This article in the NFPA 25 series covers Chapter 11. In the 2026 edition the chapter is titled “Foam Systems”; going by the title of its summary table, it covers low-, medium- and high-expansion foam systems together with foam-water sprinkler systems. The fire pump is sent to the fire pump checklist, common components and valves to the valves and common components checklist and the water tank to the water storage tank checklist. For deluge systems without foam see the water spray system article, and for closed-head wet systems the sprinkler system article. This article covers inspection, testing and maintenance only, not design. Every line carries its clause number from NFPA 25-2026.

In short: The location and position of foam-water discharge devices are inspected monthly for spray nozzles and annually for sprinklers (Table 11.1.1.2). A foam concentrate sample goes to the manufacturer or an approved laboratory every year (11.3.1). The proportioner gets an annual operational test; the measured induction rate must be within minus 0 to plus 30 percent of the manufacturer’s listed concentration or plus 1 percentage point, whichever is less (11.3.2.5.7). The complete system gets an annual operational (discharge) test (Table 11.1.1.2, 11.3.10). Bladder and concentrate tanks are hydrostatically tested every 10 years (Table 11.1.1.2), underground foam piping is pressure tested at least every 10 years (11.2.11.8) and pressure vacuum vents are serviced every 5 years (11.4.4.6).

A. Scope and general rules

Chapter 11 gives the minimum requirements for routine inspection, testing and maintenance of foam systems installed to NFPA 11 or another approved installation standard (11.1.1.1). Minimum frequencies come from Table 11.1.1.2 (11.1.1.2, 11.2.1).

CheckCriterionClause
☐ Foam solution during inspection and testingConducted without inadvertent discharge of foam solution into the system piping11.1.1.3
☐ Fire pumps, water storage tanks, common components and valvesPer Chapter 8, Chapter 9 and Chapter 13 respectively, and Table 11.1.1.211.1.2
☐ Alarm and detection devicesTested and inspected per NFPA 7211.1.3
☐ Obstruction investigation neededFollow the procedures of Chapter 1411.1.4
☐ Impairment to protectionFollow the procedures of Chapter 1511.1.5.1
☐ Critical deficiencyAppropriate action is taken11.1.5.2
☐ Noncritical deficiencyAppropriate corrective action is taken11.1.5.3
☐ Hose connectionsInspected, tested and maintained per Chapter 6 and Chapter 1311.1.6
☐ System altered so foam concentrate and components are not compatibleThe system is considered impaired11.1.7
☐ Inspection finds a deficiencyDocumented and corrected per 11.1.511.2.2
☐ Testing or maintenance finds a deficiencyDocumented, corrected and retested per 11.1.511.3.1, 11.4.1.2

B. Frequency summary: Table 11.1.1.2

The standard’s summary table for low-, medium- and high-expansion foam and foam-water sprinkler systems is reproduced in full below. Rows marked "—" have no frequency of their own in the table; the frequency and method come from the chapter or standard in the right-hand column. In the maintenance group, “In-line balanced pressure type”, “Line type” and “Proportioning system(s), standard pressure type” appear in the table as sub-headings.

