This article in the NFPA 25 series covers Chapter 4, the general requirements that every other chapter sits on. Each task in the fire pump, sprinkler or valve checklists gets its answer here: who does it, how it is recorded, when the AHJ is notified and under which safety precautions. Owner responsibility, freeze protection, notification, corrections and repairs, records, automated and remote inspection, performance-based programs and safety follow in order, with a short section on Chapter 16 at the end. Every line carries its NFPA 25-2026 clause number.

In short: The property owner or designated representative is responsible for inspection, testing, maintenance and impairment management (4.1.1). The work is done by personnel qualified for the specific task (4.1.1.3). Water-filled piping subject to freezing is kept at 40 °F (4 °C) minimum (4.1.2). The AHJ, the fire department where required and the alarm-receiving facility are notified of impairments and before tests or shutdowns (4.1.4). Records stay with the owner; ITM records are kept at least 1 year after the next task of the same type, and as-built drawings and acceptance test records for the life of the system (4.3.4, 4.3.5). Where automated testing is used, it is observed at least once every 3 years (4.6.1.1).

A. What do the frequencies mean? (Chapter 3, 3.7)

Every frequency in the standard is defined by a minimum and maximum time between events (3.7.1). These definitions apply to the whole series: an “annual” task is not done before 9 months have passed and not later than 15 months.

FrequencyDefinitionClause
DailyEvery day3.7.1.1
WeeklyOnce per calendar week3.7.1.2
MonthlyOnce per calendar month3.7.1.3
QuarterlyFour times per year; minimum 2 months, maximum 4 months apart3.7.1.4
SemiannualTwice per year; minimum 4 months, maximum 8 months apart3.7.1.5
AnnualOnce per year; minimum 9 months, maximum 15 months apart3.7.1.6
Three yearsOnce every 36 months; minimum 30, maximum 40 months3.7.1.7
Five yearsOnce every 60 months; minimum 54, maximum 66 months3.7.1.8

B. Owner responsibility

CheckCriterionClause
☐ Inspection, testing, maintenance and impairment managementThe property owner or designated representative is responsible per this standard4.1.1
☐ ProceduresImplemented per this standard and the manufacturer’s instructions4.1.1.1
☐ Manufacturers’ literatureAvailable for inspecting, testing and maintaining valves and associated equipment4.1.1.2
☐ Who performs the workPersonnel qualified for the specific tasks4.1.1.3
☐ Water damageOwner coordinates with the entity doing the work to minimize damage from discharged water4.1.1.4
☐ Owner is not the occupantAuthority for ITM and impairment management may be delegated to a designated representative4.1.1.5
☐ Designated representative holding that authorityComplies with all requirements the standard places on the owner4.1.1.6
☐ AccessibilityReady access to components requiring inspection, testing and maintenance4.1.3
☐ Control valve locationIdentified at the system riser or other approved location(s)4.1.9

C. Freeze protection

For the field side of cold-weather preparation see winterizing sprinkler systems; the requirements below are Chapter 4 itself.

CheckCriterionClause
☐ Water-filled piping subject to freezingKept at 40 °F (4 °C) minimum unless an antifreeze solution complying with Chapter 5 is used4.1.2
☐ Building areas with water-filled piping and no other freeze protection40 °F (4 °C) minimum4.1.2.1
☐ Piping in unconditioned spaces or outside the building envelope that is not subject to freezing4.1.2 does not apply4.1.2.2
☐ Aboveground pipes through open areas, cold rooms or passageways below 40 °F (4 °C), protected by insulation, frostproof casings, listed heat tracing or other reliable meansKept between 40 °F (4 °C) and 120 °F (48.9 °C)4.1.2.3
☐ Other approved freeze protection means of 4.1.2.3Inspected, tested and maintained per this standard4.1.2.4
☐ Preaction, deluge and dry pipe valve enclosures subject to freezingInspected daily during cold weather: 40 °F (4 °C) minimum4.1.2.5
☐ Valve enclosures with low-temperature alarmsMay be inspected weekly4.1.2.5.1
☐ Low-temperature alarms in valve enclosuresAnnually, toward the beginning of the heating season before freezing: free of physical damage4.1.2.5.2
☐ Ice found in piping between the water supply and discharge devices or hose connectionsSystem is considered impaired4.1.2.6.1
☐ Components found to contain iceCompletely thawed or replaced, and the system restored to service4.1.2.6.2

D. Notification: impairments, shutdowns and tests

CheckCriterionClause
☐ Impairment identified, or before testing or shutting down a system or its supplyNotify the AHJ, the fire department where required, and the alarm-receiving facility4.1.4
☐ Preplanned and emergency impairmentsNotification required for both4.1.4.1
☐ Content of the notificationInclude additional information required by 15.5.2 as applicable4.1.4.1.1
☐ Shutdown or test notificationPurpose, system or component involved, estimated time and expected duration4.1.4.2
☐ System, supply or component returned to service, or test completeAHJ, fire department and alarm-receiving facility notified again4.1.4.3

The impairment procedure itself is in Chapter 15, covered in the series’ impairment management article.

