This article in the NFPA 25 series covers Chapter 4, the general requirements that every other chapter sits on. Each task in the fire pump, sprinkler or valve checklists gets its answer here: who does it, how it is recorded, when the AHJ is notified and under which safety precautions. Owner responsibility, freeze protection, notification, corrections and repairs, records, automated and remote inspection, performance-based programs and safety follow in order, with a short section on Chapter 16 at the end. Every line carries its NFPA 25-2026 clause number.
In short: The property owner or designated representative is responsible for inspection, testing, maintenance and impairment management (4.1.1). The work is done by personnel qualified for the specific task (4.1.1.3). Water-filled piping subject to freezing is kept at 40 °F (4 °C) minimum (4.1.2). The AHJ, the fire department where required and the alarm-receiving facility are notified of impairments and before tests or shutdowns (4.1.4). Records stay with the owner; ITM records are kept at least 1 year after the next task of the same type, and as-built drawings and acceptance test records for the life of the system (4.3.4, 4.3.5). Where automated testing is used, it is observed at least once every 3 years (4.6.1.1).
A. What do the frequencies mean? (Chapter 3, 3.7)
Every frequency in the standard is defined by a minimum and maximum time between events (3.7.1). These definitions apply to the whole series: an “annual” task is not done before 9 months have passed and not later than 15 months.
| Frequency | Definition | Clause |
|---|---|---|
| Daily | Every day | 3.7.1.1 |
| Weekly | Once per calendar week | 3.7.1.2 |
| Monthly | Once per calendar month | 3.7.1.3 |
| Quarterly | Four times per year; minimum 2 months, maximum 4 months apart | 3.7.1.4 |
| Semiannual | Twice per year; minimum 4 months, maximum 8 months apart | 3.7.1.5 |
| Annual | Once per year; minimum 9 months, maximum 15 months apart | 3.7.1.6 |
| Three years | Once every 36 months; minimum 30, maximum 40 months | 3.7.1.7 |
| Five years | Once every 60 months; minimum 54, maximum 66 months | 3.7.1.8 |
B. Owner responsibility
| Check | Criterion | Clause |
|---|---|---|
| ☐ Inspection, testing, maintenance and impairment management | The property owner or designated representative is responsible per this standard | 4.1.1 |
| ☐ Procedures | Implemented per this standard and the manufacturer’s instructions | 4.1.1.1 |
| ☐ Manufacturers’ literature | Available for inspecting, testing and maintaining valves and associated equipment | 4.1.1.2 |
| ☐ Who performs the work | Personnel qualified for the specific tasks | 4.1.1.3 |
| ☐ Water damage | Owner coordinates with the entity doing the work to minimize damage from discharged water | 4.1.1.4 |
| ☐ Owner is not the occupant | Authority for ITM and impairment management may be delegated to a designated representative | 4.1.1.5 |
| ☐ Designated representative holding that authority | Complies with all requirements the standard places on the owner | 4.1.1.6 |
| ☐ Accessibility | Ready access to components requiring inspection, testing and maintenance | 4.1.3 |
| ☐ Control valve location | Identified at the system riser or other approved location(s) | 4.1.9 |
C. Freeze protection
For the field side of cold-weather preparation see winterizing sprinkler systems; the requirements below are Chapter 4 itself.