System/componentFrequencyReference
Inspection
Control valve(s)—Chapter 13
Deluge/preaction valve(s)—Chapter 13
Discharge device location and position (spray nozzle)Monthly11.2.4.1.1
Discharge device location and position (sprinkler)Annually11.2.4.1.1
Drainage in system areaQuarterly11.2.7
Fire pump(s)—Chapter 8
Foam concentrate pump(s)—Chapter 8
Fittings corrosionAnnually11.2.11
Fittings damageAnnually11.2.11
Foam concentrate storageAnnually11.2.9
Gauges—Chapter 13
Hangers/braces/supportsAnnually11.2.12
Pipe corrosionAnnually11.2.11
Pipe damageAnnually11.2.11
Proportioning system(s), allMonthly11.2.8
Standard pressure proportioning pickup tube10 years11.2.8.5.2
Line proportioner pickup tubesAnnually11.2.8.6.3
Foam tank inspectionAnnually11.2.9
Proportioning headAnnually11.2.8.5.2
Water-powered foam proportioner pump leakageMonthly11.2.8.6.8
Water-powered foam proportioner pump valve positionMonthly11.2.8.6.8
Water-powered foam proportioner pump oil levelSemiannually11.2.8.6.8
Water-powered foam proportioner pump shock absorbersSemiannually11.2.8.6.8
Water-powered foam proportioning pump filtersSemiannually11.2.8.6.8
Strainer(s), mainlineAnnuallyChapter 7
Strainer(s), discharge deviceAfter each use11.2.6.1
Foam concentrate strainersAnnually11.2.6.4
Water supply piping—Chapter 7
Water supply tank(s)—Chapter 9
Waterflow devices—Chapter 13
Supplementary hoses—Chapter 6
Auxiliary drain signage—Chapter 13
Supplementary hose stream nozzles—Chapter 6
Supplementary hose stream storage—Chapter 6
Fixed foam discharge outletAnnually11.2.4.2
Vapor sealsAnnually11.2.4.2.4
Fire department hose connections—Chapter 6
Hydraulic design information sign—Chapter 4
Foam dam—11.2.15
Pressure foam makerAnnually11.2.4.2.5
Rupture diskAnnually11.2.4.2.5.5
Alarm devices—NFPA 72
Operating instructions and trainingAnnually11.2.17
High pressure cylindersAnnually11.2.14
Foam in surrounding space of bladderAnnually11.2.9.8
Test
Backflow preventer(s)—Chapter 13
Complete foam-water sprinkler system(s) (operational test)Annually11.3.10.2
Control valve(s)—Chapter 13
Deluge/preaction valve(s)—Chapter 13
Detection system—NFPA 72
Discharge device locationAnnually11.3.10.2.7
Discharge device obstructionAnnually11.3.10.2.7
Discharge device positionAnnually11.3.10.2.7
Fixed foam discharge outlet water flowAnnually11.3.11
Pressure foam maker water flowAnnually11.3.11.6
Fire pump(s)—Chapter 8
Foam concentrate pump(s)—Chapter 8
Manual actuation device(s)Annually11.3.10.4
Proportioning system(s), allAnnually11.3.2
Valve status test—Chapter 13
Water supply flow test—Chapter 7
Water supply tank(s)—Chapter 9
Waterflow alarm devices—Chapter 13
Supplementary hose streams—Chapter 6
Supplementary hose stream nozzles—Chapter 23 of NFPA 1930
Foam concentrateAnnually11.3.1.1
MonitorsAnnually11.3.7
Oscillating monitor’s range of motionAnnually11.3.7.2
Oscillating monitor full flow5 years11.3.7.3
Water-powered foam proportioning pump operationQuarterly11.3.4
Water-powered foam proportioning pump operation at specified rate of flowAnnually11.3.4
Water-powered foam proportioning pump screwed connectionsSemiannually11.3.4
Water-powered foam proportioning pump valvesSemiannually11.3.4
Bladder tank hydrostatic test10 years11.3.5.1
Foam concentrate tank hydrostatic test10 years11.3.5.1
High pressure cylinder5 years/12 years11.3.5.4
Underground piping10 years11.2.11.8
Maintenance
Backflow preventer(s)—Chapter 13
Bladder sight glass cleaning10 years11.4.3.2
Check valve(s)—Chapter 13
Control valve(s)—Chapter 13
Deluge/preaction valves—Chapter 13
Detection system—NFPA 72
Detector check valve(s)—Chapter 13
Fire pump(s)—Chapter 8
Foam concentrate strainer(s)Annually11.2.6.4
Metallic atmospheric and pressure vessel storage tanks drain/flush10 years11.4.3.1
Foam concentrate pump(s)—Chapter 8
In-line balanced pressure type——
Balancing valve diaphragm5 years11.4.4.3.3
Line type——
Pressure vacuum vents5 years11.4.4.6
Proportioning system(s), standard pressure type——
Ball drip (automatic-type) drain valves5 years11.4.4.1
Balancing valve diaphragm5 years11.4.4.2.3
Strainer(s), mainline—Chapter 7
Water supply—11.4.2
Water supply tank(s)—Chapter 9
Hose valves—Chapter 13
Pressure gauges—Chapter 13
Fixed foam discharge outletPer manufacturer11.4.4.8
Pressure foam makerPer manufacturer11.4.4.9
Monitors—Chapter 7
Monitor nozzles—Chapter 7
Supplementary hoses—NFPA 1930
Supplementary hose nozzles—NFPA 1930
Rupture disksPer manufacturer11.4.4.9.1
Water-powered foam concentrate proportioning pump shaft lubricationSemiannually11.4.4.5
Water-powered foam concentrate proportioning pump oil change5 years11.4.4.5
Water-powered foam concentrate proportioning vane replacementPer manufacturer11.4.4.5
Auxiliary drains—Chapter 13

C. Foam-water discharge devices

CheckCriterionClause
☐ Condition of discharge devicesIn place, still aimed in the direction intended by the design, free from external loading and corrosion (visual)11.2.4.1.1
☐ Devices requiring caps or plugsCaps and plugs confirmed in place visually11.2.4.1.2
☐ Misaligned discharge deviceAdjusted (aimed) by visual means11.2.4.1.3
☐ Alignment and coverage of an adjusted deviceObserved and verified during the next scheduled flow test11.2.4.1.3.1
☐ Device and concentrate pairingVerify that unlisted combinations of discharge devices and foam concentrate have not been substituted11.2.4.1.4

D. Fixed foam discharge outlets and pressure foam makers

CheckCriterionClause
☐ Fixed foam discharge outletsInspected annually11.2.4.2
☐ Outlets inaccessible for safety due to process operations or personnel hazardsInspected during each scheduled shutdown11.2.4.2.1
☐ Outlets on tanksVisually inspected from ground level or other means11.2.4.2.2
☐ Outlets on external floating roofsVisually inspected from ground level and from the top of the stairs11.2.4.2.3

