This article in the NFPA 25 series covers Chapter 12: water mist systems installed to NFPA 750 or another approved installation standard. In water mist the nozzles and strainers are small and pressures are high, so unlike the sprinkler chapter this one has separate lines for cylinders, water quality, filters, pneumatic valves and high-pressure hoses. For pump testing see the fire pump checklist; for common components and valves that Chapter 12 does not address see the valves and common components checklist; for tanks see the water storage tank checklist. Nozzle inspection follows the same logic as the sprinkler checklist, but frequencies and sample sizes differ. Every line carries its clause number from NFPA 25-2026.
In short: Nozzles are inspected from the floor level annually and after each discharge (12.2.1, Table 12.1.1.2). Automatic nozzles are replaced or sample-tested at 10 years (5 years in harsh environments) and retested every 5 years; the sample is at least 4 nozzles or 1 percent (12.3.1). Gas cylinder pressure is checked monthly where not electrically supervised and semiannually where supervised (12.2.5.4). Water quality is inspected semiannually in the first year, then annually (12.2.10.2). Open-nozzle systems are operated annually (12.3.16); hoses are tested every 5 years at 1½ times maximum container pressure (12.3.10). At least 3 spare nozzles are kept on the premises (12.4.2.3).
A. Scope and general rules
Chapter 12 gives the minimum requirements for routine inspection, testing and maintenance of water mist systems installed to NFPA 750 or another approved installation standard (12.1.1.1). Minimum frequencies come from Table 12.1.1.2 (12.1.1.2).
| Check | Criterion | Clause |
| ☐ Common components and valves (where Chapter 12 gives no criteria) | Chapter 13 applies | 12.1.2 |
| ☐ Impairment to protection | Follow the procedures of Chapter 15 | 12.1.3 |
| ☐ Hose connections | Inspected, tested and maintained per Chapters 6 and 13 | 12.1.4 |
B. Frequency summary: Table 12.1.1.2
The standard’s water mist summary table is reproduced in full below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the chapter or standard in the right-hand column. Paired frequencies such as “Quarterly/annually” mean the referenced clause sets two frequencies for two cases (for example supervised and unsupervised levels).
| Item | Frequency | Reference |
| Inspection |
| Additive storage cylinders | Quarterly/semiannually | 12.2.7 |
| Air compressors and receivers | — | Chapter 13 |
| Backflow preventers | — | Chapter 13 |
| High-pressure storage cylinder assemblies (gas and water): securement | Quarterly/annually | 12.2.5.1.1, 12.2.5.1.2 |
| High-pressure storage cylinder assemblies (gas and water): external | Every 5 years | 12.2.5.2 |
| High-pressure storage cylinder assemblies (gas and water): specification, capacity and pressure rating | Annually | 12.2.5.3 |
| High-pressure storage cylinder assemblies (gas and water): cylinder pressure | Monthly/semiannually | 12.2.5.4.1, 12.2.5.4.2 |
| High-pressure storage cylinder assemblies (gas and water): discharge pressure | Annually | 12.2.5.4.3 |
| High-pressure storage cylinder assemblies (gas and water): manually operated indicating control valves | Semiannually | 12.2.5.8 |
| High-pressure storage cylinder assemblies (gas and water): hoses | Annually | 12.2.5.9 |
| High-pressure storage cylinder assemblies (gas and water): filters | Quarterly/annually | 12.2.5.7 |
| Control equipment | — | NFPA 72 |
| Detection systems | — | NFPA 72 |
| Enclosure features, interlocks | Semiannually | 12.2.11 |
| Fire pump system | — | Chapter 8 |
| Gauges (piping system) | — | Chapter 13 |
| Hangers, braces and supports | Annually | 12.2.4 |
| Internal piping conditions | — | Chapter 14 |
| Nozzles | Annually and after each system discharge or activation | 12.2.1 |
