This article in the NFPA 25 series covers Chapter 15: impairment management. Almost every inspection, test and maintenance task in the other articles takes a system, or part of one, out of service at some point; the fire pump, sprinkler and other chapters then send you to Chapter 15. The chapter is short but is the one most often skipped in the field: who authorizes, where the tag goes, who is notified, what happens when the outage passes 10 hours, and how the system is handed back. Below these are set out as a step-by-step procedure and checklist. Every line carries its clause number from NFPA 25-2026; references beginning with “Annex A” are explanatory material, not mandatory requirements.
In short: The property owner or designated representative assigns an impairment coordinator, and is the coordinator if no one is assigned (15.2). A system or part taken out of service is marked with a tag posted at the fire department connection and the system control valve (15.3). The coordinator authorizes each preplanned impairment and first verifies the nine items in 15.5.2: extent and duration, risk review, recommendations, notification of the fire department, insurer, alarm company and area supervisors, tags and materials (15.5). If a system is out of service for more than 10 hours in a 24-hour period, one of evacuation, an approved fire watch, a temporary water supply or an approved ignition-source program is required (15.5.2(4)). Emergency impairments follow the same steps (15.6.2). On restoration, tests are done, everyone is advised and the tag comes off (15.7).
A. Definitions: what counts as an impairment
| Term | Definition | Clause |
|---|---|---|
| Impairment | A condition where a fire protection system or unit or portion of it is out of order, and the condition can result in it not functioning in a fire event | 3.3.22 |
| Emergency impairment | A water-based system or portion out of order due to an unplanned occurrence, or an impairment found while performing inspection, testing or maintenance | 3.3.22.1 |
| Preplanned impairment | A water-based system or portion out of service due to work planned in advance | 3.3.22.2 |
The Annex A.3.3.22 explanation clarifies two points. “Unit” refers to a fire pump (NFPA 20), a water storage tank (NFPA 22) or a private fire service main (NFPA 24) with their connections, not to an individual sprinkler, valve or piece of pipe. And temporarily shutting a system down for routine inspection, testing and maintenance, under constant attendance by qualified personnel and where it can be restored quickly, should not be considered an impairment. Similarly, under 4.4 water supplies, including fire pumps, stay in service during inspection, testing and maintenance unless under constant attendance by qualified personnel or unless the Chapter 15 procedures are followed.
B. Scope and general rule
| Check | Criterion | Clause |
|---|---|---|
| ☐ Impairment program | Chapter 15 gives the minimum requirements | 15.1.1.1 |
| ☐ During the impairment | Measures are taken to minimize increased risk and limit the duration | 15.1.1.2 |
| ☐ Impairment occurs or is found during inspection, testing or maintenance | Chapter 15 procedures are followed, including tagging the impaired system | 4.1.12.1 |
| ☐ Notification | The AHJ, the fire department where required, and the alarm-receiving facility are notified when an impairment is identified or before a system or its supply is tested or shut down | 4.1.4 |
| ☐ Preplanned and emergency impairments | Notification is required for both; the additional information of 15.5.2 is included as applicable | 4.1.4.1, 4.1.4.1.1 |
| ☐ Content of a shutdown or test notice | Purpose, system or component involved, estimated time and expected duration | 4.1.4.2 |
The owner’s general responsibilities are covered separately in the series article on general requirements.
C. Impairment coordinator
| Check | Criterion | Clause |
|---|---|---|
| ☐ Coordinator assignment | The property owner or designated representative assigns an impairment coordinator to meet this chapter | 15.2.1 |
| ☐ No specific designee | The property owner or designated representative is considered the coordinator | 15.2.2 |
| ☐ Lease, written use agreement or management contract expressly gives ITM authority to the tenant, management firm or managing individual | That party assigns a person as impairment coordinator | 15.2.3 |
D. Tag impairment system
| Check | Criterion | Clause |
|---|---|---|
| ☐ System or part removed from service | Indicated with a tag | 15.3.1 |
| ☐ Where the tag goes | At each fire department connection, the system control valve and other locations the AHJ requires, stating which system or part is out of service | 15.3.2 |
Per the Annex A.15.3.1 explanation, the tag alerts occupants and the fire department that all or part of the system is out of service. It should be weather resistant, plainly visible and of sufficient size (typically 4 in. × 6 in., 100 mm × 150 mm), and should identify the impaired system, the date and time the impairment began, and the person responsible. The sample tag in the standard (Figure A.15.3.1) is a valve card marked “sprinkler valve shut”: it records which buildings the valve controls, who shut it and when; the reverse asks for a 2 in. (50 mm) drain test after the valve is reopened, treats an extreme pressure drop that does not recover as an impairment needing immediate investigation, and records static and flowing pressures, the tester’s signature and the date.