Where a vapor seal is provided, the inspection verifies the seal is present by one of the following means (11.2.4.2.4):

  1. Visual inspection: approved by the AHJ before the inspection; where an inert gas system is provided, the owner verifies that the makeup gas is sufficient to remove a fixed foam discharge outlet lid (11.2.4.2.4(1)).
  2. Use of an infrared camera (11.2.4.2.4(2)).
  3. Gas monitoring: around the outlet lid and air inlet where access to the chamber is provided; at the fire department connection on a semi-fixed foam system; at low-point drains of foam solution piping (11.2.4.2.4(3)).
  4. Other means allowed and approved by the AHJ and the operator (11.2.4.2.4(4)).

Pressure foam makers

CheckCriterionClause
☐ GeneralInspection follows the manufacturer’s specifications11.2.4.2.5
☐ Check valvesInspected per 13.4.211.2.4.2.5.1(A)
☐ Before inspectionAir monitoring at truck connections and valved test connections11.2.4.2.5.1(B)
☐ Personal protective equipmentProper PPE used11.2.4.2.5.2
☐ Gate valvesInspected per 13.3.2.111.2.4.2.5.3
☐ Auxiliary drainsInspected per 11.4.4.1311.2.4.2.5.4
☐ Rupture disks (where provided)Inspected per the manufacturer’s requirements11.2.4.2.5.5
☐ System operating valvesIn the proper positions determined by the system design11.2.4.2.5.6
☐ Water level in the base of the storage tankBelow the bottom of the foam injection line11.2.4.2.5.7
☐ Foam makerNo signs of physical damage11.2.4.2.5.8
☐ Air inletFree of paint, debris or other items that could impede the chamber or foam maker; air inlet screen not damaged or missing11.2.4.2.5.9
☐ Strainers (where equipped)Inspected per 11.2.611.2.4.2.5.10

E. Monitors, hoselines and water supply

CheckCriterionClause
☐ Monitors, including self-educting monitorsInspected per 7.2.2.611.2.4.3
☐ Pickup tubes on self-educting monitors (where provided)Inspected for cracking and dry rot11.2.4.3.1
☐ HoselinesInspected annually per 6.2.6 or, where applicable, the manufacturer’s instructions11.2.4.4
☐ Hose nozzlesInspected annually per 6.2.711.2.4.5
☐ Water supply systems supplying foam systemsInspected per Chapter 7, Chapter 8 and Chapter 911.2.5

F. Strainers and drainage

CheckCriterionClause
☐ Individual discharge device basket or screen strainersInspected for damaged and corroded parts after each system activation, each operational test and each flushing test11.2.6.1
☐ Mainline strainersInspected per 7.2.2.311.2.6.2
☐ All strainersInspected per the manufacturer’s instructions; cleaned after each use and flow test11.2.6.3
☐ Foam concentrate strainersVisually verify the blowdown valve is closed and plugged11.2.6.4
☐ Foam concentrate strainers on foam concentrate pump skidsInspected per Chapter 811.2.6.4.1
☐ Area beneath and around a foam-water spray systemDrainage facilities not blocked; retention embankments and dikes in good repair11.2.7

G. Proportioning system inspection

Proportioning system components are inspected at the frequency in Table 11.1.1.2 (11.2.8.1). Valves being inspected may be open or closed depending on their function; their position is verified against the specified operating conditions (11.2.8.2, 11.2.8.3). The additional items for each proportioner type are (11.2.8.4):

ProportionerWhat the inspection coversClause
Standard pressure proportionerPressure removed first to prevent injury; ball drip valves (automatic drains) free and opened; pickup tube verified intact, undamaged and not clogged by removing the proportioning head11.2.8.5.1, 11.2.8.5.2
Bladder tank proportionerPressure removed first; water control valves to the foam concentrate tank inspected11.2.8.6.1, 11.2.8.6.2
Line proportionerStrainers per 11.2.6.1; pickup pipes inside the tank for corrosion and plugging11.2.8.6.3
Standard balanced pressure proportionerStrainers per 11.2.6.1; gauges in good operating condition; sensing line valves open; power available to the foam concentrate pump11.2.8.6.4
In-line balanced pressure proportionerStrainers per 11.2.6.1; gauges in good working condition; sensing line valves at the pump unit and at each proportioner station open; power available to the foam concentrate pump11.2.8.6.5
Orifice plate proportionerStrainers per 11.2.6.1; gauges in good working condition; power available to the foam concentrate pump11.2.8.6.6
Wide-range proportionerReference marks between foam inlet nipple and body aligned (factory setting of the internal metering valve); flow direction arrow correct; foam type on the nameplate consistent with the design and the foam in the tank11.2.8.6.7
Water-powered foam concentrate proportioner pumpValves in the proper operational position per the manufacturer; no leakage on the unit or connections; oil at the appropriate mark; shock absorbers at the water motor/pump coupling evaluated for wear11.2.8.6.8
Mobile apparatus proportionerProportioning system certification reviewed annually; concentrate type and viscosity unchanged from the one used for certification. If changed, it is an impairment until a new certification is received from the manufacturer11.2.8.6.9–11.2.8.6.9.2