| Check | Criterion | Clause |
|---|---|---|
| ☐ Water-filled piping subject to freezing | Kept at 40 °F (4 °C) minimum unless an antifreeze solution complying with Chapter 5 is used | 4.1.2 |
| ☐ Building areas with water-filled piping and no other freeze protection | 40 °F (4 °C) minimum | 4.1.2.1 |
| ☐ Piping in unconditioned spaces or outside the building envelope that is not subject to freezing | 4.1.2 does not apply | 4.1.2.2 |
| ☐ Aboveground pipes through open areas, cold rooms or passageways below 40 °F (4 °C), protected by insulation, frostproof casings, listed heat tracing or other reliable means | Kept between 40 °F (4 °C) and 120 °F (48.9 °C) | 4.1.2.3 |
| ☐ Other approved freeze protection means of 4.1.2.3 | Inspected, tested and maintained per this standard | 4.1.2.4 |
| ☐ Preaction, deluge and dry pipe valve enclosures subject to freezing | Inspected daily during cold weather: 40 °F (4 °C) minimum | 4.1.2.5 |
| ☐ Valve enclosures with low-temperature alarms | May be inspected weekly | 4.1.2.5.1 |
| ☐ Low-temperature alarms in valve enclosures | Annually, toward the beginning of the heating season before freezing: free of physical damage | 4.1.2.5.2 |
| ☐ Ice found in piping between the water supply and discharge devices or hose connections | System is considered impaired | 4.1.2.6.1 |
| ☐ Components found to contain ice | Completely thawed or replaced, and the system restored to service | 4.1.2.6.2 |
D. Notification: impairments, shutdowns and tests
| Check | Criterion | Clause |
|---|---|---|
| ☐ Impairment identified, or before testing or shutting down a system or its supply | Notify the AHJ, the fire department where required, and the alarm-receiving facility | 4.1.4 |
| ☐ Preplanned and emergency impairments | Notification required for both | 4.1.4.1 |
| ☐ Content of the notification | Include additional information required by 15.5.2 as applicable | 4.1.4.1.1 |
| ☐ Shutdown or test notification | Purpose, system or component involved, estimated time and expected duration | 4.1.4.2 |
| ☐ System, supply or component returned to service, or test complete | AHJ, fire department and alarm-receiving facility notified again | 4.1.4.3 |
The impairment procedure itself is in Chapter 15, covered in the series’ impairment management article.
E. Dry pipe and preaction systems designed with increased C values
| Check | Criterion | Clause |
|---|---|---|
| ☐ Dry pipe or preaction system using C = 120 through a technology permitted by NFPA 13 (nitrogen generator, vapor corrosion inhibitor, negative pressure system or other approved technology) | The approved corrosion mitigation system is inspected, tested and maintained per NFPA 25 and the manufacturer’s instructions | 4.1.5.1 |
| ☐ Impairments, critical or noncritical deficiencies found in these systems | Deficiencies corrected within a time frame approved by the AHJ; until impairments are corrected an approved impairment program per Chapter 15 is implemented | 4.1.5.2 |
| ☐ Corrosion mitigation system not replaced per NFPA 13 to keep the increased C value | System hydraulically recalculated with the lower C value and modified as necessary | 4.1.5.3 |
| ☐ Corrosion mitigation system deficient or impaired and 4.1.5.3 not met | Repaired or replaced with a corrosion mitigation system permitted by NFPA 13 for C = 120 | 4.1.5.4 |
F. Corrections, repairs and recalled products
| Check | Criterion | Clause |
|---|---|---|
| ☐ Deficiencies and impairments | Corrected or repaired by the owner or designated representative | 4.1.6.1 |
| ☐ Component under a recall or replacement program discovered | Maintenance personnel, designated representative or contractor notifies the owner in writing | 4.1.6.1.1 |
| ☐ Components and equipment under recall or replacement programs | Corrected, remedied, repaired or replaced by the owner or designated representative | 4.1.6.1.2 |