E. Dry pipe and preaction systems designed with increased C values

CheckCriterionClause
☐ Dry pipe or preaction system using C = 120 through a technology permitted by NFPA 13 (nitrogen generator, vapor corrosion inhibitor, negative pressure system or other approved technology)The approved corrosion mitigation system is inspected, tested and maintained per NFPA 25 and the manufacturer’s instructions4.1.5.1
☐ Impairments, critical or noncritical deficiencies found in these systemsDeficiencies corrected within a time frame approved by the AHJ; until impairments are corrected an approved impairment program per Chapter 15 is implemented4.1.5.2
☐ Corrosion mitigation system not replaced per NFPA 13 to keep the increased C valueSystem hydraulically recalculated with the lower C value and modified as necessary4.1.5.3
☐ Corrosion mitigation system deficient or impaired and 4.1.5.3 not metRepaired or replaced with a corrosion mitigation system permitted by NFPA 13 for C = 1204.1.5.4

F. Corrections, repairs and recalled products

CheckCriterionClause
☐ Deficiencies and impairmentsCorrected or repaired by the owner or designated representative4.1.6.1
☐ Component under a recall or replacement program discoveredMaintenance personnel, designated representative or contractor notifies the owner in writing4.1.6.1.1
☐ Components and equipment under recall or replacement programsCorrected, remedied, repaired or replaced by the owner or designated representative4.1.6.1.2
☐ Who performs corrections and repairsQualified personnel4.1.6.2
☐ Manufacturer’s corrective actionWhere acceptable to the AHJ, a manufacturer may modify its own listed product in the field with listed devices that restore the original listed performance4.2

G. When occupancy, process or materials change

The owner does not change the occupancy, use, process, or materials used or stored without evaluating whether the fire protection system can protect the new condition (4.1.7). This evaluation is not part of normal ITM (4.1.7.1). It considers at least the following factors (4.1.7.2):

CheckCriterionClause
☐ Occupancy changeE.g., converting office or production space into warehousing4.1.7.2(1)
☐ Process or material changeE.g., metal stamping to molded plastics4.1.7.2(2)
☐ Building revisionsRelocated walls, added mezzanines, ceilings added below sprinklers4.1.7.2(3)
☐ HeatingRemoval of heating in spaces with piping subject to freezing4.1.7.2(4)
☐ StorageChanges to storage method, arrangement, height or commodities4.1.7.2(5)
☐ Water supplyChanges in water supplies4.1.7.2(6)
☐ A change affecting the installation criteria is identifiedOwner or designated representative promptly evaluates the adequacy of the installed system4.1.8.1
☐ Evaluation shows the system is inadequateRequired corrections are made4.1.8.2
☐ CorrectionsApproved4.1.8.3

H. Information sign and antifreeze information sign

CheckCriterionClause
☐ Information signPermanently marked metal or rigid plastic sign at each system riser4.1.10.1
☐ AttachmentCorrosion-resistant wire, chain or other approved means4.1.10.2
☐ Sign content (1)Location of the area served by the system4.1.10.2(1)
☐ Sign content (2)Location of auxiliary drains and low-point drains for dry pipe and preaction systems4.1.10.2(2)
☐ Sign content (3)Presence and location of antifreeze or other auxiliary systems4.1.10.2(3)
☐ Sign content (4)Presence and location(s) of heat tape4.1.10.2(4)
☐ Sign content (5)Location of control valves as required by 13.3.1.14.1.10.2(5)
☐ Existing nonlisted premixed antifreeze permitted to remain (5.3.4.4.2, 5.3.4.4.3)Sign on the antifreeze system control valve: manufacturer type and brand, concentration by volume, volume of solution in the system4.1.11.1
☐ Listed antifreeze solutionsSign on the antifreeze system main valve: manufacturer type and brand, minimum use temperature, volume of solution in the system4.1.11.2