H. Foam concentrate and storage tanks

CheckCriterionClause
☐ Quantity of concentrate in storageSatisfies the original design11.2.9.1, 11.2.13.3
☐ Foam concentrate storage tanksInspected annually per 9.2.4 for external corrosion and damage11.2.9.2
☐ Expansion domesInternal inspection annually11.2.9.3
☐ SedimentTank inspected for sediment; excessive sediment requires draining and flushing11.2.9.4, 11.2.9.4.1
☐ Tank drained and flushed for maintenanceInternal inspection conducted11.2.9.4.2
☐ Pressure vacuum vent (where provided)Verified operating freely11.2.9.5
☐ Tank hydrostatic test (where applicable)Verified as current11.2.9.6
☐ Through-the-wall fittings (where applicable)Inspected for mechanical damage and leakage11.2.9.7
☐ Bladder tanksAnnual inspection for foam in the water surrounding the bladder11.2.9.8
☐ Concentrate type and viscosityUnchanged from the concentrate used for system certification and suitable for the current hazard (e.g., alcohol resistant)11.2.13.1
☐ Mixed brands or typesVerify they have not been mixed; if mixed, confirm with the manufacturer(s) that they are compatible and the mix is approved by the AHJ11.2.13.1.1, 11.2.13.1.2
☐ Condition of concentrateInspected at least annually for excessive sludging or deterioration11.2.13.2
☐ Tanks and containersNormally kept full, with space for expansion11.2.13.3.1

I. Compressed air foam equipment and high-pressure cylinders

CheckCriterionClause
☐ Compressed air foam–generating equipment and accessoriesInspected annually11.2.10.1
☐ CAF discharge devicesVisually inspected annually for mechanical damage11.2.10.2
☐ Cylinder pressurePer the manufacturer’s specifications for the system11.2.14.1.1
☐ Hydrostatic test date of CAF high-pressure cylindersInspected11.2.14.1.2
☐ Cylinder more than 5 years past its last testNot recharged without hydrostatic test and remarking11.2.14.1.2.1
☐ Cylinder in continuous service without dischargingMay stay in service up to 12 years, then discharged and retested before return to service11.2.14.1.2.2

J. Pipe, fittings, hangers and supports

CheckCriterionClause
☐ Foam system pipe and fittingsInspected annually11.2.11
☐ Pipe and fittings inaccessible for safety due to process operationsInspected during each scheduled shutdown11.2.11.1
☐ ConditionFree of mechanical damage, leakage and corrosion; findings documented and corrected per 11.1.511.2.11.2, 11.2.11.2.1
☐ External corrosion detrimental to performance, or mechanical damage, on normally dry pipingPressure test per NFPA 1111.2.11.2.2
☐ External loadsNo materials resting on or hanging from the pipe11.2.11.3
☐ Misalignment and trapped sectionsInspected11.2.11.4
☐ Auxiliary drain signageInspected per 13.4.5.1.211.2.11.5
☐ Rubber-gasketed fittingsLocation and condition inspected11.2.11.6
☐ Aboveground foam pipingExamined for condition and proper drainage11.2.11.7
☐ Underground foam solution and concentrate pipingHydrostatic test at the installation standard’s system design pressure at least every 10 years; other AHJ-approved frequencies, or other means per Chapter 14, allowed11.2.11.8–11.2.11.8.2
☐ Foam concentrate linesNo galvanized pipe, per 4.7.1.3 of NFPA 1111.2.11.9
☐ Hangers, braces and supportsInspected annually from floor level; those inaccessible due to process operations at each scheduled shutdown11.2.12, 11.2.12.1
☐ Damaged, loose or unattached hangers and supportsReplaced or refastened11.2.12.2, 11.2.12.3

K. Foam dams, deluge valves and operating instructions

CheckCriterionClause
☐ Foam damsInspected per this subsection for the applicable tank construction11.2.15.1
☐ Foam dams inaccessible for safety due to process operationsInspected during each scheduled shutdown11.2.15.2
☐ Foam dam on an external floating roofAt least annually, visually: dam sound and properly attached; drainage slots free and clear of debris; earthing shunts free of corrosion and damage11.2.15.3
☐ Foam dam on an internal floating roofInspected when the tank is brought down for inspection and maintenance per industry standards; earthing shunts for corrosion and damage11.2.15.4.1, 11.2.15.4.2
☐ Deluge valvesInspected per Chapter 1311.2.16
☐ Operating instructions and trainingSystem operation, deactivation, acceptance/commissioning test results, maintenance instructions and layouts in place at control equipment, with copies on file11.2.17

L. Testing: foam concentrate sample

CheckCriterionClause
☐ Foam concentrate testingAnnually11.3.1.1
☐ SampleSent to the manufacturer or an approved testing laboratory for quality condition testing11.3.1.2
☐ Foam type and brand knownQuality testing confirms the product meets the manufacturer’s specifications11.3.1.3

M. Proportioner tests

An operational test of the foam proportioner is conducted annually (11.3.2). Where approved by the AHJ, surrogate test liquids may be used in lieu of foam concentrate, with alternative test methods permitted provided system pressures and flows remain as described in the chapter and meet the design requirements (11.3.2.1, 11.3.2.1.1).