| ☐ Who performs corrections and repairs | Qualified personnel | 4.1.6.2 |
| ☐ Manufacturer’s corrective action | Where acceptable to the AHJ, a manufacturer may modify its own listed product in the field with listed devices that restore the original listed performance | 4.2 |
G. When occupancy, process or materials change
The owner does not change the occupancy, use, process, or materials used or stored without evaluating whether the fire protection system can protect the new condition (4.1.7). This evaluation is not part of normal ITM (4.1.7.1). It considers at least the following factors (4.1.7.2):
| Check | Criterion | Clause |
|---|---|---|
| ☐ Occupancy change | E.g., converting office or production space into warehousing | 4.1.7.2(1) |
| ☐ Process or material change | E.g., metal stamping to molded plastics | 4.1.7.2(2) |
| ☐ Building revisions | Relocated walls, added mezzanines, ceilings added below sprinklers | 4.1.7.2(3) |
| ☐ Heating | Removal of heating in spaces with piping subject to freezing | 4.1.7.2(4) |
| ☐ Storage | Changes to storage method, arrangement, height or commodities | 4.1.7.2(5) |
| ☐ Water supply | Changes in water supplies | 4.1.7.2(6) |
| ☐ A change affecting the installation criteria is identified | Owner or designated representative promptly evaluates the adequacy of the installed system | 4.1.8.1 |
| ☐ Evaluation shows the system is inadequate | Required corrections are made | 4.1.8.2 |
| ☐ Corrections | Approved | 4.1.8.3 |
H. Information sign and antifreeze information sign
| Check | Criterion | Clause |
|---|---|---|
| ☐ Information sign | Permanently marked metal or rigid plastic sign at each system riser | 4.1.10.1 |
| ☐ Attachment | Corrosion-resistant wire, chain or other approved means | 4.1.10.2 |
| ☐ Sign content (1) | Location of the area served by the system | 4.1.10.2(1) |
| ☐ Sign content (2) | Location of auxiliary drains and low-point drains for dry pipe and preaction systems | 4.1.10.2(2) |
| ☐ Sign content (3) | Presence and location of antifreeze or other auxiliary systems | 4.1.10.2(3) |
| ☐ Sign content (4) | Presence and location(s) of heat tape | 4.1.10.2(4) |
| ☐ Sign content (5) | Location of control valves as required by 13.3.1.1 | 4.1.10.2(5) |
| ☐ Existing nonlisted premixed antifreeze permitted to remain (5.3.4.4.2, 5.3.4.4.3) | Sign on the antifreeze system control valve: manufacturer type and brand, concentration by volume, volume of solution in the system | 4.1.11.1 |
| ☐ Listed antifreeze solutions | Sign on the antifreeze system main valve: manufacturer type and brand, minimum use temperature, volume of solution in the system | 4.1.11.2 |
I. Impairments and inactive system components
| Check | Criterion | Clause |
|---|---|---|
| ☐ Impairment occurs or is identified during ITM | Chapter 15 procedures are followed, including tagging the impaired system | 4.1.12.1 |
| ☐ Return to service after an impairment | Verified by an appropriate inspection or test per the component replacement (action) summary table in the applicable chapter | 4.1.12.2 |
| ☐ Inactive system or part of a system abandoned in place | Components including sprinklers, hose valves and hoses, and alarm devices are removed (extracted from NFPA 13) | 4.1.13.1 |
| ☐ Control valves abandoned in place | Operating mechanisms removed | 4.1.13.2 |
| ☐ Sprinkler piping and/or valves abandoned in place | Uniquely identified to differentiate them from active piping and valves | 4.1.13.3 |
The “component action” tables that 4.1.12.2 and 4.6.5 point to sit at the end of each system chapter: Table 5.5.1 for sprinkler systems (Chapter 5 article) and Table 13.13.1 for valves and common components (Chapter 13 article). Which inspection or test is needed on return to service after an impairment is read from these tables; simply reopening the valve and calling the system “in service” is not enough.
