Choose the hazard, the liquid and the protection method; the wizard gives the minimum application rate, discharge time, number of fixed outlets, supplementary hose streams, concentrate and reserve from the NFPA 11-2024 tables as a clause-referenced criteria sheet.

NFPA 11-2024Chapters 4–6Criteria sheetPreliminary sizing

This tool is for preliminary sizing and checking; confirm the final design against the edition of the standard in force and the authority having jurisdiction.

38 more calculators ↓

How are design criteria developed under NFPA 11?

The design criteria of a low-expansion foam system are the result of a chain of decisions: which hazard, which liquid, how the foam is applied, at what minimum rate and for how long, how many outlets and hose streams, and how much concentrate and reserve. NFPA 11-2024 gives these in Chapter 5 with a separate table for each hazard. The wizard follows that order and writes the clause next to every line.

1. Hazard and method

Fixed-roof tanks with fixed Type II outlets (5.2.5), subsurface injection (5.2.6) or monitors and handlines (5.2.4); open-top floating roof tanks with seal area protection (5.3.5); indoor tanks (5.5); loading racks (5.6); diked areas (5.7) and nondiked spill areas (5.8) are treated separately. Foam-water sprinklers are in Chapter 6. Subsurface injection is not used for Class IA hydrocarbons or products requiring alcohol-resistant foam (5.2.6.1.1); floating roof tanks use neither subsurface injection nor monitors as the primary means (5.3.3.1, 5.3.7).

2. Rate and time

The tables give the minimum rate and minimum time. For example, a fixed-roof hydrocarbon tank with Type II outlets needs 0.10 gpm/ft² (4.1 mm/min) for 30 min at a flash point of 100–140 °F (38–60 °C), and 55 min below that or for crude (Table 5.2.5.2.2). Monitors and handlines use 0.16 gpm/ft² (6.5 mm/min), increased by a factor of at least 1.5 for wind and ambient losses (5.2.4.2.1.2). For some hazards a higher applied rate allows a proportional time reduction, never below 70 percent of the table time (5.2.5.2.3, 5.2.6.5.3, 5.3.5.3.4, 5.5.3.3).

3. Outlets and supplementary hoses

The number of fixed-roof outlets comes from Table 5.2.5.2.1, subsurface outlets from Table 5.2.6.2.8, and floating roof outlets from the spacing in Tables 5.3.5.3.1 and 5.3.5.3.6.1. In addition to the tank installation, 1–3 foam hose streams of at least 50 gpm (190 L/min) must operate for 10–30 min depending on the largest tank diameter (5.9, Tables 5.9.2.2 and 5.9.2.4).

4. Concentrate and reserve

Concentrate consumption follows the design percentage (4.3.2.5.1). The reserve meets the design requirements of the worst-case fire and puts the system back in service (4.3.2.5.2.1); the wizard takes it equal to the main quantity. Annex A.4.3.2.2 warns that the hazard with the largest solution flow does not necessarily dictate the total concentrate; a smaller tank with a longer time can need more. Each hazard is therefore calculated and the largest taken (4.3.2.2).

Where NFPA 11 gives no number

For polar liquids requiring alcohol-resistant foam the rate is mostly left to the manufacturer’s listing or fire tests (Table 5.2.5.3.4, 5.5.4, Table 5.6.5.3.1, 5.7.4.3.2, Table 5.8.1.2). For compressed air foam the minimum is the manufacturer’s listed rate (Table 5.7.3.2). The wizard does not invent a number there: without a value in “Manufacturer rate” no flow or quantity is calculated.

Scope

The wizard is based on NFPA 11-2024 Chapters 4, 5 and 6.5.2. Internal floating roof tanks (5.4) and high-expansion foam (7.12) are out of scope; use the high-expansion foam calculator for high expansion and the foam-water sprinkler calculator for spacing and ratings. Step by step: how to develop NFPA 11 design criteria.

Frequently Asked Questions

What is the minimum foam rate for a fixed-roof tank under NFPA 11?

For a fixed-roof tank storing hydrocarbons with fixed Type II outlets, at least 0.10 gpm/ft² (4.1 mm/min); the time is 30 min at a flash point of 100–140 °F (38–60 °C) and 55 min below that or for crude (NFPA 11-2024 Table 5.2.5.2.2).

Can the time be reduced with a higher rate?

For fixed-roof tanks, subsurface injection, top-of-seal floating roofs and indoor tanks, yes: the time may be reduced in proportion, but not below 70 percent of the table time (5.2.5.2.3, 5.2.6.5.3, 5.3.5.3.4, 5.5.3.3).

How many supplementary foam hose streams are needed?

By the largest tank diameter: 1 up to 65 ft (20 m), 2 from 65 to 120 ft (20–36 m), 3 above; each at least 50 gpm (190 L/min). Operating time is 10 min up to 35 ft (11 m), 20 min from 35 to 95 ft (11–29 m) and 30 min above (Tables 5.9.2.2, 5.9.2.4; 5.9.2.3).

Why is the rate for polar liquids an input?

For most liquids requiring alcohol-resistant foam NFPA 11 gives no rate and leaves it to the manufacturer’s listing or fire tests (e.g., Table 5.2.5.3.4). The wizard therefore asks for the value instead of inventing one.

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.

Download MEP Calc on the App Store

SprinkCalc — Fire Sprinkler Design in Three Standards

Run these calculations on site, offline and with PDF reports: NFPA 13, FM Global and BS EN 12845 in one iOS app.

Get SprinkCalc on the App Store

Related content

Other fire protection calculators

All calculators →