CheckCriterionClause
☐ Concentration of the foam solution sampleVerified by one of: digital refractometer; digital electric conductivity, handheld or online with electronic data acquisition; calibrated listed digital flowmeters (total flow and foam concentrate); other means acceptable to the AHJ11.3.2.2
☐ Data to collectStatic water pressure; residual water pressure at the control valve and at the remote reference point; actual discharge rate; consumption rate of foam-producing material; concentration of the foam solution11.3.2.3
☐ Compressed air foam systems, any discharge testStatic water pressure; residual water pressure at the control device; system air pressure; concentration of the foam solution11.3.2.4
☐ Foam solution or premix testingArranged with as little loss of foam concentrate as possible11.3.2.4.1
☐ Proportioning equipment for foam-water sprinkler systemsVerified by flow tests; flow through suitable test outlet connections allowed if it meets design flow conditions and is acceptable to the AHJ; the alternative methods of 11.3.2.1 also allowed11.3.2.5–11.3.2.5.1.1
☐ Water pressure at the proportioner inletMeets the design condition at the maximum required system flow; maximum supply pressure does not exceed the maximum allowable working pressure of any proportioning component11.3.2.5.2, 11.3.2.5.2.1
☐ Closed-head systems (including wide-range or variable-range proportioners)Induction rate (percent concentration) verified at the maximum system design flow and at a flow equal to the four most hydraulically located sprinkler heads discharging11.3.2.5.3, 11.3.2.5.3.1
☐ Open-head deluge systemsInduction rate verified at the maximum system design flow11.3.2.5.4
☐ Multiple proportioners designed to operate individuallyEach verified by a separate flow test11.3.2.5.5
☐ Multiple proportioners designed to operate simultaneouslyEach verified while the required number discharge simultaneously11.3.2.5.6
☐ Acceptance criterionInduction rate, as a percentage of foam solution flow (water plus concentrate), within minus 0 to plus 30 percent of the manufacturer’s listed concentration or plus 1 percentage point, whichever is less11.3.2.5.7

N. Mobile apparatus proportioners and water-powered proportioner pumps

CheckCriterionClause
☐ Mobile apparatus proportioner testingVerify the proportioning system meets 18.11.2 of NFPA 190011.3.3.1
☐ Concentrate type or viscosity changed without recertification per 18.10.1 of NFPA 1900System type tested and recertified by the proportioning system manufacturer11.3.3.2

Testing of water-powered foam concentrate proportioner pumps includes these steps (11.3.4):

  1. Operate the water motor driven pump per the manufacturer’s specification.
  2. Operate the manual air bleed valve, pressure relief valves and operational valves per the manufacturer’s specification.
  3. Check filters for contamination per the manufacturer’s specifications.
  4. Check screwed connections for tightness.
  5. Operate the pump to the installed specifications for rate of flow and conduct a proportioning test per the manufacturer’s procedures and specifications.

O. Hydrostatic tests, monitors and hoses

CheckCriterionClause
☐ Standard pressure proportioner tanks and bladder tanksHydrostatic test per Table 11.1.1.2 (every 10 years)11.3.5.1
☐ Hydrostatic test of a bladder tankCreates no pressure differential across the bladder11.3.5.2
☐ Exterior of the bladder tankInspected for leaks during the hydrostatic test at system working pressure11.3.5.3
☐ High-pressure cylinders after system activationHydrostatically tested if more than 5 years since the last test11.3.5.4.1
☐ High-pressure cylinders with no dischargeHydrostatic test every 12 years11.3.5.4.2
☐ Water supply for foam systemsTested per Chapter 7, Chapter 8 and Chapter 911.3.6
☐ Monitors and monitor nozzlesTested per 7.3.311.3.7.1
☐ Water-powered oscillating monitorsTested per the manufacturer’s specifications, but not less than annually11.3.7.2
☐ Full-flow test of oscillating monitorsEvery 5 years, verifying range of travel and set spray pattern; alternate frequencies where AHJ-approved11.3.7.3, 11.3.7.3.1
☐ Supplementary hosesTested per NFPA 1930; hoses made to other standards per the manufacturer’s specifications11.3.8.1, 11.3.8.2
☐ Hose nozzlesTested per Chapter 23 of NFPA 193011.3.9

P. Discharge device operational test (annual discharge test)

The frequency of discharge device operational tests comes from Table 11.1.1.2 (11.3.10): the complete system and discharge device location, obstruction and position are tested annually.