I. Impairments and inactive system components

CheckCriterionClause
☐ Impairment occurs or is identified during ITMChapter 15 procedures are followed, including tagging the impaired system4.1.12.1
☐ Return to service after an impairmentVerified by an appropriate inspection or test per the component replacement (action) summary table in the applicable chapter4.1.12.2
☐ Inactive system or part of a system abandoned in placeComponents including sprinklers, hose valves and hoses, and alarm devices are removed (extracted from NFPA 13)4.1.13.1
☐ Control valves abandoned in placeOperating mechanisms removed4.1.13.2
☐ Sprinkler piping and/or valves abandoned in placeUniquely identified to differentiate them from active piping and valves4.1.13.3

The “component action” tables that 4.1.12.2 and 4.6.5 point to sit at the end of each system chapter: Table 5.5.1 for sprinkler systems (Chapter 5 article) and Table 13.13.1 for valves and common components (Chapter 13 article). Which inspection or test is needed on return to service after an impairment is read from these tables; simply reopening the valve and calling the system “in service” is not enough.

J. Records

CheckCriterionClause
☐ What is recordedAll inspections, tests and maintenance of the system and its components4.3.1
☐ Who keeps the recordsThe property owner4.3.1.1
☐ Electronic storageRecords may be stored and accessed electronically4.3.1.2
☐ Record content (1)The procedure/activity performed (inspection, test or maintenance)4.3.2(1)
☐ Record content (2)The organization that performed the activity4.3.2(2)
☐ Record content (3)The required frequency of the activity4.3.2(3)
☐ Record content (4)The results and date of the activity4.3.2(4)
☐ Record content (5)Name and contact information of the qualified contractor or owner, including the qualified personnel performing the activity4.3.2(5)
☐ AHJ requestRecords made available to the AHJ on request4.3.3
☐ As-built drawings, hydraulic calculations, original acceptance test records, device data sheetsRetained for the life of the system4.3.4
☐ ITM recordsRetained at least 1 year after the next inspection, test or maintenance of that type required by the standard4.3.5

K. Water supply, inspection and testing

CheckCriterionClause
☐ Water supplies (including fire pumps) during ITMRemain in service unless under constant attendance by qualified personnel or Chapter 15 impairment procedures are followed4.4
☐ Inspection intervalsComponents inspected at the intervals in the appropriate chapters4.5
☐ Purpose of testingAll components and systems tested to verify they function as intended4.6.1
☐ Automated testing per Section 4.7 in useTesting observed at least once every 3 years4.6.1.1
☐ Automated testing cannot be visually observedTesting conducted manually at least once every 3 years4.6.1.2
☐ Test frequencyPer this standard4.6.2
☐ After testingComponents restored to full operational condition, including reinstalling plugs and caps for auxiliary drains and test valves4.6.3
☐ Test resultsCompared with the original acceptance test (if available) and the most recent test4.6.4
☐ Component or subsystem adjusted, repaired, reconditioned or replacedTested per the original acceptance test for that subsystem or the requirements specified by the standard4.6.5

L. Automated and remote inspection and testing

CheckCriterionClause
☐ Automated inspection and testing procedures performed per this standardPermitted4.7.1
☐ Automated inspection equipment meeting the intent of a visual inspectionMay replace the visual inspection4.7.2
☐ Automated testing equipmentProduces the same action the standard requires to test a device4.7.3
☐ Water dischargeTesting discharges water where required by the standard4.7.4
☐ Automated testing equipment that does not discharge waterPermitted except as required in 4.7.4.24.7.4.1
☐ Visual observation of dischargeAt least once every 3 years4.7.4.2
☐ Where required by the standardPersonnel observe the testing and intervene when necessary to prevent injury or property damage4.7.5
☐ Automated test devices and equipmentListed for the purpose of the test4.7.6
☐ Equipment not subjected to system pressure or not integral to system operation in a fireNot required to be listed4.7.7
☐ Failure of the testing equipmentDoes not impair system operation unless indicated by a supervisory signal per NFPA 724.7.8
☐ Component or system fails an automated testAudible and visual supervisory signal per NFPA 72 or other approved fire alarm code4.7.9
☐ Failure of automated inspection and testing equipmentTrouble signal per NFPA 724.7.10
☐ Component or system failure that impairs the systemImpairment procedures are followed4.7.11
☐ Testing frequenciesMaintained regardless of the functionality of the automated testing equipment4.7.12
☐ RecordsAll inspections and testing recorded per 4.3.24.7.13
☐ Automated inspection and test resultsAnalyzed by qualified personnel4.7.14
☐ Remote inspections and testsPermitted per NFPA 9154.8