The Annex A.15.3.2 explanation gives the reason for the tag at the fire department connection: a tag on the riser alone could go unnoticed for a long time if firefighters have trouble getting into the building or the sprinkler control room.
E. Impaired equipment
Impaired equipment is the water-based fire protection system, or part of it, that is removed from service (15.4.1). It includes, but is not limited to, the following (15.4.2):
| Equipment that can be impaired | Related article in the series | Clause |
|---|---|---|
| Sprinkler systems | Chapter 5: sprinklers | 15.4.2(1) |
| Standpipe systems | Chapter 6: standpipe and hose | 15.4.2(2) |
| Fire hose systems | Chapter 6: standpipe and hose | 15.4.2(3) |
| Underground fire service mains | Chapter 7: private fire service mains | 15.4.2(4) |
| Fire pumps | Chapter 8: fire pumps | 15.4.2(5) |
| Water storage tanks | Chapter 9: water storage tanks | 15.4.2(6) |
| Water spray fixed systems | Chapter 10: water spray | 15.4.2(7) |
| Foam-water sprinkler systems | Chapter 11: foam-water sprinklers | 15.4.2(8) |
| Water mist systems | Chapter 12: water mist | 15.4.2(9) |
| Fire service control valves | Chapter 13: valves and common components | 15.4.2(10) |
| Water supply | — | 15.4.2(11) |
F. Preplanned impairment: step-by-step procedure
According to the Annex A.15.5 explanation, the need for temporary protection, termination of all hazardous operations and the frequency of checks in the affected areas should be determined, and all possible work done in advance to shorten the impairment. Where possible, temporary feedlines should keep portions of systems in service while work is completed. Systems should not be taken out of service just because the building is not in use; where a system out of service for a long period, as in idle or vacant property, is returned to service, qualified personnel should be retained to inspect and test it.
Before giving authorization the coordinator is responsible for verifying these steps (15.5.2):
| Step | What is done | Clause |
|---|---|---|
| ☐ 1. Authorization | All preplanned impairments are authorized by the impairment coordinator | 15.5.1 |
| ☐ 2. Extent and duration | The extent and expected duration of the impairment have been determined | 15.5.2(1) |
| ☐ 3. Site review | The areas or buildings involved have been inspected and the increased risks determined | 15.5.2(2) |
| ☐ 4. Mitigation recommendations | Recommendations to mitigate the increased risks have been submitted to management or the property owner or designated representative | 15.5.2(3) |
| ☐ 5. Over 10 hours in 24 | The coordinator arranges one of the four options below | 15.5.2(4) |
| ☐ 6. Fire department | The fire department has been notified | 15.5.2(5) |
| ☐ 7. Other parties | The insurance carrier, alarm company, property owner or designated representative and other authorities having jurisdiction have been notified | 15.5.2(6) |
| ☐ 8. Area supervisors | The supervisors in the affected areas have been notified | 15.5.2(7) |
| ☐ 9. Tag system | A tag impairment system has been implemented (Section 15.3) | 15.5.2(8) |
| ☐ 10. Materials | All necessary tools and materials are assembled at the impairment site | 15.5.2(9) |
More than 10 hours in a 24-hour period: four options
Where a fire protection system will be out of service for more than 10 hours in a 24-hour period, the coordinator arranges one of the following (15.5.2(4)):
| Option | Requirement and Annex A explanation | Clause |
|---|---|---|
| (a) Evacuation | Evacuation of the building or the portion affected by the system out of service | 15.5.2(4)(a) |
| (b) Approved fire watch | Annex A.15.5.2(4)(b): trained personnel continuously patrolling the affected area. Ready access to extinguishers and the ability to notify the fire department promptly matter. The patrol looks not only for fire but also checks that other features such as egress routes and alarm systems are available and working | 15.5.2(4)(b) |