CheckCriterionClause
☐ Test preparationPrecautions taken to prevent damage to property11.3.10.1
☐ Discharge would be hazardous or conflict with local requirementsApproved alternate method to achieve full-flow conditions allowed11.3.10.1.1
☐ System responseFoam-water sprinkler system responds as designed, automatically and manually; procedures simulate anticipated emergency events11.3.10.2.1, 11.3.10.2.2
☐ Full-flow test of foam-water deluge systemsMay use water only in lieu of foam11.3.10.2.3
☐ Plugs or caps on discharge devicesFull-flow test verifies they release as intended11.3.10.2.4
☐ Automatic fire detectionOperates within NFPA 72 requirements for the detector type when exposed to a test source; response time recorded11.3.10.2.5, 11.3.10.2.5.1
☐ Open discharge devicesTime lapse between detection operation and water delivery to the protected area recorded11.3.10.2.6
☐ Discharge patternsFrom all open devices, observed to be unimpeded by debris, correctly positioned and giving adequate coverage; devices may differ in orifice size and type11.3.10.2.7.1, 11.3.10.2.7.2
☐ Pressure readingsRecorded at the most hydraulically demanding discharge device and at the main control valve; compared with the original hydraulic design pressures11.3.10.2.8.1–11.3.10.2.8.3
☐ Multiple systemsMaximum number of systems expected to operate in a fire tested simultaneously to check the water supply and foam concentrate pump11.3.10.3
☐ Manual actuation devicesTested annually11.3.10.4
☐ Return to serviceAfter the full-flow test, system returned to service and the concentrate tank replenished to design level11.3.10.5

Q. Waterflow tests of fixed foam discharge outlets

CheckCriterionClause
☐ Annual waterflow testWater discharged through each fixed foam discharge outlet at least annually to confirm outlets and foam solution feed lines are not obstructed; alternative methods and frequencies identified in the standard or approved by the AHJ allowed11.3.11.1, 11.3.11.1.1
☐ During flowResidual pressure of the most remote device recorded and compared with the original hydraulic calculations; air inlet observed for water backflow11.3.11.1.2, 11.3.11.1.3

Cone roof tanks

CheckCriterionClause
☐ Outlets inaccessible for safety due to process operationsTested during each scheduled shutdown11.3.11.2.1
☐ Test planAHJ reviews and approves the plans for a waterflow test through the outlet11.3.11.2.2
☐ Means to isolate the outlet providedWaterflow tests through test connections on the foam solution risers at the tank shell allowed with AHJ approval11.3.11.2.2.1
☐ Waterflow test not possibleSupply piping may be visually inspected per Chapter 1411.3.11.2.2.2
☐ Makeup gasWhere possible, the AHJ verifies it is sufficient to remove the outlet lid for the duration of the flow test11.3.11.2.2.3
☐ Personnel accessing outlets on in-service product tanksProper PPE provided11.3.11.2.2.4
☐ Waterflow testing possibleWater not allowed to enter the storage tank11.3.11.2.2.5
☐ Tanks operating at elevated temperaturesConsideration given to conducting flow tests11.3.11.2.2.6

Internal floating roofs or geodesic dome roofs

CheckCriterionClause
☐ Outlets inaccessible for safety due to process operationsTested during each scheduled shutdown11.3.11.3(1)
☐ Personnel on in-service product tanksProper PPE11.3.11.3(2)
☐ Waterflow testing possibleWater not allowed to enter the tank except as permitted in 11.3.11.3.111.3.11.3(3)
☐ Frequency of waterflow testing onto the roofAligned with tank outages and industry inspection frequencies: short outages where product is not removed and the roof is not accessible require no test; test when the outage permits observation of water discharge and foam dam operation; foam dam tested per 11.3.11.511.3.11.3(4)
☐ Means to isolate the outlet providedWaterflow tests through test connections on the risers at the tank shell allowed as approved by the AHJ11.3.11.3.1

External floating roofs

External floating roofs have rim seal protection by either above-the-seal or below-the-seal foam application (11.3.11.4).

CheckCriterionClause
☐ Below-the-seal: inaccessible outletsTested during each scheduled shutdown11.3.11.4.1(1)
☐ Below-the-seal: personnel on in-service tankProper PPE11.3.11.4.1(2)
☐ Below-the-seal: in-service tankWaterflow injection between the seal not permitted11.3.11.4.1(3)
☐ Below-the-seal: proper isolation and flow test means providedWaterflow tests conducted with water discharge on the roof11.3.11.4.1(4)
☐ Below-the-seal: roof drainsOpen and monitored per 11.3.11.511.3.11.4.1(5)
☐ Below-the-seal: test frequencyAligned with tank outages and industry inspection frequencies; the test plan is AHJ-approved and considers outlet operating pressure, potential seal damage from waterflow or impingement, and drainage; short outages without product removal or roof access require no test11.3.11.4.1(6)
☐ Above-the-sealWaterflow tests annually with discharge onto the roof; roof drains open before testing; foam dam tested per 11.3.11.511.3.11.4.2
☐ Foam damsObserved for proper retention of water during the waterflow test; roof drains verified functioning properly11.3.11.5.1, 11.3.11.5.2