| Pneumatically operated valves and tubing | Semiannually | 12.2.6 |
| Pneumatically operated standby pumps | Monthly | 12.2.9 |
| Strainers and filters | After each operation or flow test | 12.2.2 |
| System control valves | — | Chapter 13 |
| System piping, tubing and fittings | Annually | 12.2.3 |
| Water recirculation tanks | Monthly/quarterly/annually | 12.2.8 |
| Water storage tanks | — | Chapter 9 |
| Water supply | Quarterly/annually | 12.2.10 |
| Testing |
| Additives and injection system | Annually | 12.3.4, 12.3.5 |
| Air compressors and receivers | — | Chapter 13 |
| Backflow preventers | — | Chapter 13 |
| Compressed gas storage cylinder | 5–12 years | 12.3.6 |
| Control equipment | Annually | 12.3.7 |
| Detection systems | Annually | 12.3.8 |
| Fire pump system | — | Chapter 8 |
| Gauges (piping system) | — | Chapter 13 |
| Hoses | 5 years | 12.3.10 |
| Interlocks | Annually | 12.3.11 |
| Nozzles, automatic | At 10 years and every 5 years thereafter | 12.3.1.2 |
| Nozzles, automatic (harsh environments) | At 5 years and every 5 years thereafter | 12.3.1.3 |
| Nozzles, open | At 10 years and every 5 years thereafter | 12.3.2.3 |
| Nozzles, open (harsh environments) | Annually | 12.3.2.2 |
| Pneumatic valves | Semiannually | 12.3.12 |
| Pneumatic valve solenoid releases | Annually | 12.3.13 |
| Pneumatically operated standby pumps | Annually | 12.3.14 |
| Strainers and filters | After each operation or flow test | 12.3.3 |
| System control valves | Annually | 12.3.15 |
| Water mist system | Annually | 12.3.16 |
| Water recirculation tanks | Annually | 12.3.17 |
| Water storage cylinders (high pressure) | 5 years | 12.3.18 |
| Water storage tanks | — | Chapter 9 |
| Water supply | Annually | 12.3.20 |
| Maintenance |
| Air compressors and receivers | — | Chapter 13 |
| Backflow preventers | — | Chapter 13 |
| Control equipment | — | NFPA 72 |
| Detection systems | — | NFPA 72 |
| Fire pump system | — | Chapter 8 |
| Pneumatically operated standby pumps | Every 5 years | 12.4.3 |
| Strainers and filters | After each operation or flow test | 12.2.2 |
| Water mist system | Annually | 12.4.1 |
| Water tanks | Annually | 12.4.1 |
C. Water mist nozzle inspection
Water mist nozzles are inspected annually from the floor level (12.2.1.1). A nozzle showing any of the following is replaced (12.2.1.1.1):
| Check | Criterion | Clause |
| ☐ Leakage | Replace if present | 12.2.1.1.1(1) |
| ☐ Corrosion | Replace if detrimental to nozzle performance | 12.2.1.1.1(2) |
| ☐ Physical damage | Replace if present | 12.2.1.1.1(3) |
| ☐ Glass bulb heat-responsive element | Replace if fluid has been lost; a nozzle whose bulb is partially or fully empty is replaced | 12.2.1.1.1(4), 12.2.1.1.3 |
| ☐ Loading | Replace if detrimental to nozzle performance | 12.2.1.1.1(5) |
| ☐ Paint | Replace if applied by anyone other than the nozzle manufacturer and detrimental to performance | 12.2.1.1.1(6) |
| ☐ Nozzle installed in the incorrect orientation | Correct by repositioning the branch line, drop or sprig, or replace | 12.2.1.1.2 |
| ☐ Nozzles in concealed spaces such as above suspended ceilings | No inspection required | 12.2.1.1.4 |
| ☐ Nozzles in areas inaccessible for safety due to process operations | Inspected during each scheduled shutdown | 12.2.1.1.5 |
| ☐ Stock, furnishings or equipment closer than the manufacturer’s installation clearance | Corrected | 12.2.1.1.6 |
| ☐ Open nozzles after water discharge from installed nozzles | Removed, inspected and cleaned, including their strainers | 12.2.1.1.7 |
| ☐ Supply of spare automatic nozzles | Inspected annually for the number and type required by NFPA 750 | 12.2.1.2 |
D. Strainers, piping and hangers
| Check | Criterion | Clause |
| ☐ Individual nozzle strainers and filters | Inspected and cleaned after each operation or flow test | 12.2.2.1 |