M. Performance-based programs and maintenance

CheckCriterionClause
☐ Performance-based programComponents and systems may be inspected, tested and maintained under an approved performance-based program4.9
☐ Program goalsClearly identifiable goals and a clear definition of how the program meets them4.9.1
☐ ComplianceCompliance with an approved program is deemed compliance with this standard4.9.2
☐ ReviewGoals and goal achievement reviewed at least every 3 years; ITM frequencies adjusted to current conditions and the historical record4.9.3
☐ Historical recordAvailable for review by the AHJ4.9.4
☐ Purpose of maintenanceKeep the system equipment operable4.10

N. Safety

CheckCriterionClause
☐ GeneralITM conducted per applicable safety regulations4.11.1
☐ Confined spaces (tanks, valve pits, trenches)Legally required precautions taken before entry4.11.2
☐ Fall protectionLegally required equipment worn or used4.11.3
☐ Other hazardsE.g., protection against drowning when working on top of a filled embankment or supported rubberized fabric tank, or over open water or other liquids4.11.4
☐ Hazardous materials stored on the premisesOwner or designated representative advises anyone performing ITM4.11.5.1
☐ Work where hazardous materials are presentLegally required equipment used4.11.5.2
☐ Testing or maintaining electric controllers for motor-driven fire pumpsLegally required precautions taken4.11.6.1
☐ Electrical safety minimumNFPA 70E or an approved equivalent applied4.11.6.2
☐ Equipment in areas inaccessible for safety reasons due to process operations: inspectionDuring each scheduled shutdown4.11.7.1
☐ Same areas: testingDuring each scheduled shutdown, where approved by the AHJ4.11.7.2
☐ Risk assessment shows a temporary condition will compromise personnel safetyInspection and testing delayed when approved by the AHJ4.11.7.3

O. Chapter 16: special requirements from other NFPA documents

Chapter 16 collects ITM requirements for water-based systems found in other NFPA standards that differ from this standard (16.1.1.1). They are extracted from those referenced standards (16.1.1.2), and where the referenced standard differs from this one, the referenced standard takes precedence (16.1.1.3). Terms not defined in Chapter 3 take the definitions of the reference standard (16.1.2).

CheckCriterionClause
☐ Small residential board and care occupanciesThis section applies only to residential board and care facilities with sprinkler systems installed to NFPA 13D as described in NFPA 10116.2.1
☐ Systems installed to NFPA 13DInspected, tested and maintained per NFPA 10116.2.1.1

For the difference between NFPA 13D and 13R see residential sprinkler standards; the NFPA 101 ITM provisions are not reproduced here.

Frequently Asked Questions

Who is responsible for inspection, testing and maintenance under NFPA 25?

The property owner or designated representative (4.1.1). Where the owner is not the occupant, that authority may be delegated to a designated representative, who then complies with all requirements placed on the owner (4.1.1.5, 4.1.1.6). The work is performed by personnel qualified for the specific tasks (4.1.1.3).

How long are inspection and test records kept?

ITM records are kept at least 1 year after the next inspection, test or maintenance of the same type (4.3.5). As-built drawings, hydraulic calculations, original acceptance test records and device data sheets are kept for the life of the system (4.3.4). Records are maintained by the owner, may be electronic, and are made available to the AHJ on request (4.3.1.1, 4.3.1.2, 4.3.3).

When exactly must an “annual” inspection be done?

Annual means once per year with a minimum of 9 and a maximum of 15 months between events (3.7.1.6). Quarterly is 2–4 months, semiannual 4–8 months, three years 30–40 months and five years 54–66 months (3.7.1.4, 3.7.1.5, 3.7.1.7, 3.7.1.8).

Who must be notified before a system is shut down or tested?

The AHJ, the fire department where required, and the alarm-receiving facility (4.1.4). The notice gives the purpose, the system or component involved, the estimated time and the expected duration (4.1.4.2). The same parties are notified again when the system is back in service or the test is complete (4.1.4.3).

Is manual testing still needed with automated test equipment?

Automated testing is observed at least once every 3 years; where it cannot be visually observed, the test is done manually at least once every 3 years (4.6.1.1, 4.6.1.2). For automated tests that do not discharge water, discharge is visually observed at least every 3 years (4.7.4.2). The standard’s test frequencies are kept regardless of whether the automated equipment works (4.7.12).

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Standards & References

NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 3 (3.7 frequency definitions), Chapter 4 (4.1–4.11) and Chapter 16 (16.1–16.2). The content of Chapters 5, 13 and 15 and of NFPA 13, NFPA 13D, NFPA 70E, NFPA 72, NFPA 101 and NFPA 915 referenced by Chapter 4 is not reproduced here.