Pressure foam makers

CheckCriterionClause
☐ GeneralTesting follows the manufacturer’s recommendations11.3.11.6
☐ Gate valvesTested per 13.3.3.1; the AHJ approves operation of the gate valve downstream of the rupture disk or check valve11.3.11.6.1, 11.3.11.6.1.1
☐ Annual water flowWater discharged through each fixed foam discharge outlet at least annually; alternative methods and frequencies per the standard or AHJ approval allowed11.3.11.6.2, 11.3.11.6.2.1
☐ Before the flow testRupture discs removed; gate valves downstream of the check valve verified closed11.3.11.6.2.2, 11.3.11.6.2.3
☐ During the flow testInlet and outlet pressure at the foam maker noted and confirmed within the acceptable range per the design and manufacturer; air inlet observed for water backflow11.3.11.6.2.4, 11.3.11.6.2.5

R. Maintenance: tanks, proportioners and concentrate pumps

Foam systems are maintained per the chapters covering the specific component parts (11.4.1.1); the water supply is maintained per Chapter 7, Chapter 8 and Chapter 9 (11.4.2).

CheckCriterionClause
☐ Metallic atmospheric and pressure vessel tanks: excessive sedimentTank drained and flushed11.4.3.1.1
☐ Foam concentrate storage tankDrained and flushed (Table 11.1.1.2: every 10 years)11.4.3.1.2
☐ Drained concentrateMay be salvaged and reused11.4.3.1.3
☐ Bladder tank sight glass (where provided)Removed and cleaned11.4.3.2
☐ Standard pressure proportionersBall drip (automatic-type) drain valves disassembled, cleaned and reassembled11.4.4.1
☐ Standard and in-line balanced pressure proportioners: pumpConcentrate pump operated; concentrate circulated back to the tank11.4.4.2.1, 11.4.4.3.1
☐ Foam pumps, drive trains and driversServiced per the manufacturer’s instructions and frequency, but at intervals not exceeding 5 years11.4.4.2.2, 11.4.4.3.2
☐ Diaphragm balancing valveFlushed through the diaphragm section with water or concentrate until fluid appears clear or new11.4.4.2.3, 11.4.4.3.3
☐ Mobile apparatus proportioning systemsMaintained per 18.9.4.2 of NFPA 190011.4.4.4
☐ Water-powered proportioner pumpsLubricate the proportioning pump shaft per the manufacturer; change oil in the water-driven pump; change vanes when appropriate per the manufacturer11.4.4.5

S. Pressure vacuum vent maintenance (every 5 years)

These steps are performed on pressure vacuum vents every 5 years (11.4.4.6):

  1. Remove the vent from the expansion dome (11.4.4.6.1).
  2. Inspect that the opening is not blocked and dirt or foreign objects do not enter the tank (11.4.4.6.2).
  3. Remove the vent bonnet (11.4.4.6.3).
  4. Lift out the vacuum valve and pressure valve (11.4.4.6.4).
  5. Flush the vent body internally and wash the vacuum and pressure valves thoroughly (11.4.4.6.5).
  6. Check that the screen is not clogged; avoid hard, pointed objects to clear it (11.4.4.6.6, 11.4.4.6.6.1).
  7. If the liquid has become excessively gummy or solidified, soak the body and parts in hot soapy water (11.4.4.6.7).
  8. Turn the body upside down and drain thoroughly (11.4.4.6.8).
  9. Dry the parts in a warm, dry area or with an air hose (11.4.4.6.9).
  10. Spray the parts with a light PTFE coating and reassemble; no oil of any type for lubrication (11.4.4.6.10, 11.4.4.6.11).
  11. Replace the bonnet and turn the vent upside down slowly a few times to check freedom of the moving parts (11.4.4.6.12).
  12. Attach the vent to the tank expansion dome (11.4.4.6.13).

T. Maintenance of other components

CheckCriterionClause
☐ Monitors and monitor nozzlesMaintained per 7.4.311.4.4.7
☐ Fixed foam discharge outlets: foam chambers and foam makersMaintained per the manufacturer’s specifications11.4.4.8
☐ Vapor sealsMaintained per the manufacturer’s specifications11.4.4.8.1
☐ Pressure foam makersMaintained per the manufacturer’s specifications11.4.4.9
☐ Rupture disksMaintained and replaced per the disk manufacturer’s specifications11.4.4.9.1
☐ StrainersMaintained per Chapter 711.4.4.10
☐ Supplementary hosesMaintained per NFPA 1930 or the manufacturer’s instructions11.4.4.11
☐ Supplementary hose stream nozzlesMaintained per NFPA 193011.4.4.12
☐ Auxiliary drainsMaintained per 13.4.5.3.2 to 13.4.5.3.311.4.4.13

U. When a component is adjusted, repaired or replaced: Table 11.4.4.14.1

Whenever a foam system component is adjusted, repaired, reconditioned or replaced, the action in Table 11.4.4.14.1 is performed (11.4.4.14.1). Where the original installation standard differs from the cited one, the appropriate installing standard may be used (11.4.4.14.2). These actions do not require a design review (11.4.4.14.3). Rows without an “X” simply refer to the chapter shown on the right.