| ☐ All strainers and filters | Inspected and cleaned per the manufacturer’s instructions | 12.2.2.2 |
| ☐ Damaged or corroded parts or assemblies | Replaced or repaired | 12.2.2.3 |
| ☐ Distribution piping, tubing and fittings | Inspected annually from the floor level | 12.2.3.1 |
| ☐ Condition of piping, tubing and fittings | Free of mechanical damage, leakage and corrosion | 12.2.3.2 |
| ☐ External loads | No materials resting on or hung from the pipe | 12.2.3.3 |
| ☐ Piping, tubing and fittings in concealed spaces | No inspection required | 12.2.3.4 |
| ☐ Piping, tubing and fittings inaccessible due to process operations | Inspected during each scheduled shutdown | 12.2.3.5 |
| ☐ Hangers, braces and supports | Inspected annually from the floor level; not damaged, loose or unattached | 12.2.4.1, 12.2.4.2 |
| ☐ Damaged, loose or unattached hangers and supports | Replaced or refastened | 12.2.4.3 |
| ☐ Hangers in concealed spaces | No inspection required | 12.2.4.4 |
| ☐ Hangers inaccessible due to process operations | Inspected during each scheduled shutdown | 12.2.4.5 |
E. High-pressure storage cylinders (gas and water)
| Check | Criterion | Clause |
| ☐ Cylinders and mounting brackets | Fastened securely per the manufacturer’s requirements | 12.2.5.1 |
| ☐ Securement of compressed gas cylinders | Inspected quarterly | 12.2.5.1.1 |
| ☐ Securement of high-pressure water cylinders | Inspected annually | 12.2.5.1.2 |
| ☐ Compressed gas cylinders in continuous service without discharging | Complete external visual inspection every 5 years or more often if required, per Section 3 of CGA C-6, except cylinders need not be emptied or stamped while under pressure; competent personnel only | 12.2.5.2–12.2.5.2.2 |
| ☐ Record of the external inspection | On a record tag permanently attached to each cylinder and on a suitable inspection report; a copy furnished to the owner or authorized representative; retained for the life of the system | 12.2.5.2.3–12.2.5.2.3.2 |
| ☐ Cylinder specification, capacity and pressure rating | Visually inspected annually | 12.2.5.3 |
| ☐ Pressure in high-pressure storage containers | Within the water mist manufacturer’s specifications | 12.2.5.4 |
| ☐ Pressure of electrically supervised and monitored compressed gas cylinders | At a minimum semiannually, or per the manufacturer’s specifications | 12.2.5.4.1 |
| ☐ Pressure of compressed gas cylinders not electrically supervised | At a minimum monthly, or per the manufacturer’s specifications | 12.2.5.4.2 |
| ☐ Cylinder pressure on the discharge side of a high-pressure water container | Annually | 12.2.5.4.3 |
| ☐ Water level in high-pressure containers | Within the manufacturer’s specifications; unsupervised levels inspected quarterly, supervised levels semiannually | 12.2.5.5–12.2.5.5.2 |
| ☐ Vent plugs on high-pressure water containers | Annually, visually confirm the vent is not ruptured or open | 12.2.5.6 |
| ☐ Filter on high-pressure water containers | Annually, visually confirm it is clean | 12.2.5.7 |
| ☐ Manually operated indicating control valves | Visually confirmed in proper position at a minimum semiannually, or per the manufacturer’s specifications | 12.2.5.8 |
| ☐ All hoses used as part of the system | Visually inspected annually for damage | 12.2.5.9 |
F. Pneumatic valves, additive cylinders, recirculation tanks and standby pumps
| Check | Criterion | Clause |
| ☐ Pneumatically operated valves and pneumatic tubing | Visually inspected at a minimum semiannually, or per the manufacturer’s specifications | 12.2.6 |
| ☐ Additive storage cylinder | Visually inspected quarterly for external corrosion or damage | 12.2.7.1 |
| ☐ Quantity of additive agent | Inspected semiannually | 12.2.7.2 |
| ☐ Recirculation tank attachments and supports | Secured per the manufacturer’s requirements | 12.2.8.1 |