J. Records
| Check | Criterion | Clause |
|---|---|---|
| ☐ What is recorded | All inspections, tests and maintenance of the system and its components | 4.3.1 |
| ☐ Who keeps the records | The property owner | 4.3.1.1 |
| ☐ Electronic storage | Records may be stored and accessed electronically | 4.3.1.2 |
| ☐ Record content (1) | The procedure/activity performed (inspection, test or maintenance) | 4.3.2(1) |
| ☐ Record content (2) | The organization that performed the activity | 4.3.2(2) |
| ☐ Record content (3) | The required frequency of the activity | 4.3.2(3) |
| ☐ Record content (4) | The results and date of the activity | 4.3.2(4) |
| ☐ Record content (5) | Name and contact information of the qualified contractor or owner, including the qualified personnel performing the activity | 4.3.2(5) |
| ☐ AHJ request | Records made available to the AHJ on request | 4.3.3 |
| ☐ As-built drawings, hydraulic calculations, original acceptance test records, device data sheets | Retained for the life of the system | 4.3.4 |
| ☐ ITM records | Retained at least 1 year after the next inspection, test or maintenance of that type required by the standard | 4.3.5 |
K. Water supply, inspection and testing
| Check | Criterion | Clause |
|---|---|---|
| ☐ Water supplies (including fire pumps) during ITM | Remain in service unless under constant attendance by qualified personnel or Chapter 15 impairment procedures are followed | 4.4 |
| ☐ Inspection intervals | Components inspected at the intervals in the appropriate chapters | 4.5 |
| ☐ Purpose of testing | All components and systems tested to verify they function as intended | 4.6.1 |
| ☐ Automated testing per Section 4.7 in use | Testing observed at least once every 3 years | 4.6.1.1 |
| ☐ Automated testing cannot be visually observed | Testing conducted manually at least once every 3 years | 4.6.1.2 |
| ☐ Test frequency | Per this standard | 4.6.2 |
| ☐ After testing | Components restored to full operational condition, including reinstalling plugs and caps for auxiliary drains and test valves | 4.6.3 |
| ☐ Test results | Compared with the original acceptance test (if available) and the most recent test | 4.6.4 |
| ☐ Component or subsystem adjusted, repaired, reconditioned or replaced | Tested per the original acceptance test for that subsystem or the requirements specified by the standard | 4.6.5 |
L. Automated and remote inspection and testing
| Check | Criterion | Clause |
|---|---|---|
| ☐ Automated inspection and testing procedures performed per this standard | Permitted | 4.7.1 |
| ☐ Automated inspection equipment meeting the intent of a visual inspection | May replace the visual inspection | 4.7.2 |
| ☐ Automated testing equipment | Produces the same action the standard requires to test a device | 4.7.3 |
| ☐ Water discharge | Testing discharges water where required by the standard | 4.7.4 |
| ☐ Automated testing equipment that does not discharge water | Permitted except as required in 4.7.4.2 | 4.7.4.1 |
| ☐ Visual observation of discharge | At least once every 3 years | 4.7.4.2 |
| ☐ Where required by the standard | Personnel observe the testing and intervene when necessary to prevent injury or property damage | 4.7.5 |
| ☐ Automated test devices and equipment | Listed for the purpose of the test | 4.7.6 |
| ☐ Equipment not subjected to system pressure or not integral to system operation in a fire | Not required to be listed | 4.7.7 |
| ☐ Failure of the testing equipment | Does not impair system operation unless indicated by a supervisory signal per NFPA 72 | 4.7.8 |
| ☐ Component or system fails an automated test | Audible and visual supervisory signal per NFPA 72 or other approved fire alarm code | 4.7.9 |
| ☐ Failure of automated inspection and testing equipment | Trouble signal per NFPA 72 | 4.7.10 |
| ☐ Component or system failure that impairs the system | Impairment procedures are followed | 4.7.11 |
| ☐ Testing frequencies | Maintained regardless of the functionality of the automated testing equipment | 4.7.12 |
| ☐ Records | All inspections and testing recorded per 4.3.2 | 4.7.13 |
| ☐ Automated inspection and test results | Analyzed by qualified personnel | 4.7.14 |
| ☐ Remote inspections and tests | Permitted per NFPA 915 | 4.8 |
M. Performance-based programs and maintenance
| Check | Criterion | Clause |
|---|---|---|
| ☐ Performance-based program | Components and systems may be inspected, tested and maintained under an approved performance-based program | 4.9 |
| ☐ Program goals | Clearly identifiable goals and a clear definition of how the program meets them | 4.9.1 |
| ☐ Compliance | Compliance with an approved program is deemed compliance with this standard | 4.9.2 |