ComponentAdjustRepair/reconditionReplaceRequired action
Water delivery components
Discharge devicesX—XInspect for leaks at system working pressure; inspect for impairments at orifice
Fire department connectionsXXXSee Chapter 13
Manual releaseXXXOperational test; inspect for leaks at system working pressure; test all alarms
Pipe and fittings on systems with automatic foam-water sprinklersXXXHydrostatic test in conformance with NFPA 13
Pipe and fittings on systems with fixed foam discharge outletsXXXOperational flow test
Foam components
Ball drip (automatic-type) drain valves———See Chapter 13
Foam concentrateX—XSubmit a sample for laboratory analysis for conformance with manufacturer’s specifications
Foam concentrate pump———See Chapter 8
Foam concentrate strainer(s)———See Chapter 13
Atmospheric foam concentrate tankXXXInspect condition and repair as appropriate
Foam concentrate bladder tankXXXInspect water jacket for presence of foam concentrate
Proportioning system(s)XXXConduct flow test and inspect proportioning with an approved test device
Water supply tank(s)———See Chapter 9
Alarm and supervisory components
Detection systemXXXOperational test for conformance with NFPA 13 and/or NFPA 72
Pressure-switch-type waterflowXXXOperational test using inspector’s test connection
Valve supervisory device——XTest for conformance with NFPA 13 and/or NFPA 72
Vane-type waterflowXXXOperational test using inspector’s test connections
Water motor gong——XOperational test using inspector’s test connection
Status-indicating components
GaugesX—XVerify at 0 psi (0 bar) and system working pressure; see Chapter 13 regarding calibration
Testing and maintenance components
Auxiliary drainsXXXInspect for leaks at system working pressure
Inspector’s test connectionXXXInspect for leaks at system working pressure
Main drainXXXFull-flow main drain test
Structural components
Hanger/seismic bracingXXXInspect for conformance with NFPA 13
Pipe standsXXXInspect for conformance with NFPA 13
Informational components
General informationXXXInspect for conformance with NFPA 11 and NFPA 13
Hydraulic information signXXXInspect for conformance with NFPA 11 and NFPA 13
Valve signsXXXInspect for conformance with NFPA 11 and NFPA 13

Frequently Asked Questions

How often is foam concentrate tested under NFPA 25?

Annually. A sample is sent to the manufacturer or an approved testing laboratory for quality condition testing; where the foam type and brand are known, the test confirms the product meets the manufacturer’s specifications (11.3.1.1–11.3.1.3). Concentrate is also inspected at least annually for excessive sludging or deterioration (11.2.13.2).

What is the acceptance criterion for a proportioner test?

The induction rate, as a percentage of foam solution flow, must be within minus 0 to plus 30 percent of the manufacturer’s listed concentration or plus 1 percentage point, whichever is less (11.3.2.5.7). Concentration is measured with a digital refractometer, digital conductivity, calibrated listed digital flowmeters or other means acceptable to the AHJ (11.3.2.2).

At which flows is proportioning verified on a closed-head foam-water system?

At the maximum system design flow and at a flow equal to the four most hydraulically located sprinkler heads discharging; the same two points apply to wide-range or variable-range proportioners (11.3.2.5.3, 11.3.2.5.3.1). Open-head deluge systems are verified at the maximum design flow only (11.3.2.5.4).

Can the annual discharge test use water instead of foam?

Yes. Full-flow discharge from foam-water deluge systems may be tested with water only in lieu of foam (11.3.10.2.3). Where discharge would be hazardous or conflict with local requirements, an approved alternate full-flow method is allowed (11.3.10.1.1). After the test the concentrate tank is replenished to design level (11.3.10.5).

Which periodic tests apply to foam tanks and piping?

Standard pressure proportioner tanks and bladder tanks are hydrostatically tested every 10 years (11.3.5.1, Table 11.1.1.2). Underground foam solution and concentrate piping is hydrostatically tested at system design pressure at least every 10 years (11.2.11.8). Metallic concentrate tanks are drained and flushed every 10 years (Table 11.1.1.2, 11.4.3.1), and pressure vacuum vents are serviced every 5 years (11.4.4.6).

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report.

Download SprinkCalc on the App Store

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store
Standards & References

NFPA 25-2026, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems: Chapter 11 (11.1–11.4), Table 11.1.1.2 and Table 11.4.4.14.1. The content of Chapters 4, 6, 7, 8, 9, 13, 14 and 15 and of NFPA 11, NFPA 13, NFPA 72, NFPA 1900 and NFPA 1930 referenced by Chapter 11 is not reproduced here.