.3.16.4
☐ Discharge patternsFrom all open nozzles, observed to be unimpeded by plugged nozzles, nozzles correctly positioned and obstructions not preventing full development12.3.16.5.1
☐ Water cannot be dischargedNozzle orientation inspected and system tested with air to confirm nozzles are not obstructed12.3.16.5.2
☐ Obstructions foundPiping and nozzles cleaned and the system retested12.3.16.5.3
☐ Pressure readingsRecorded at the hydraulically most remote nozzle or test connection; with a deluge valve, a second reading at the deluge valve; compared with the hydraulic design pressures12.3.16.6.1–12.3.16.6.3
☐ Most remote nozzle inaccessibleNozzles may be checked visually without a pressure reading at that nozzle12.3.16.6.3.1
☐ Riser reading indicates the water supply has deterioratedA gauge is placed on the hydraulically most remote nozzle and compared with the required design pressure12.3.16.6.3.2
☐ Multiple systemsMaximum number of systems expected to operate in a fire tested simultaneously to check the water supply12.3.16.7
☐ Return to serviceAfter the full-flow test, system returned to service per the manufacturer’s instructions12.3.16.8

N. Recirculation tanks, high-pressure water cylinders and water supply testing

CheckCriterionClause
☐ Water recirculation tanksOperational tests confirm response as designed, automatically and manually12.3.17.1
☐ Float-operated valves and backflow prevention device (when present)Annual operation test per the manufacturer’s instructions12.3.17.2
☐ Recirculation tank outletPressure reading recorded during the operational discharge test12.3.17.3
☐ Water cylinders under high pressure that deliver the mist, become pressurized at activation, or serve as the water sourceTested per the applicable current pressure vessel standard or code12.3.18.1
☐ Water cylinders designed to DOT, CTC or similar rulesNot recharged without retesting if more than 5 years since the last test12.3.18.2
☐ Test reportCopy furnished to the owner or authorized representative; retained for the life of the system12.3.18.3, 12.3.18.4
☐ Water storage tanks or cylindersTested per Section 9.312.3.19
☐ Water supplyAnnually per Section 7.3 to verify the source pressure, flow, quantity and duration12.3.20

O. Maintenance: general

CheckCriterionClause
☐ PurposeKeep the system equipment operable or make repairs12.4.1.1
☐ Devices not described in this standard, where the manufacturer requiresMaintained12.4.1.1.1
☐ RecordsAs-built drawings, original acceptance test records and device maintenance bulletins retained12.4.1.2
☐ Replacement and spare componentsPer the manufacturer’s specifications and original design; accessible and stored to prevent damage or contamination12.4.1.3, 12.4.1.4
☐ After each system operationA representative sample of operated nozzles in the activated zone inspected12.4.1.5
☐ After each operation due to fireSystem filters and strainers cleaned or replaced12.4.1.6
☐ Water tank supplying a water mist systemDrained and refilled annually12.4.1.7
☐ Water mist system with open nozzlesFlushed annually12.4.1.8

P. Nozzle replacement and spare nozzles

CheckCriterionClause
☐ Replacement nozzlesProper characteristics for the application, including model and temperature rating; new nozzles only12.4.2.1, 12.4.2.2
☐ Spare nozzle supplyNever fewer than three on the premises, so operated or damaged nozzles can be promptly replaced12.4.2.3
☐ Type of sparesCorrespond to the manufacturers, models and temperature ratings in the property12.4.2.3.1
☐ Spare automatic nozzle cabinetWhere the temperature never exceeds 100 °F (38 °C)12.4.2.3.2
☐ Systems with fewer than 50 nozzlesNot fewer than 3 spare thermally activated nozzles12.4.2.3.3(1)
☐ Systems with 50 to 300 nozzlesNot fewer than 612.4.2.3.3(2)
☐ Systems with 301 to 1000 nozzlesNot fewer than 1212.4.2.3.3(3)
☐ Systems with over 1000 nozzlesNot fewer than 2412.4.2.3.3(4)
☐ Content of the spare stockAll types and ratings installed12.4.2.3.3
☐ Special nozzle wrench (where the manufacturer requires)Kept in the cabinet; one per nozzle type installed12.4.2.4, 12.4.2.4.1
☐ Nozzles with protective coverings in resin application areasContinue to be protected against overspray: cellophane bags 0.003 in. (0.076 mm) thick or less, or thin paper bags; coverings replaced periodically before heavy deposits accumulate12.4.2.5.1–12.4.2.5.3
☐ AlterationsNo alteration, ornamentation, paint or coating after shipment from the manufacturer12.4.2.6
☐ Automatic nozzles protecting commercial cooking equipment and ventilating systemsReplaced annually; not required where annual examination shows no buildup of grease or other material12.4.2.7, 12.4.2.7.1
☐ Pneumatically operated standby pumpsRebuilt every 5 years or as specified by the manufacturer12.4.3

Q. Training

CheckCriterionClause
☐ Anyone expected to inspect, test, maintain or operate water mist systemsTrained thoroughly in the functions they are expected to perform12.5.1
☐ Refresher trainingAs recommended by the manufacturer or the AHJ12.5.2

Frequently Asked Questions

How often are water mist nozzles inspected under NFPA 25?

Annually from the floor level and after each system discharge or activation (12.2.1.1, Table 12.1.1.2). A nozzle with leakage, physical damage, loss of bulb fluid, or corrosion, loading or paint detrimental to performance is replaced (12.2.1.1.1). Nozzles in concealed spaces need no inspection (12.2.1.1.4).

When are water mist nozzles tested or replaced?

Automatic nozzles at 10 years, or 5 years in harsh environments, then retested every 5 years (12.3.1.2, 12.3.1.3). Open nozzles in environments with residues on a 1-year basis; open nozzles that cannot be discharged annually at 10 years, then every 5 years (12.3.2.2, 12.3.2.3). Samples are at least 4 automatic or 3 open nozzles, or 1 percent (12.3.1.4, 12.3.2.4).

When is water quality checked?

Water supply quality is inspected semiannually for the first year and annually thereafter (12.2.10.2). Water quality in recirculation tanks is inspected annually, with the tank drained, flushed and refilled as necessary (12.2.8.3). A water tank supplying a water mist system is drained and refilled annually (12.4.1.7).

How often are cylinder pressures checked?

At a minimum monthly for compressed gas cylinders not electrically supervised and semiannually for supervised ones, or per the manufacturer’s specifications (12.2.5.4.1, 12.2.5.4.2). Discharge-side pressure of a high-pressure water container is checked annually (12.2.5.4.3). DOT/CTC cylinders more than 5 years past their last test are not recharged without retesting (12.3.6.1).

How many spare water mist nozzles must be kept?

Never fewer than three (12.4.2.3). For thermally activated nozzles: at least 3 for systems under 50 nozzles, 6 for 50 to 300, 12 for 301 to 1000 and 24 for over 1000 (12.4.2.3.3). The cabinet is where temperature never exceeds 100 °F (38 °C), with a nozzle wrench per type where the manufacturer requires (12.4.2.3.2, 12.4.2.4).

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Standards & References

NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 12 (12.1–12.5) and Table 12.1.1.2. The content of Chapters 6, 7, 8, 9, 13, 14 and 15 and of NFPA 72, NFPA 750 and CGA C-6 referenced by Chapter 12 is not reproduced here.