| ☐ Review | Goals and goal achievement reviewed at least every 3 years; ITM frequencies adjusted to current conditions and the historical record | 4.9.3 |
| ☐ Historical record | Available for review by the AHJ | 4.9.4 |
| ☐ Purpose of maintenance | Keep the system equipment operable | 4.10 |
N. Safety
| Check | Criterion | Clause |
|---|---|---|
| ☐ General | ITM conducted per applicable safety regulations | 4.11.1 |
| ☐ Confined spaces (tanks, valve pits, trenches) | Legally required precautions taken before entry | 4.11.2 |
| ☐ Fall protection | Legally required equipment worn or used | 4.11.3 |
| ☐ Other hazards | E.g., protection against drowning when working on top of a filled embankment or supported rubberized fabric tank, or over open water or other liquids | 4.11.4 |
| ☐ Hazardous materials stored on the premises | Owner or designated representative advises anyone performing ITM | 4.11.5.1 |
| ☐ Work where hazardous materials are present | Legally required equipment used | 4.11.5.2 |
| ☐ Testing or maintaining electric controllers for motor-driven fire pumps | Legally required precautions taken | 4.11.6.1 |
| ☐ Electrical safety minimum | NFPA 70E or an approved equivalent applied | 4.11.6.2 |
| ☐ Equipment in areas inaccessible for safety reasons due to process operations: inspection | During each scheduled shutdown | 4.11.7.1 |
| ☐ Same areas: testing | During each scheduled shutdown, where approved by the AHJ | 4.11.7.2 |
| ☐ Risk assessment shows a temporary condition will compromise personnel safety | Inspection and testing delayed when approved by the AHJ | 4.11.7.3 |
O. Chapter 16: special requirements from other NFPA documents
Chapter 16 collects ITM requirements for water-based systems found in other NFPA standards that differ from this standard (16.1.1.1). They are extracted from those referenced standards (16.1.1.2), and where the referenced standard differs from this one, the referenced standard takes precedence (16.1.1.3). Terms not defined in Chapter 3 take the definitions of the reference standard (16.1.2).
| Check | Criterion | Clause |
|---|---|---|
| ☐ Small residential board and care occupancies | This section applies only to residential board and care facilities with sprinkler systems installed to NFPA 13D as described in NFPA 101 | 16.2.1 |
| ☐ Systems installed to NFPA 13D | Inspected, tested and maintained per NFPA 101 | 16.2.1.1 |
For the difference between NFPA 13D and 13R see residential sprinkler standards; the NFPA 101 ITM provisions are not reproduced here.
Frequently Asked Questions
Who is responsible for inspection, testing and maintenance under NFPA 25?
The property owner or designated representative (4.1.1). Where the owner is not the occupant, that authority may be delegated to a designated representative, who then complies with all requirements placed on the owner (4.1.1.5, 4.1.1.6). The work is performed by personnel qualified for the specific tasks (4.1.1.3).
How long are inspection and test records kept?
ITM records are kept at least 1 year after the next inspection, test or maintenance of the same type (4.3.5). As-built drawings, hydraulic calculations, original acceptance test records and device data sheets are kept for the life of the system (4.3.4). Records are maintained by the owner, may be electronic, and are made available to the AHJ on request (4.3.1.1, 4.3.1.2, 4.3.3).
When exactly must an “annual” inspection be done?
Annual means once per year with a minimum of 9 and a maximum of 15 months between events (3.7.1.6). Quarterly is 2–4 months, semiannual 4–8 months, three years 30–40 months and five years 54–66 months (3.7.1.4, 3.7.1.5, 3.7.1.7, 3.7.1.8).
Who must be notified before a system is shut down or tested?
The AHJ, the fire department where required, and the alarm-receiving facility (4.1.4). The notice gives the purpose, the system or component involved, the estimated time and the expected duration (4.1.4.2). The same parties are notified again when the system is back in service or the test is complete (4.1.4.3).
Is manual testing still needed with automated test equipment?
Automated testing is observed at least once every 3 years; where it cannot be visually observed, the test is done manually at least once every 3 years (4.6.1.1, 4.6.1.2). For automated tests that do not discharge water, discharge is visually observed at least every 3 years (4.7.4.2). The standard’s test frequencies are kept regardless of whether the automated equipment works (4.7.12).

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 3 (3.7 frequency definitions), Chapter 4 (4.1–4.11) and Chapter 16 (16.1–16.2). The content of Chapters 5, 13 and 15 and of NFPA 13, NFPA 13D, NFPA 70E, NFPA 72, NFPA 101 and NFPA 915 referenced by Chapter 4 is not reproduced here.