| (c) Temporary water supply | Annex A.15.5.2(4)(c): sources such as a large-diameter hose from a hydrant to a fire department connection, a portable tank and portable pump, or a standby fire department pumper and/or tanker | 15.5.2(4)(c) |
| (d) Ignition source and fuel program | Establishing and implementing an approved program to eliminate potential ignition sources and limit the fuel available to the fire. Annex A.15.5.2(4)(d): depending on the occupancy, stopping certain processes or cutting fuel to some machines may be enough; “No Smoking” and “No Hot Work” (cutting, grinding, welding) policies are also helpful while the system is out of service | 15.5.2(4)(d) |
G. Emergency impairments
| Check | Criterion | Clause |
|---|---|---|
| ☐ Examples of emergency impairments | Interruption of water supply, frozen or ruptured piping, equipment failure, and impairments found during inspection, testing or maintenance (not limited to these) | 15.6.1 |
| ☐ What the coordinator does | Implements the steps of Section 15.5 | 15.6.2 |
| ☐ Tag | The impaired system is tagged | 4.1.12.1, 15.3 |
| ☐ Notification | Notification is also required for emergency impairments | 4.1.4.1 |
The Annex A.15.6 explanation adds system leakage to the list. Per the Annex A.15.6.2 explanation, when one or more impairments are found during inspection, testing and maintenance, the owner or authorized representative should be notified in writing. The sample notice in the standard (Figure A.15.6.2) uses a checklist: control valve shut, low water pressure during a flow test (possible obstruction or partly closed valve), frozen, leaking or obstructed pipes, disconnected piping, missing, damaged or obstructed fire department connection, dry pipe valve that cannot be reset, quick-opening device out of service, painted, corroded, damaged or loaded sprinklers, fire pump out of service, detection/actuation system out of service, and other.
If the inspection turned up findings such as plugged sprinklers or foreign material in drain tests, an obstruction investigation under Chapter 14 may also be needed before the system is handed back.
H. Restoring systems to service
When all impaired equipment is back in normal working order, the coordinator verifies the following (15.7):
| Step | What is done | Clause |
|---|---|---|
| ☐ 1. Inspection and testing | The inspections and tests needed to verify the affected systems are operational have been done; the relevant chapter of the standard gives the type | 15.7(1) |
| ☐ 2. Area supervisors | Advised that protection is restored | 15.7(2) |
| ☐ 3. Fire department | Advised that protection is restored | 15.7(3) |
| ☐ 4. Other parties | Property owner or designated representative, insurance carrier, alarm company and other authorities having jurisdiction advised that protection is restored | 15.7(4) |
| ☐ 5. Tag | The impairment tag has been removed | 15.7(5) |
Which test is needed is set by the “Summary of Component Replacement [Action] Requirements” table in each system chapter; the system is verified by the appropriate inspection or test from that table (4.1.12.2). The AHJ, fire department and alarm-receiving facility are notified when the system, supply or component returns to service or the test is complete (4.1.4.3).
Systems shut down for a long time
The Annex A.15.7 explanation recommends that systems in idle or vacant buildings that were shut off, drained and left unmaintained for a long time be restored by qualified personnel or a qualified contractor, and gives an example procedure. It is a recommendation; the mandatory steps are those in 15.7. Returning a system to service after more than a year shut down also requires an obstruction investigation under 14.3.1(11).
