Regulations

Are fire detection and alarms required?

Enter the use, heights, number of storeys and areas; the checker gives automatic detection (75/3, Annex 7), manual call points (75/2) and sounders and beacons (81/1) with clause references. Annex 7 rows annulled by the Council of State are flagged; in the 3D cutaway a fire scenario shows the alarm spreading through the floors.

BYKHY Art. 75Annex 7 currentArt. 81 alarms3D cutaway

This tool is for preliminary sizing and checking; confirm the final design against the edition of the standard in force and the authority having jurisdiction.

Three requirements, three different tests

The Turkish fire code (BYKHY) does not ask for a fire alarm system as one item. Automatic detection (Article 75/3) depends on the Annex 7 table, manual call points (75/2) on the number of storeys and storey area, and sounders and beacons (81/1) on whether call points are required. A building can need call points without automatic detection, or the other way round. The checker gives each in its own tile.

Automatic detection: Article 75/3 and Annex 7

Automatic detection is mandatory where the structure height or the total enclosed floor area exceeds the Annex 7 value; exceeding either is enough. In such buildings detectors go in every room to TS EN 54-14 (75/5).

Annex 7 rowStructure heightTotal enclosed area
1. Residential> 51.50 m—
2. Accommodation> 6.50 m> 1000 m²
4. Offices> 30.50 m> 5000 m²
8. Storage> 6.50 m> 5000 m²
9. High-hazard premises> 6.50 m> 1000 m²

Rows 3 (education and healthcare), 5 (commercial), 6 (industrial) and 7 (restaurants, entertainment, museums and exhibitions, terminals) were annulled by the Council of State 10th Chamber on 28/12/2021 (E.2019/261, K.2021/5537), made final by the Plenary of Administrative Law Chambers on 22/2/2023. There is currently no Annex 7 threshold for these uses. That does not make detection forbidden or unnecessary: the Guide still requires the other detection and suppression provisions of the Regulation to be met, and insurers and project specifications may ask for it.

A note on offices: Table 75.3 in the commentary of the BYKHY Guide (p. 127) prints 21.50 m for offices. Annex 7 in the Guide’s appendix (p. 259), the 2015 regulation text and the consolidated text give 30.50 m. The checker follows the annex; for office projects between 21.50 and 30.50 m it is worth asking the authority.

Manual call points: Article 75/2

Call points go on escape routes so that the horizontal reach from any point of the storey is at most 60 m, mounted 110–130 cm above the floor. The distance may be reduced where disabled or elderly people are present. Single-storey buildings are not listed in 75/2; unless high-rise, call points are not required by this clause.

Sounders and beacons: Article 81

Wherever call points are mandatory, the alarm system is mandatory too (81/1). Evacuation alarms are both audible and visual except where exempted. In industrial and storage buildings where dangerous substances are kept or processed, any detection must start the evacuation alarm directly; no pre-alarm (delayed alarm) is permitted (81/2).

Linked systems

What the 3D cutaway shows

The cutaway is built from a floor plan derived from your storey area. The required elements are placed: detectors on the ceilings, call points at the corridor ends and sounder-beacons in the corridor. In the fire scenario a fire starts in a room, smoke rises to the ceiling, the nearest detector triggers and the alarm spreads through the floors. Without automatic detection the alarm only starts when a call point is pressed; with neither, the smoke spreads unnoticed.

Frequently Asked Questions

Which buildings need automatic fire detection in Turkey?

Under Article 75/3 of the Turkish fire code, buildings whose structure height or total enclosed area exceeds Annex 7: residential above 51.50 m; accommodation above 6.50 m or 1000 m²; offices above 30.50 m or 5000 m²; storage above 6.50 m or 5000 m²; high-hazard premises above 6.50 m or 1000 m². Detectors then go in every room to TS EN 54-14 (75/5).

Why is there no Annex 7 threshold for schools, hospitals and shopping centres?

The Annex 7 rows for institutional buildings (education and healthcare), commercial, industrial and assembly uses were annulled by the Council of State 10th Chamber on 28/12/2021 (E.2019/261, K.2021/5537), made final in 2023. There is no Annex 7 threshold left for these uses; other articles and project requirements are assessed separately.

When are manual call points required?

Under Article 75/2: in non-residential buildings of two to four storeys with a storey area above 400 m², in non-residential buildings with more than four storeys and in all high-rise buildings including residential. They go on escape routes with a horizontal reach of at most 60 m, 110–130 cm above the floor.

Does a sprinklered building also need heat detectors?

Under Article 75/7 sprinklered rooms count as heat-detected and rate-of-rise detectors are not mandatory there. Each zone gets a flow switch whose contacts are wired to the fire alarm system. If Annex 7 requires smoke detection, that is assessed separately.

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store

SprinkCalc — Fire Sprinkler Design in Three Standards

Run these calculations on site, offline and with PDF reports: NFPA 13, FM Global and BS EN 12845 in one iOS app.

Get SprinkCalc on the App Store

Related content