| ☐ Water level in recirculation tanks | Within the manufacturer’s specifications; unsupervised levels inspected monthly, supervised levels quarterly | 12.2.8.2–12.2.8.2.2 |
| ☐ Water quality in recirculation tanks | Inspected annually; drained, flushed and refilled as necessary | 12.2.8.3 |
| ☐ Recirculation tank filters, strainers and cyclone separator | Visually inspected annually and cleaned as necessary | 12.2.8.4 |
| ☐ Pneumatic standby pump: moisture trap | Visually inspected and emptied monthly | 12.2.9.1 |
| ☐ Pneumatic standby pump: compressed gas supply and inlet air pressure | Visually inspected monthly per the manufacturer’s specifications | 12.2.9.2 |
| ☐ Pneumatic standby pump: outlet water (standby) pressure | Visually inspected monthly per the manufacturer’s specifications | 12.2.9.3 |
| ☐ Oil level on air regulator units | Visually inspected monthly per the manufacturer’s specifications | 12.2.9.4 |
G. Water supply, water quality, enclosures and interlocks
| Check | Criterion | Clause |
| ☐ Water supply pressure | Quarterly, visually confirmed within the water mist manufacturer’s specifications | 12.2.10.1 |
| ☐ Water quality | Inspected semiannually for the first year, then annually | 12.2.10.2 |
| ☐ Integrity of the enclosure and interlocks | Inspected semiannually | 12.2.11 |
H. Nozzle sample testing
Where required by this section, sample automatic nozzles are submitted for functional testing to an approved testing laboratory acceptable to the AHJ (12.3.1.1).
| Nozzle | Replacement or first test | Retest | Clause |
| Automatic nozzles | After 10 years installed | Every 5 years | 12.3.1.2 |
| Automatic nozzles in harsh environments, including corrosive atmospheres and corrosive water supplies | Replaced or sample-tested on a 5-year basis | Every 5 years | 12.3.1.3 |
| Open nozzles in environments with residues, including corrosive atmospheres and corrosive water supplies | Replaced or sample-tested on a 1-year basis | Annually | 12.3.2.2 |
| Open nozzles where water cannot be discharged annually and not covered by 12.3.2.2 | After 10 years in service | Every 5 years | 12.3.2.3 |
| Check | Criterion | Clause |
| ☐ Automatic nozzle sample | At least 4 nozzles or 1 percent of the nozzles per individual sample, whichever is greater | 12.3.1.4 |
| ☐ Open nozzle sample | At least 3 nozzles or 1 percent, whichever is greater | 12.3.2.4 |
| ☐ One nozzle in a sample fails | All nozzles in the area represented by that sample are replaced | 12.3.1.5, 12.3.2.5 |
| ☐ Automatic nozzles to be replaced | Per 12.4.2 | 12.3.1.6 |
| ☐ Nozzles in spray areas and mixing rooms of resin application areas without protective coverings | Capable of operating and protecting the hazard with overspray residue in the event of a fire | 12.3.2.1 |
I. Strainers, additives and operational test with additives
| Check | Criterion | Clause |
| ☐ System strainers (basket or screen) | Flushed until clear after each operation or flow test | 12.3.3 |
| ☐ Additive | Samples submitted per the manufacturer’s sampling procedures for evaluation of quality to its specification | 12.3.4 |
| ☐ Additive injection rate | Operational tests confirm it responds as designed, automatically and manually; procedures simulate anticipated emergency events | 12.3.5.1, 12.3.5.2 |
| ☐ Discharge would be hazardous or conflict with local requirements | Approved alternate method to achieve full-flow conditions allowed | 12.3.5.3 |
| ☐ Full-flow test of a system with additive | May use water only in lieu of the additive | 12.3.5.4 |
| ☐ Automatic fire detection | Operates within NFPA 72 for the detector type when exposed to a test source; response time recorded | 12.3.5.5 |
| ☐ Open discharge devices | Time lapse between detection operation and water delivery recorded | 12.3.5.6 |
J. Compressed gas cylinders, control equipment and detection
| Check | Criterion | Clause |