| Step | Example procedure in the Annex A.15.7 explanation | Source |
|---|---|---|
| Trace the piping | Trace all piping from the extremities to the main connections, checking for blank gaskets in flanges, closed valves, corroded or damaged sprinklers, nozzles or piping, insecure or missing hangers and insufficient support. Make repairs, adjustments and needed extensions | Annex A.15.7(1) |
| Air test and filling | Run a low-pressure (40 psi) air test before admitting water; once the piping is proven tight, introduce water slowly with precautions against escaping water from undiscovered defects. Once full at normal pressure, make drain valve tests to catch any overlooked closed valve; flush all available pipes and complete an obstruction investigation to make sure the system is clear | Annex A.15.7(2) |
| Hydrostatic test | Where the system was damaged by freezing or other extensive damage may have occurred, a full hydrostatic test per NFPA 13 can show whether integrity has been maintained | Annex A.15.7(3) |
| Valves and alarm connections | Examine, put in proper condition and test dry pipe valves, quick-opening devices, alarm valves and all alarm connections | Annex A.15.7(4) |
| Water supplies | Fire pumps, pressure and gravity tanks, reservoirs and other supply equipment get proper attention before going into service; test each supply separately, then together if designed to work together | Annex A.15.7(5) |
| Control valves | Operate all control valves from closed to fully open and leave them sealed, locked or with a tamper switch | Annex A.15.7(6) |
I. One-page checklist
| Stage | What is done | Clause |
|---|---|---|
| Preparation (ongoing) | ||
| Coordinator | The property owner or designated representative assigns an impairment coordinator; without one, they are the coordinator | 15.2.1, 15.2.2 |
| Program | Measures that minimize increased risk and limit the duration of the impairment | 15.1.1.2 |
| When an impairment starts | ||
| Preplanned | Authorization by the coordinator and verification of the nine items in 15.5.2 | 15.5.1, 15.5.2 |
| Emergency | The coordinator implements the same 15.5 steps | 15.6.2 |
| Tag | Tag at the fire department connection and the system control valve | 15.3.2 |
| More than 10 hours in 24 | Evacuation, approved fire watch, temporary water supply, or an approved program limiting ignition sources and fuel | 15.5.2(4) |
| Return to service | ||
| Verification | Required inspections and tests, notifications, removal of the tag | 15.7(1)–(5) |
J. Common mistakes in the field
| Check | Criterion | Clause |
|---|---|---|
| ☐ No one knows who the coordinator is | Without an assignment the owner or representative is responsible; where ITM authority is contracted out, the tenant or management firm assigns a person | 15.2.2, 15.2.3 |
| ☐ Tag hung only on the riser | Tags also go on every fire department connection and the system control valve | 15.3.2 |
| ☐ System left shut overnight with no extra measures | Past 10 hours in 24, one of the four options in 15.5.2(4) is mandatory | 15.5.2(4) |
| ☐ A defect found during inspection only goes in the report | It is an emergency impairment; the 15.5 steps apply | 15.6.1, 15.6.2 |
| ☐ Job done, valve opened, nothing else | Inspections and tests, notification of all parties and removal of the tag | 15.7 |
| ☐ System shut down because the building is empty | Annex A.15.5: systems should not be removed from service because the building is not in use | Annex A.15.5 |
Frequently Asked Questions
Who is the impairment coordinator?
The person the property owner or designated representative assigns to meet Chapter 15 (15.2.1). Without an assignment, the owner or representative is the coordinator (15.2.2). If a contract gives ITM authority to a tenant or management firm, that party assigns the coordinator (15.2.3).
Where is the impairment tag posted?
At each fire department connection, the system control valve and any other locations the AHJ requires, stating which system or part is out of service (15.3.2). The Annex A.15.3.1 explanation suggests a durable, visible tag, typically 4 in. × 6 in. (100 mm × 150 mm).
What is required if a system is out for more than 10 hours?
If a system is out of service for more than 10 hours in a 24-hour period, the coordinator arranges one of: evacuation of the affected area, an approved fire watch, a temporary water supply, or an approved program to eliminate ignition sources and limit fuel (15.5.2(4)).
Who must be notified of a preplanned impairment?
The fire department; the insurance carrier, alarm company, property owner or designated representative and other authorities having jurisdiction; and the supervisors of the affected areas (15.5.2(5)–(7)). Notification is also required for emergency impairments (4.1.4.1).
What is verified when a system is restored to service?
Inspections and tests showing the affected systems are operational, notice that protection is restored to supervisors, the fire department, the owner, insurer, alarm company and AHJs, and removal of the tag (15.7).

SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.
Download SprinkCalc on the App Store
MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App StoreNFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 15 (15.1–15.7), definitions 3.3.22–3.3.22.2, 4.1.4, 4.1.12 and 4.4, with Annex A explanations A.3.3.22, A.15.3.1–A.15.7 and Figures A.15.3.1 and A.15.6.2 (explanatory, not mandatory). The content of other chapters and of NFPA 13 referenced by Chapter 15 is not reproduced here.