| ☐ Gas cylinders designed to US DOT, Canadian Transport Commission (CTC) or similar rules | Not recharged without retesting if more than 5 years since the last test; retest per DOT, CTC or similar design and requalification regulations | 12.3.6.1, 12.3.6.2 |
| ☐ Test report | Completed copy furnished to the owner or authorized representative; retained for the life of the system | 12.3.6.3, 12.3.6.4 |
| ☐ Control equipment | Operational tests confirm response as designed, automatically and manually; annual operational testing per NFPA 72; approved alternate full-flow method where discharge is hazardous | 12.3.7.1–12.3.7.3 |
| ☐ Detection systems | Operational tests; annual operational testing of initiating devices per NFPA 72; detectors operate within NFPA 72 when exposed to a test source and response time is recorded; time to water delivery recorded for open devices | 12.3.8.1–12.3.8.4 |
K. Pumps, gas-driven systems and hose testing
| Check | Criterion | Clause |
| ☐ Fire pumps | Tested per Section 8.3 | 12.3.9.1 |
| ☐ Systems powered or operated by pressurized gas (normally air or nitrogen) cylinders or pressure vessels | Tested quarterly or as determined by an approved risk analysis per the manufacturer’s specifications, using gas and water from the primary cylinders, vessels or tanks or from temporary test cylinders or tanks, to verify nozzle flows on operation (no blockage, fully developed spray pattern) | 12.3.9.2 |
| ☐ All hose | Tested every 5 years | 12.3.10.1 |
| ☐ Hose test pressure | 1½ times the maximum container pressure at 130 °F (54.4 °C) | 12.3.10.2 |
The hose testing procedure is as follows (12.3.10.3):
- The hose is removed from any attachment.
- The hose assembly is placed in a protective enclosure designed to permit visual observation of the test.
- The hose is completely filled with water before testing.
- Pressure is applied at a rate of rise that reaches test pressure within 1 minute; test pressure is held for 1 full minute; distortion or leakage is noted.
- If pressure has not dropped and couplings have not moved, pressure is released; the assembly passes if no permanent distortion has taken place.
- A passing hose is completely dried internally; if heat is used, the temperature does not exceed the manufacturer’s specifications.
- Assemblies failing the test are marked, destroyed and replaced with new assemblies.
- Each passing assembly is marked to show the date of test.
L. Interlocks, pneumatic valves, standby pumps and control valves
| Check | Criterion | Clause |
| ☐ Ventilation interlock (if required) | Operation confirmed by annual testing | 12.3.11.1 |
| ☐ Fuel or lubrication system interlock (if required) | Operation confirmed by annual testing | 12.3.11.2 |
| ☐ Pneumatic valves | Operational tests confirm response as designed, automatically and manually | 12.3.12.1 |
| ☐ Slave valves and valves intended to cycle on–off | Semiannual operation test per the manufacturer’s instructions | 12.3.12.2 |
| ☐ Pneumatic cylinder release valves | Reset after testing | 12.3.12.3, 12.3.13 |
| ☐ Pneumatic valve solenoid releases | Operational tests confirm automatic and manual response; electric release and manual release tested annually per the manufacturer’s instructions | 12.3.13.1, 12.3.13.2 |
| ☐ Pumps that are not main pressure pumps (booster, jockey or transfer) | Operated to demonstrate support of their design function for the main pressure pumps | 12.3.14.1 |
| ☐ Standby pumps | Operated at least annually to demonstrate system flow support when the main pressure pumps are tested | 12.3.14.2 |
| ☐ Control valve for each zone of protection | Operated annually through its full range and returned to its normal position | 12.3.15 |
M. Annual operational test of open-nozzle systems
Water mist systems are operated annually per 12.3.16.1 through 12.3.16.8 and the manufacturer’s instructions (12.3.16).
| Check | Criterion | Clause |
| ☐ Test preparation | Precautions taken to prevent damage to property | 12.3.16.1 |
| ☐ System response | Operational tests confirm the system responds as designed, automatically and manually | 12.3.16.2.1 |
| ☐ Water cannot be discharged into the occupancy or onto the hazard | Operational test from a test connection with an orifice simulating a flow equal to or greater than that of the total number of nozzles in the protected space | 12.3.16.2.2 |
| ☐ Response time | Detection operates within the acceptance test specifications and 12.3.7; response times recorded | 12.3.16.3.1, 12.3.16.3.2 |
| ☐ Discharge time | Time lapse between detection operation and water delivery recorded | 12.3.16.4 |
| ☐ Discharge patterns | From all open nozzles, observed to be unimpeded by plugged nozzles, nozzles correctly positioned and obstructions not preventing full development | 12.3.16.5.1 |
| ☐ Water cannot be discharged | Nozzle orientation inspected and system tested with air to confirm nozzles are not obstructed | 12.3.16.5.2 |
| ☐ Obstructions found | Piping and nozzles cleaned and the system retested | 12.3.16.5.3 |
| ☐ Pressure readings | Recorded at the hydraulically most remote nozzle or test connection; with a deluge valve, a second reading at the deluge valve; compared with the hydraulic design pressures | 12.3.16.6.1–12.3.16.6.3 |
| ☐ Most remote nozzle inaccessible | Nozzles may be checked visually without a pressure reading at that nozzle | 12.3.16.6.3.1 |
| ☐ Riser reading indicates the water supply has deteriorated | A gauge is placed on the hydraulically most remote nozzle and compared with the required design pressure | 12.3.16.6.3.2 |
| ☐ Multiple systems | Maximum number of systems expected to operate in a fire tested simultaneously to check the water supply | 12.3.16.7 |
| ☐ Return to service | After the full-flow test, system returned to service per the manufacturer’s instructions | 12.3.16.8 |
N. Recirculation tanks, high-pressure water cylinders and water supply testing
| Check | Criterion | Clause |
| ☐ Water recirculation tanks | Operational tests confirm response as designed, automatically and manually | 12.3.17.1 |
| ☐ Float-operated valves and backflow prevention device (when present) | Annual operation test per the manufacturer’s instructions | 12.3.17.2 |
| ☐ Recirculation tank outlet | Pressure reading recorded during the operational discharge test | 12.3.17.3 |
| ☐ Water cylinders under high pressure that deliver the mist, become pressurized at activation, or serve as the water source | Tested per the applicable current pressure vessel standard or code | 12.3.18.1 |
| ☐ Water cylinders designed to DOT, CTC or similar rules | Not recharged without retesting if more than 5 years since the last test | 12.3.18.2 |
| ☐ Test report | Copy furnished to the owner or authorized representative; retained for the life of the system | 12.3.18.3, 12.3.18.4 |
| ☐ Water storage tanks or cylinders | Tested per Section 9.3 | 12.3.19 |
| ☐ Water supply | Annually per Section 7.3 to verify the source pressure, flow, quantity and duration | 12.3.20 |
O. Maintenance: general
| Check | Criterion | Clause |
| ☐ Purpose | Keep the system equipment operable or make repairs | 12.4.1.1 |
| ☐ Devices not described in this standard, where the manufacturer requires | Maintained | 12.4.1.1.1 |
| ☐ Records | As-built drawings, original acceptance test records and device maintenance bulletins retained | 12.4.1.2 |
| ☐ Replacement and spare components | Per the manufacturer’s specifications and original design; accessible and stored to prevent damage or contamination | 12.4.1.3, 12.4.1.4 |
| ☐ After each system operation | A representative sample of operated nozzles in the activated zone inspected | 12.4.1.5 |
| ☐ After each operation due to fire | System filters and strainers cleaned or replaced | 12.4.1.6 |
| ☐ Water tank supplying a water mist system | Drained and refilled annually | 12.4.1.7 |
| ☐ Water mist system with open nozzles | Flushed annually | 12.4.1.8 |
P. Nozzle replacement and spare nozzles
| Check | Criterion | Clause |
| ☐ Replacement nozzles | Proper characteristics for the application, including model and temperature rating; new nozzles only | 12.4.2.1, 12.4.2.2 |
| ☐ Spare nozzle supply | Never fewer than three on the premises, so operated or damaged nozzles can be promptly replaced | 12.4.2.3 |
| ☐ Type of spares | Correspond to the manufacturers, models and temperature ratings in the property | 12.4.2.3.1 |
| ☐ Spare automatic nozzle cabinet | Where the temperature never exceeds 100 °F (38 °C) | 12.4.2.3.2 |
| ☐ Systems with fewer than 50 nozzles | Not fewer than 3 spare thermally activated nozzles | 12.4.2.3.3(1) |
| ☐ Systems with 50 to 300 nozzles | Not fewer than 6 | 12.4.2.3.3(2) |
| ☐ Systems with 301 to 1000 nozzles | Not fewer than 12 | 12.4.2.3.3(3) |
| ☐ Systems with over 1000 nozzles | Not fewer than 24 | 12.4.2.3.3(4) |
| ☐ Content of the spare stock | All types and ratings installed | 12.4.2.3.3 |
| ☐ Special nozzle wrench (where the manufacturer requires) | Kept in the cabinet; one per nozzle type installed | 12.4.2.4, 12.4.2.4.1 |
| ☐ Nozzles with protective coverings in resin application areas | Continue to be protected against overspray: cellophane bags 0.003 in. (0.076 mm) thick or less, or thin paper bags; coverings replaced periodically before heavy deposits accumulate | 12.4.2.5.1–12.4.2.5.3 |
| ☐ Alterations | No alteration, ornamentation, paint or coating after shipment from the manufacturer | 12.4.2.6 |
| ☐ Automatic nozzles protecting commercial cooking equipment and ventilating systems | Replaced annually; not required where annual examination shows no buildup of grease or other material | 12.4.2.7, 12.4.2.7.1 |
| ☐ Pneumatically operated standby pumps | Rebuilt every 5 years or as specified by the manufacturer | 12.4.3 |
Q. Training
| Check | Criterion | Clause |
| ☐ Anyone expected to inspect, test, maintain or operate water mist systems | Trained thoroughly in the functions they are expected to perform | 12.5.1 |
| ☐ Refresher training | As recommended by the manufacturer or the AHJ | 12.5.2 |
Frequently Asked Questions
How often are water mist nozzles inspected under NFPA 25?
Annually from the floor level and after each system discharge or activation (12.2.1.1, Table 12.1.1.2). A nozzle with leakage, physical damage, loss of bulb fluid, or corrosion, loading or paint detrimental to performance is replaced (12.2.1.1.1). Nozzles in concealed spaces need no inspection (12.2.1.1.4).
When are water mist nozzles tested or replaced?
Automatic nozzles at 10 years, or 5 years in harsh environments, then retested every 5 years (12.3.1.2, 12.3.1.3). Open nozzles in environments with residues on a 1-year basis; open nozzles that cannot be discharged annually at 10 years, then every 5 years (12.3.2.2, 12.3.2.3). Samples are at least 4 automatic or 3 open nozzles, or 1 percent (12.3.1.4, 12.3.2.4).
When is water quality checked?
Water supply quality is inspected semiannually for the first year and annually thereafter (12.2.10.2). Water quality in recirculation tanks is inspected annually, with the tank drained, flushed and refilled as necessary (12.2.8.3). A water tank supplying a water mist system is drained and refilled annually (12.4.1.7).
How often are cylinder pressures checked?
At a minimum monthly for compressed gas cylinders not electrically supervised and semiannually for supervised ones, or per the manufacturer’s specifications (12.2.5.4.1, 12.2.5.4.2). Discharge-side pressure of a high-pressure water container is checked annually (12.2.5.4.3). DOT/CTC cylinders more than 5 years past their last test are not recharged without retesting (12.3.6.1).
How many spare water mist nozzles must be kept?
Never fewer than three (12.4.2.3). For thermally activated nozzles: at least 3 for systems under 50 nozzles, 6 for 50 to 300, 12 for 301 to 1000 and 24 for over 1000 (12.4.2.3.3). The cabinet is where temperature never exceeds 100 °F (38 °C), with a nozzle wrench per type where the manufacturer requires (12.4.2.3.2, 12.4.2.4).
SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App Store
Standards & References
NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 12 (12.1–12.5) and Table 12.1.1.2. The content of Chapters 6, 7, 8, 9, 13, 14 and 15 and of NFPA 72, NFPA 750 and CGA C-6 referenced by Chapter 12 is not reproduced here.